877 resultados para Incomplete contract


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We analyze simultaneous discrete public good games wi.th incomplete information and continuous contributions. To use the terminology of Admati and Perry (1991). we consider comribution and subscription games. In the former. comrioutions are :1ot rcfunded if the project is not completed. while in thp. iatter they are. For the special case whp.re provision by a single player is possible we show the existence of an equilibrium in Doth cootribution and subscription games where a player decides to provide the good by himself. For the case where is not feasible for a single player to provide the good by himself, we show that any equilibriwn of both games is inefficient. WE also provide a sufficient condition for "contributing zero" to be the unique equilibrium of the contribution garoe with n players and characterize e

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We analyze simultaneous discrete public good games with incomplete information and continuous contributions. To use the tenninology of Admati and Perry (1991), we consider contribution and subscription games. In the former, contributions are not refunded ifthe project is not completed, while in the latter they are. For the special case where provision by a single player is possible we show the existence of an equihbrium in both contnbution and subscription games where a player decides to provide the good by himself. For the case where is not feasible for a single player to provide the good by himself: we show that there exist equilibria of the subscription game where each participant pays the same amount. Moreover, using the technical apparatus from Myerson (1981) we show that neither the subscription nor the contribution games admit ex-post eÁ cient equibbria. hl addition. we provide a suÁ cient condition for êontributing zero 'to be the unique equihbrium of the contnbution game with n players.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We construct a model in which a first mover decides on its location before it knows the identity of the second mover; joint location results in a negative extemality. Contracts are inherently incomplete since the first mover's initial decision cannot be specified. We analyze several kinds of rights, including damages, injunctions, and rights to exclude (arising from covenants or land ownership). There are cases in which allocating any of these basic rights to the first mover-i.e., first-party rights-is dominated by second-party rights, and cases in which the reverse is true. A Coasian result (efficiency regardless of the rights allocation) only holds under a limited set of conditions. As corollaries of a theorem ranking the basic rights regimes, a number of results emerge contradicting conventional wisdom, including the relative inefficiency of concentrated land ownership and the relevance of the generator's identity. We conclude with a mechanism and a new rights regime that each yield the first best in all cases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este trabalho acadêmico explora, em linhas gerais, a questão da adaptação do contrato de investimento internacional, e o tema ‘cláusula de hardship’ em específico. Objetiva-se efetuar uma análise detalhada da cláusula de hardship, como meio de adaptação e flexibilização de contratos internacionais de investimento sob a ótica da prática jurídica e mercantil contemporânea. A discussão se centra no contraste entre a possibilidade de adaptação do contrato por circunstâncias imprevisíveis e o imperativo de previsibilidade no investimento. Nesse sentido, o estudo busca oferecer soluções práticas para o dilema existente entre a necessidade de segurança na relação econômica (cumprimento do contato) e a prevenção da possibilidade de ruína financeira para quaisquer das partes no caso de uma mudança brusca no contexto dos negócios. O trabalho está centrado em uma investigação teórica acerca dos temas de readaptação contratual; diferenças entre sistemas jurídicos de estados-nações, e suas consequências no comércio internacional; e a cláusula de hardship em si. Como forma de contribuir para uma compreensão prática na questão da adaptação do contrato de investimento internacional devido a fatores imprevistos, este trabalho analisa casos reais e tendências atuais observadas na arbitragem internacional.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Implementation and collapse of exchange rate pegging schemes are recur- rent events. A currency crisis (pegging) is usually followed by an economic downturn (boom). This essay explains why a benevolent government should pursue Þscal and monetary policies that lead to those recurrent currency crises and subsequent periods of pegging. It is shown that the optimal policy induces a competitive equilibrium that displays a boom in periods of below average de- valuation and a recession in periods of above average devaluation. A currency crisis (pegging) can be understood as an optimal policy answer to a recession (boom).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates heterogeneity in the market assessment of public macro- economic announcements by exploring (jointly) two main mechanisms through which macroeconomic news might enter stock prices: instantaneous fundamental news im- pacts consistent with the asset pricing view of symmetric information, and permanent order ow e¤ects consistent with a microstructure view of asymmetric information related to heterogeneous interpretation of public news. Theoretical motivation and empirical evidence for the operation of both mechanisms are presented. Signi cant in- stantaneous news impacts are detected for news related to real activity (including em- ployment), investment, in ation, and monetary policy; however, signi cant order ow e¤ects are also observed on employment announcement days. A multi-market analysis suggests that these asymmetric information e¤ects come from uncertainty about long term interest rates due to heterogeneous assessments of future Fed responses to em- ployment shocks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incomplete markets and non-default borrowing constraints increase the volatility of pricing kernels and are helpful when addressing assetpricing puzzles. However, ruling out default when markets are in complete is suboptimal. This paper endogenizes borrowing constraints as an intertemporal incentive structure to default. It modeIs an infinitehorizon economy, where agents are allowed not to pay their liabilities and face borrowing constraints that depend on the individual history of default. Those constraints trade off the economy's risk-sharing possibilities and incentives to prevent default. The equilibrium presents stationary properties, such as an invariant distribution for the assets' solvency rate.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Não é de hoje que o país assiste à descoberta de incontáveis casos de desvios de recursos públicos ou mesmo à má gestão de contratos de obra pública que ocasionam, além de grave prejuízo ao Erário, danos à sociedade, muitas vezes desprovida da utilidade que seria proporcionada pelo pactuado. Essas condutas normalmente são ensejadas por projetos de engenharia que podem ser considerados meras peças de ficção, pois não representam o esforço correto para a execução do bem que se deseja construir. A Lei nº 8.666/93 permite a licitação com base em projeto básico, o que, segundo a atual onda de pensamento brasileira, seja da doutrina, dos órgãos de controle, do Poder Legislativo e até mesmo da mídia, é, de fato, um sério problema a ser enfrentado, pois a sua contratação dá margem a aditivos, entendidos como os grandes vilões das obras públicas. Por isso, o Tribunal de Contas da União vem decidindo no sentido de fortemente restringir a possibilidade de alteração contratual e, além disso, tem capitaneado projetos no Congresso Nacional que visam praticamente à extinção da empreitada por preço unitário, espécie contratual na qual o risco do projeto, ainda sem as definições necessárias, acaba por ser assumido pela Administração contratante, responsável pela elaboração, e não pelo seu executor. Contudo, no caso de obras complexas de infraestrutura, deve-se perquirir se essa postura, que pretende acabar com a margem decisória do gestor público quanto à extensão da incompletude do projeto básico - e, portanto, do objeto do contrato -, merece ser repensada, não com vistas a possibilitar os recorrentes danos, mas no caminho de uma melhor programação das ações estatais. Isso porque nessas hipóteses, a busca por todas as informações necessárias para a confecção do projeto a ser ao final executado, no momento da elaboração do edital, ou é muito custosa ou simplesmente não é possível. Assim, seria mais eficiente a contratação integrada, prevista na Lei do Regime Diferenciado de Contratação, na qual o risco do projeto pode se alocado ao contratado. Ocorre que, como existem restrições, nem sempre é viável esse caminho. Nessa ordem de ideias, deve-se encontrar uma solução para que o tradicional contrato de obra pública supere os seus graves problemas de incentivos. A proposta do presente trabalho é a introdução de um procedimento de tomada de decisão transparente, que confira segurança jurídica e amplo conhecimento da sociedade, além de livre acesso aos órgãos de controle, a partir de critérios não apenas jurídicos, mas econômicos e técnicos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)