823 resultados para Planning of actions
Resumo:
Australian airports have emerged as important urban activity centres over the past decade as a result of privatisation. A range of reciprocal airport and regional impacts now pose considerable challenges for both airport operation and the surrounding urban and regional environment. The airport can no longer be managed solely as a specialised transport entity in isolation from the metropolis that it serves. In 2007 a multidisciplinary Australian Research Council Linkage Project (LP 0775225) was funded to investigate the changing role of airports in Australia. This thesis is but one component of this collaborative research effort. Here the issues surrounding the policy and practice of airport and regional land use planning are explored, analysed and detailed. This research, for the first time, assembles a distinct progression of the wider social, economic, technological and environmental roles of the airport within the Australian airport literature from 1914 – 2011. It recognises that while the list of airport and regional impacts has grown through time, treatment within practice and the literature has largely remained highly specialised and contained within disciplinary paradigms. The first publication of the thesis (Chapter 2) acknowledges that the changing role of airports demands the establishment of new models of airport planning and development. It argues that practice and research requires a better understanding of the reciprocal impacts of airports and their urban catchments. The second publication (Chapter 3) highlights that there is ad hoc examination and media attention of high profile airport and regional conflict, but little empirical analysis or understanding of the extent to which all privatised Australian airports are intending to develop. The conceptual and methodological significance of this research is the development of a national land use classification system for on-airport development. This paper establishes the extent of on-airport development in Australia, providing insight into the changing land use and economic roles of privatised airports. The third publication (Chapter 4) details new and significant interdependencies for airport and regional development in consideration of the progression of airports as activity centres. Here the model of an ‘airport metropolis’ is offered as an organising device and theoretical contribution for comprehending the complexity and planning of airport and regional development. It delivers a conceptual framework for both research and policy, which acknowledges the reciprocal impacts of economic development, land use, infrastructure and governance ‘interfaces’. In a timely and significant concurrence with this research the Australian Government announced and delivered a National Aviation Policy Review (2008 – 2009). As such the fourth publication (Chapter 5) focuses on the airport and urban planning aspects of the review. This paper also highlights the overall policy intention of facilitating broader airport and regional collaborative processes. This communicative turn in airport policy is significant in light of the communicative theoretical framework of the thesis. The fifth paper of the thesis (Chapter 6) examines three Australian case studies (Brisbane, Adelaide and Canberra) to detail the context of airport and regional land use planning and to apply the airport metropolis model as a framework for research. Through the use of Land Use Forums, over 120 airport and regional stakeholders are brought together to detail their perspectives and interactions with airport and regional land use planning. An inductive thematic analysis of the results identifies three significant themes which contribute to the fragmentation of airport and regional and land use planning: 1) inadequate coordination and disjointed decision-making; 2) current legislative and policy frameworks; and 3) competing stakeholder priorities and interests. Building on this new knowledge, Chapter 7 details the perceptions of airport and local, state and territory government stakeholders to land use relationships, processes and outcomes. A series of semi-structured interviews are undertaken in each of the case studies to inform this research. The potential implications for ongoing communicative practice are discussed in conclusion. The following thesis represents an incremental and cumulative research process which delivers new knowledge for the practical understanding and research interpretation of airport and regional land use planning practice and policy. It has developed and applied a robust conceptual framework which delivers significant direction for all stakeholders to better comprehend the relevance of airports in the urban character and design of our cities.
