956 resultados para Port Colborne


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map of the Second Welland Canal created by the Welland Canal Company showing the canal along Chippewa Creek in Thorold Township. Identified structures and features associated with the Canal include the towing path, float bridge, and the waterway itself. The surveyors' measurements and notes can be seen in red and black ink and pencil. Local area landmarks are also identified and include a road allowance between Lot 213 and 214, Chippewa Creek, an unnamed creek, and the Old Canal. Wetlands adjacent to Chippewa Creek are illustrated. Properties and property owners of note are: Lots 213 and 214, Samuel Hill, and Duncan Coleman. The boundary of the land deeded to Coleman is outlined in blue.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Port Weller Dry Docks Limited was officially established on April 25, 1946, near Lock 1 of the Welland Canal. Charles A. Ansell was the company’s first President and General Manager. Initially, the company focused on repairing ships, but in June, 1951, built their first ship, the Scott Misener. In 1956, the Upper Lakes and St. Lawrence Transportation Co. purchased all of the shares of Port Weller Dry Docks Limited. In the mid-eighties, ULS (Upper Lakes Shipping) International (which owned the Port Weller dry docks), and Canada Steamship Lines, merged their operations. As a result, the Port Weller Dry Docks became a division of this newly formed company, known as Canadian Shipbuilding and Engineering Limited. In 2007, Seaway Marine & Industrial Inc. took over ownership of the Port Weller Dry Docks, but declared bankruptcy in July 2013.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bill to Dilly Coleman from Mr. Dilke of Port Robinson, April 11, 1850.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter from Port Robinson to Mr. Bell acknowledging the receipt for the affidavits which were sent. The writer says that he is not the owner of the land as Mr. Bell supposes. The writer is anxious for this matter to be brought before the committee and says that this matter has been 2 years in Mr. Steer’s hands in neglect. [The letter is unsigned, but the writer is probably Samuel D. Woodruff], April 10, 1849.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to George Rykert (president of the Port Dalhousie and Thorold Railway), engineer from William Danforth, civil engineer in which he states that the preliminary survey has been made between Port Dalhousie and Centreville at which point it may intersect with the Great Western Railway. The estimate is included (2 pages, handwritten), July 25, 1853.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Notice that the Port Dalhousie and Thorold Railway map and plans have been certified by commissioners. This is signed “secretary”, n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter which contains a report to George Rykert of Friends of the Port Dalhousie Thorold Railway. In this unsigned letter regarding contracts for the railway, it is suggested that the quantity of the excavation could have been done at 25 cents less per yard, July 23, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to Mr. Ingersoll, secretary of the Port Dalhousie and Thorold Railway from S.D. Woodruff regarding a letter from F. Lalor on the 25th of October which is about claims of expenses, Dec. 4, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Original estimate of Mr. Danforth on the Port Dalhousie and Thorold Railway (1 page, handwritten), Nov. 3, 1853.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Specifications and form of tender for grading for the Port Dalhousie and Thorold Railway, March (5 pages, handwritten), 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter sent from the Port Dalhousie and Thorold Railway to the Town Council of St. Catharines which states that the estimate that was submitted does not embrace the damages done to the buildings along Line no. 1 from Port Dalhousie to Chisholm Corner. The estimates are included in the document, Aug. 17, 1854.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Port Dalhousie and Thorold Railway estimate of work done to date with an approximation of probable damage sustained by suspending the track, Aug. 22, 1854.