908 resultados para Politicas publicas - Brasil - Aspectos ambientais
Resumo:
The simulation of SES-Natal Ponta Negra: mitigation of environmental risks and predictive maintenance strategy was developed in the context of several operational irregularities in the pumping stations and sewage systems in the system Ponta Negra. Thus, the environmental risks and complaints against the company due to overflows of sewage into the public thoroughfare became common. This neighborhood has shown in recent years an increase of resident higher than the initial expectation of growth. In this sense presumed the large population growth and generation of sewers higher than expected, associated to the use of corrective maintenance and misuse of the system may be the main causes of operational failures occurring in the SES. This study aimed at analyzing the hydraulic behavior of SES Ponta Negrathrough numerical simulation of its operation associated to future scenarios of occupation. The SES Ponta Negra has a long lengthof collection networks and 6 pumping stations interconnected, being EE 1, 2, 4 coastal way, and beach Shopping interconnected EE3 to receives all sewers pumped from the rest pumping station and pumped to the sewage treatment station of neighborhood which consists of a facultative pond followed by three maturation ponds with disposal of treated effluent into infiltration ditches. Oncethey are connected with each other, the study was conducted considering the days and times of higher inflow for all lifts. Furthermore, with the aim of measuring the gatherer network failures were conducted data survey of on the networks. Thephysical and operational survey data was conducted between January/2011 and janeiro/2012. The simulation of the SES was developed with the aim ofdemonstrating its functioning, eithercurrently and in the coming years, based in population estimates and sewage flow. The collected data represents the current framework of the pumping stations of the SES Ponta Negra and served as input to the model developed in MS Excel ® spreadsheet which allowed simulating the behavior of SES in future scenarios. The results of this study show thatBeach Shopping Pumping Station is actually undersized and presents serious functioning problemsthatmay compromise the environmental quality of surrounding area. The other pumping stations of the system will reach itsmaximum capacity between 2013 and 2015, although the EE1 and EE3 demonstrateoperation capacity, even precariously, until 2017. Moreover, it was observed that the misuse of the network system, due to the input of both garbage and stormwater, are major factors of failures that occur in the SES. Finally, it was found that the corrective maintenance appliance, rather than predictive,has proven to beinefficient because of the serious failuresin the system, causing damage to the environment and health risks to users
Resumo:
The accelerated industrialization, coming with the Industrial Revolution, caused profound changes in the working world. These changes led to the households risks from work environment. Trying to assist comprehensively the health of workers, Brazil has a program of Health Care Workers in the Primary Care, and the Family Health Strategy is the main entrance for this system. The study sought to determine if the actions of the health care worker have been developed in primary care through the Family Health Strategy. This is a quantitative study with a methodological evaluation, focusing on normative assessment. The sample was formed by professionals from Team Family Health Strategy, in the municipalities of Pau dos Ferros, Caicó and Natal in Rio Grande do Norte state. The sample consists of 202 professionals (Doctors, Nurses, Assistant / Technician Nursing and Community Health Workers) in 52 Health Family Units from the 3 municipalities cited. The instrument used consists of a checklist, from Manual of Primary Care 5 - Family Health - Occupational Health, Ministry of Health. The data were analyzed describing the variables by its frequency and doing a classification of cities from the scores obtained by each. It was observed that the Family Health professionals know the program of health care worker, however do not know the Manual of Primary Care 5, which is a guidance tool. As a result of non-appropriation of the FHT professionals with worker health, these activities are not performed, mainly surveillance in occupational health and health education labor
Resumo:
A Política Nacional do Meio Ambiente tem como objetivo a conciliação do desenvolvimento econômico e social com a qualidade ambiental, e dispõe de vários instrumentos que procuram contemplara capacidade de suporte do meio. Assim, a discussão sobre a localização das atividades é uma etapa importante para a avaliação da viabilidade ambiental de um determinado empreendimento, notadamente em processos de licenciamento ambiental. O trabalho apresenta uma abordagem metodológica para integração de critérios técnicos, ambientais e sociais em estudos de alternativas de localização de aterros sanitários, com especial atenção à interação entre os aspectos ambientais e os elementos fundamentais de um projeto (a saber, requisitos locacionais e concepção tecnológica), aplicado em um estudo de caso em São Carlos (SP). Como resultados principais, destacam-se o maior foco nos impactos significativos e a possibilidade de envolvimento de segmentos importantes da sociedade previamente à elaboração dos estudos ambientais.
Resumo:
Incluye Bibliografía
Resumo:
Incluye Bibliografía
Resumo:
Incluye Bibliografía
Resumo:
Incluye Bibliografía
Resumo:
Pós-graduação em Geografia - IGCE
Resumo:
Incluye Bibliografía
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Ciências Sociais - FFC
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Pós-graduação em Geografia - FCT