Resumo:
Critical road infrastructure (such as tunnels and overpasses) is of major significance to society and constitutes major components of interdependent, ‘systems and networks’. Failure in critical components of these wide area infrastructure systems can often result in cascading disturbances with secondary and tertiary impacts - some of which may become initiating sources of failure in their own right, triggering further systems failures across wider networks. Perrow1) considered the impact of our increasing use of technology in high-risk fields, analysing the implications on everyday life and argued that designers of these types of infrastructure systems cannot predict every possible failure scenario nor create perfect contingency plans for operators. Challenges exist for transport system operators in the conceptualisation and implementation of response and subsequent recovery planning for significant events. Disturbances can vary from reduced traffic flow causing traffic congestion throughout the local road network(s) and subsequent possible loss of income to businesses and industry to a major incident causing loss of life or complete loss of an asset. Many organisations and institutions, despite increasing recognition of the effects of crisis events, are not adequately prepared to manage crises2). It is argued that operators of land transport infrastructure are in a similar category of readiness given the recent instances of failures in road tunnels. These unexpected infrastructure failures, and their ultimately identified causes, suggest there is significant room for improvement. As a result, risk profiles for road transport systems are often complex due to the human behaviours and the inter-mix of technical and organisational components and the managerial coverage needed for the socio-technical components and the physical infrastructure. In this sense, the span of managerial oversight may require new approaches to asset management that combines the notion of risk and continuity management. This paper examines challenges in the planning of response and recovery practices of owner/operators of transport systems (above and below ground) in Australia covering: • Ageing or established infrastructure; and • New-build infrastructure. With reference to relevant international contexts this paper seeks to suggest options for enhancing the planning and practice for crisis response in these transport networks and as a result support the resilience of Critical Infrastructure.
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
Executive Summary Emergency Departments (EDs) locally, nationally and internationally are becoming increasingly busy. Within this context, it can be challenging to deliver a health service that is safe, of high quality and cost-effective. Whilst various models are described within the literature that aim to measure ED ‘work’ or ‘activity’, they are often not linked to a measure of costs to provide such activity. It is important for hospital and ED managers to understand and apply this link so that optimal staffing and financial resourcing can be justifiably sought. This research is timely given that Australia has moved towards a national Activity Based Funding (ABF) model for ED activity. ABF is believed to increase transparency of care and fairness (i.e. equal work receives equal pay). ABF involves a person-, performance- or activity-based payment system, and thus a move away from historical “block payment” models that do not incentivise efficiency and quality. The aim of the Statewide Workforce and Activity-Based Funding Modelling Project in Queensland Emergency Departments (SWAMPED) is to identify and describe best practice Emergency Department (ED) workforce models within the current context of ED funding that operates under an ABF model. The study is comprised of five distinct phases. This monograph (Phase 1) comprises a systematic review of the literature that was completed in June 2013. The remaining phases include a detailed survey of Queensland hospital EDs’ resource levels, activity and operational models of care, development of new resource models, development of a user-friendly modelling interface for ED mangers, and production of a final report that identifies policy implications. The anticipated deliverable outcome of this research is the development of an ABF based Emergency Workforce Modelling Tool that will enable ED managers to profile both their workforce and operational models of care. Additionally, the tool will assist with the ability to more accurately inform adequate staffing numbers required in the future, inform planning of expected expenditures and be used for standardisation and benchmarking across similar EDs. Summary of the Findings Within the remit of this review of the literature, the main findings include: 1. EDs are becoming busier and more congested Rising demand, barriers to ED throughput and transitions of care all contribute to ED congestion. In addition requests by organisational managers and the community require continued broadening of the scope of services required of the ED and further increases in demand. As the population live longer with more lifestyle diseases their propensity to require ED care continues to grow. 2. Various models of care within EDs exist Models often vary to account for site specific characteritics to suit staffing profile, ED geographical location (e.g. metropolitan or rural site), and patient demographic profile (e.g. paediatrics, older persons, ethnicity). Existing and new models implemented within EDs often depend on the target outcome requiring change. Generally this is focussed on addressing issues at the input, throughput or output areas of the ED. Even with models targeting similar demographic or illness, the structure and process elements underpinning the model can vary, which can impact on outcomes and variance to the patient and carer experience between and within EDs. Major models of care to manage throughput inefficiencies include: A. Workforce Models of Care focus on the appropriate level of staffing for a given workload to provide prompt, timely and clinically effective patient care within an emergency care setting. The studies reviewed suggest that the early involvement of senior medical decision maker and/or specialised nursing roles such as Emergency Nurse Practitioners and Clinical Initiatives Nurse, primary contact or extended scope Allied Health Practitioners can facilitate patient flow and improve key indicators such as length of stay and reducing the number of those who did not wait to be seen amongst others. B. Operational Models of Care within EDs focus on mechanisms for streaming (e.g. fast-tracking) or otherwise grouping patient care based on acuity and complexity to assist with minimising any throughput inefficiencies. While studies support the positive impact of these models in general, it appears that they are most effective when they are adequately resourced. 3. Various methods of measuring ED activity exist Measuring ED activity requires careful consideration of models of care and staffing profile. Measuring activity requires the ability to account for factors including: patient census, acuity, LOS, intensity of intervention, department skill-mix plus an adjustment for non-patient care time. 4. Gaps in the literature Continued ED growth calls for new and innovative care delivery models that are safe, clinically effective and cost effective. New roles and stand-alone service delivery models are often evaluated in isolation without considering the global and economic impact on staffing profiles. Whilst various models of accounting for and measuring health care activity exist, costing studies and cost effectiveness studies are lacking for EDs making accurate and reliable assessments of care models difficult. There is a necessity to further understand, refine and account for measures of ED complexity that define a workload upon which resources and appropriate staffing determinations can be made into the future. There is also a need for continued monitoring and comprehensive evaluation of newly implemented workforce modelling tools. This research acknowledges those gaps and aims to: • Undertake a comprehensive and integrated whole of department workforce profiling exercise relative to resources in the context of ABF. • Inform workforce requirements based on traditional quantitative markers (e.g. volume and acuity) combined with qualitative elements of ED models of care; • Develop a comprehensive and validated workforce calculation tool that can be used to better inform or at least guide workforce requirements in a more transparent manner.
Resumo:
Introduction When it comes to sustainable economic development, it is hard to go past the thought of investment in information technology (IT). The foundation of sustainable economic development is sustainable infrastructure. This situation means that investment in IT is about developing sustainable IT infrastructure. An IT infrastructure is a set of IT tools on which organisations could develop applications to manage their varying business processes. At a national economic level, this is all about developing a national IT infrastructure to provide social and economic services to the various stakeholders. Current troubling economic times call for collaboration and centrality in IT infrastructure development. This notion has led to the idea of national broadband networks, sustainable telecommunication platforms, and national IT development plans and goals. However, these thoughts and actions do not directly impact the critical social and economic processes of organisations. That is, these thoughts set the tone and direction of actions
Resumo:
With increasing signs of climate change and the influence of national and international carbon-related laws and agreements, governments all over the world are grappling with how to rapidly transition to low-carbon living. This includes adapting to the impacts of climate change that are very likely to be experienced due to current emission levels (including extreme weather and sea level changes), and mitigating against further growth in greenhouse gas emissions that are likely to result in further impacts. Internationally, the concept of ‘Biophilic Urbanism’, a term coined by Professors Tim Beatley and Peter Newman to refer to the use of natural elements as design features in urban landscapes, is emerging as a key component in addressing such climate change challenges in rapidly growing urban contexts. However, the economics of incorporating such options is not well understood and requires further attention to underpin a mainstreaming of biophilic urbanism. Indeed, there appears to be an ad hoc, reactionary approach to creating economic arguments for or against the design, installation or maintenance of natural elements such as green walls, green roofs, streetscapes, and parklands. With this issue in mind, this paper will overview research as part of an industry collaborative research project that considers the potential for using a number of environmental economic valuation techniques that have evolved over the last several decades in agricultural and resource economics, to systematically value the economic value of biophilic elements in the urban context. Considering existing literature on environmental economic valuation techniques, the paper highlights opportunities for creating a standardised language for valuing biophilic elements. The conclusions have implications for expanding the field of environmental economic value to support the economic evaluations and planning of the greater use of natural elements in cities. Insights are also noted for the more mature fields of agricultural and resource economics.
Resumo:
Introduction Given the known challenges of obtaining accurate measurements of small radiation fields, and the increasing use of small field segments in IMRT beams, this study examined the possible effects of referencing inaccurate field output factors in the planning of IMRT treatments. Methods This study used the Brainlab iPlan treatment planning system to devise IMRT treatment plans for delivery using the Brainlab m3 microMLC (Brainlab, Feldkirchen, Germany). Four pairs of sample IMRT treatments were planned using volumes, beams and prescriptions that were based on a set of test plans described in AAPM TG 119’s recommendations for the commissioning of IMRT treatment planning systems [1]: • C1, a set of three 4 cm volumes with different prescription doses, was modified to reduce the size of the PTV to 2 cm across and to include an OAR dose constraint for one of the other volumes. • C2, a prostate treatment, was planned as described by the TG 119 report [1]. • C3, a head-and-neck treatment with a PTV larger than 10 cm across, was excluded from the study. • C4, an 8 cm long C-shaped PTV surrounding a cylindrical OAR, was planned as described in the TG 119 report [1] and then replanned with the length of the PTV reduced to 4 cm. Both plans in each pair used the same beam angles, collimator angles, dose reference points, prescriptions and constraints. However, one of each pair of plans had its beam modulation optimisation and dose calculation completed with reference to existing iPlan beam data and the other had its beam modulation optimisation and dose calculation completed with reference to revised beam data. The beam data revisions consisted of increasing the field output factor for a 0.6 9 0.6 cm2 field by 17 % and increasing the field output factor for a 1.2 9 1.2 cm2 field by 3 %. Results The use of different beam data resulted in different optimisation results with different microMLC apertures and segment weightings between the two plans for each treatment, which led to large differences (up to 30 % with an average of 5 %) between reference point doses in each pair of plans. These point dose differences are more indicative of the modulation of the plans than of any clinically relevant changes to the overall PTV or OAR doses. By contrast, the maximum, minimum and mean doses to the PTVs and OARs were smaller (less than 1 %, for all beams in three out of four pairs of treatment plans) but are more clinically important. Of the four test cases, only the shortened (4 cm) version of TG 119’s C4 plan showed substantial differences between the overall doses calculated in the volumes of interest using the different sets of beam data and thereby suggested that treatment doses could be affected by changes to small field output factors. An analysis of the complexity of this pair of plans, using Crowe et al.’s TADA code [2], indicated that iPlan’s optimiser had produced IMRT segments comprised of larger numbers of small microMLC leaf separations than in the other three test cases. Conclusion: The use of altered small field output factors can result in substantially altered doses when large numbers of small leaf apertures are used to modulate the beams, even when treating relatively large volumes.
Resumo:
4D modeling - the simulation and visualisation of the construction process - is now a common method used during the building construction process with reasonable support from existing software. The goal of this paper is to examine the information needs required to model the deconstruction/demolition process of a building. The motivation is the need to reduce the impacts on the local environment during the deconstruction process. The focus is on the definition and description of the activities to remove building components and on the assessment of the noise, dust and vibration implications of these activities on the surrounding environment. The outcomes of the research are: i. requirements specification for BIM models to support operational deconstruction process planning, ii. algorithms for augmenting the BIM with the derived information necessary to automate planning of the deconstruction process with respect to impacts on the surrounding environment, iii. algorithms to build naive deconstruction activity schedules.
Resumo:
PURPOSE Accurate monitoring of prevalence and trends in population levels of physical activity is fundamental to the planning of health promotion and disease-prevention strategies. Test-retest reliability (repeatability) was assessed for four self-report measures of physical activity commonly used in population surveys: the Active Australia survey (AA, N=356), the short form of the International Physical Activity Questionnaire (IPAQ-S, N=104), the physical activity items in the Behavioral Risk Factor Surveillance System (BRFSS, N=127) and the physical activity items in the Australian National Health Survey (NHS, N=122). METHODS Percent agreement and Kappa statistics were used to assess the reliability of classification of activity status (where ‘active’= 150 minutes of activity per week) and sedentariness (where ‘sedentary’ = reporting no physical activity). Intraclass correlations (ICCs) were used to assess agreement on minutes of activity reported for each item of each survey and on total minutes reported in each survey. RESULTS Percent agreement scores for both activity status and sedentariness were very good on all four instruments. Overall the percent agreement between repeated surveys was between 73% (NHS) and 87% (IPAQ) for the criterion measure of achieving 150 minutes per week, and between 77% (NHS) and 89% (IPAQ) for the criterion of being sedentary. Corresponding Kappa statistics ranged from 0.46 (NHS) to 0.61 (AA) for activity status and from 0.20 (BRFSS) to 0.52 (AA) for sedentariness. For the individual items ICCs were highest for walking (0.45 to 0.56) and vigorous activity (0.22 to 0.64) and lowest for the moderate questions (0.16 to 0.44). CONCLUSION All four measures provide acceptable levels of test-retest reliability for assessing both activity status and sedentariness, and moderate reliability for assessing total minutes of activity. Supported by the Australian Commonwealth Department of Health and Ageing.
Resumo:
Voluntary and compliance markets for forest carbon and other (emission avoidance and biosequestration) activities are growing internationally and across Australia. Queensland and its Natural Resource Management (NRM) regions have an opportunity to take a variety of actions to help guide these markets to secure multiple landscape benefits and to build landscape resilience in the face of climate change. As the national arrangements for offsets within Australia’s Clean Energy Package (CEP) and emissions trading environment emerge, Queensland’s regions can prepare themselves and their landholding communities to take advantage of these opportunities to deliver improved climate resilience in their regional landscapes.
Resumo:
In large sedimentary basins with layers of different rocks, the groundwater flow between aquifers depends on the hydraulic conductivity (K) of the separating low-permeable rocks, or aquitards. Three methods were developed to evaluate K in aquitards for areas with limited field data: • Coherence and harmonic analysis: estimates the regional-scale K based on water-level fluctuations in adjacent aquifers. • Cokriging and Bayes' rule: infers K from downhole geophysical logs. • Fluvial process model: reproduces the lithology architecture of sediment formations which can be converted to K. These proposed methods enable good estimates of K and better planning of further drillholes.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
A hybrid energy storage system (HESS) consisting of battery and supercapacitor (SC) is proposed for use in a wind farm in order to achieve power dispatchability. In the designed scheme, the rate of charging/discharging powers of the battery is controlled while the faster wind power transients are diverted to the SC. This enhances the lifetime of the battery. Furthermore, by taking into consideration the random nature of the wind power, a statistical design method is developed to determine the capacities of the HESS needed to achieve specified confidence level in the power dispatch. The proposed approach is useful in the planning of the wind farm-HESS scheme and the coordination of the power flows between the battery and SC.
Resumo:
Battery energy storage system (BESS) is to be incorporated in a wind farm to achieve constant power dispatch. The design of the BESS is based on the forecasted wind speed, and the technique assumes the distribution of the error between the forecasted and actual wind speeds is Gaussian. It is then shown that although the error between the predicted and actual wind powers can be evaluated, it is non-Gaussian. With the known distribution in the error of the predicted wind power, the capacity of the BESS can be determined in terms of the confident level in meeting specified constant power dispatch commitment. Furthermore, a short-term power dispatch strategy is also developed which takes into account the state of charge (SOC) of the BESS. The proposed approach is useful in the planning of the wind farm-BESS scheme and in the operational planning of the wind power generating station.
Resumo:
The wave of democratisation across Europe, Africa, Asia and Latin America in the early 1990s triggered an increase in donor funding to media assistance initiatives, primarily within good governance policy frameworks. However, few media assistance projects have managed to effectively evaluate the impacts of their work. This thesis explores how the impacts of Australian media assistance on social change and governance can be most effectively evaluated and understood. The findings of this research suggest the importance of early investment in participatory planning of evaluation designs, which are then periodically revisited. These evaluation designs should be based on a theoretically sound link between models of change, evaluative questions and methods.