933 resultados para Construction Civil
Resumo:
Employees’ safety climate perceptions dictate their safety behavior because individuals act based on their perceptions of reality. Extensive empirical research in applied psychology has confirmed this relationship. However, rare efforts have been made to investigate the factors contributing to a favorable safety climate in construction research. As an initial effort to address the knowledge gap, this paper examines factors contributing to a psychological safety climate, an operationalization of a safety climate at the individual level, and, hence, the basic element of a safety climate at higher levels. A multiperspective framework of contributors to a psychological safety climate is estimated by a structural equation modeling technique using individual questionnaire responses from a random sample of construction project personnel. The results inform management of three routes to psychological safety climate: a client’s proactive involvement in safety management, a workforce-friendly workplace created by the project team, and transformational supervisors’ communication about safety matters with the workforce. This paper contributes to the field of construction engineering and management by highlighting a broader contextual influence in a systematic formation of psychological safety climate perceptions.
Resumo:
This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.
Resumo:
The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.
Resumo:
Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.
Resumo:
The Global Financial Crisis (GFC) in 2008 had a significant impact on the world economy and the construction industry was no exception. This study investigates the major impacts of the 2008 GFC on the Australian construction industry and, in particular how the Australian construction contractors responded to the economic downturn. A total of 35 senior managers from the Top 100 Australian construction companies were interviewed. The findings indicate that construction companies, particularly the large ones were not affected in any significant way but are expecting some difficult financial times over the next few years and are taking actions to minimize the upcoming adverse impacts. The most common strategy adopted by Australian construction contractors is to concentrate on core business while avoiding aimless bidding. Similarly, great focus is placed on retaining human resources in order to maintain the skill set so that the company can respond quickly when market conditions improves. The research findings will provide construction contractors with insights on how to establish and sustain competitive advantages during economic slowdown and become more resilient in the future.
Resumo:
To meet clients/owners’ multidimensional and changing requirements, construction management consultants (CMCs) ought to possess a diverse and dynamic knowledge structure. In China, although the population of CMCs has grown to the point of their being indispensable in the industry, their knowledge structure has not been explored explicitly. The study presented in this paper investigated this by first conducting a comprehensive content analysis of the curricula of the highest ranked construction management university courses in China. This was followed by in-depth interviews with experts, resulting in the identification of 22 main knowledge areas that can be grouped into technology, economy, management and law. A questionnaire survey was then conducted among 115 experienced CMCs to evaluate the current level of knowledge in these areas together with their importance and need-for-improvement. The main findings demonstrate the significance of the identified 22 knowledge areas, and they also need substantial improvement in practice. The research has practical implications for China's CMCs to develop necessary knowledge and the extent to which they need to be improved to provide a better quality of services in future.
Resumo:
Energy-efficient, economical and durable building materials are essential for sustainable construction practices. The paper deals with production and properties of energy-efficient steam-cured stabilised soil blocks used fbr masonry construction. Problems of mixing expansive soil and lime, and production of blocks using soil-lime mixtures have been discussed briefly. Details of steam curing of stabilised soil blocks and properties of such blocks are given. A comparison of energy content of steam-cured soil blocks and burnt bricks is presented. It has been shown that energy-efficient steam cured soil blocks (consuming 35% less thermal energy compared to burnt clay bricks) having high compressive strength can be easily produced in a decentralised manner.
Resumo:
Although statistical data in some developed countries indicate that migrant workers are nearly 30% more likely to have work-related injuries than local workers, no equivalent official injury/ incident statistics on the health and safety (H&S) of migrant workers are currently tracked in Australia. With increasing numbers of migrant workers having joined Australia’s extractive industries infrastructure and commercial construction industry, this suggests the need for some investigation. A particular issue is that lack of H&S communication is one of the key factors leading to construction industry accidents/ incidents as it prevents workers from effectively receiving H&S safety training and acquiring H&S information. Migrant workers whose first languages are not English are particularly affected by this problem and ways are needed to improve their situation. The research aims to do this by evaluating the H&S communication problems of migrant workers and identify an effective H&S communication structure. An overview of the challenge being addressed by the research is firstly provided, followed by a description of the research framework, and a report of the initial findings, from which recommendations are provided for improving H&S performance in the construction industry.
Resumo:
This paper presents an approach, based on Lean production philosophy, for rationalising the processes involved in the production of specification documents for construction projects. Current construction literature erroneously depicts the process for the creation of construction specifications as a linear one. This traditional understanding of the specification process often culminates in process-wastes. On the contrary, the evidence suggests that though generalised, the activities involved in producing specification documents are nonlinear. Drawing on the outcome of participant observation, this paper presents an optimised approach for representing construction specifications. Consequently, the actors typically involved in producing specification documents are identified, the processes suitable for automation are highlighted and the central role of tacit knowledge is integrated into a conceptual template of construction specifications. By applying the transformation, flow, value (TFV) theory of Lean production the paper argues that value creation can be realised by eliminating the wastes associated with the traditional preparation of specification documents with a view to integrating specifications in digital models such as Building Information Models (BIM). Therefore, the paper presents an approach for rationalising the TFV theory as a method for optimising current approaches for generating construction specifications based on a revised specification writing model.
Resumo:
Purpose – Preliminary cost estimates for construction projects are often the basis of financial feasibility and budgeting decisions in the early stages of planning and for effective project control, monitoring and execution. The purpose of this paper is to identify and better understand the cost drivers and factors that contribute to the accuracy of estimates in residential construction projects from the developers’ perspective. Design/methodology/approach – The paper uses a literature review to determine the drivers that affect the accuracy of developers’ early stage cost estimates and the factors influencing the construction costs of residential construction projects. It used cost variance data and other supporting documentation collected from two case study projects in South East Queensland, Australia, along with semi-structured interviews conducted with the practitioners involved. Findings – It is found that many cost drivers or factors of cost uncertainty identified in the literature for large-scale projects are not as apparent and relevant for developers’ small-scale residential construction projects. Specifically, the certainty and completeness of project-specific information, suitability of historical cost data, contingency allowances, methods of estimating and the estimator’s level of experience significantly affect the accuracy of cost estimates. Developers of small-scale residential projects use pre-established and suitably priced bills of quantities as the prime estimating method, which is considered to be the most efficient and accurate method for standard house designs. However, this method needs to be backed with the expertise and experience of the estimator. Originality/value – There is a lack of research on the accuracy of developers’ early stage cost estimates and the relevance and applicability of cost drivers and factors in the residential construction projects. This research has practical significance for improving the accuracy of such preliminary cost estimates.
Resumo:
The number of bidders, N, involved in a construction procurement auction is known to have an important effect on the value of the lowest bid and the mark up applied by bidders. In practice, for example, it is important for a bidder to have a good estimate of N when bidding for a current contract. One approach, instigated by Friedman in 1956, is to make such an estimate by statistical analysis and modelling. Since then, however, finding a suitable model for N has been an enduring problem for researchers and, despite intensive research activity in the subsequent thirty years little progress has been made - due principally to the absence of new ideas and perspectives. This paper resumes the debate by checking old assumptions, providing new evidence relating to concomitant variables and proposing a new model. In doing this and in order to assure universality, a novel approach is developed and tested by using a unique set of twelve construction tender databases from four continents. This shows the new model provides a significant advancement on previous versions. Several new research questions are also posed and other approaches identified for future study.
Resumo:
Real-time locating systems (RTLSs) are considered an effective way to identify and track the location of an object in both indoor and outdoor environments. Various RTLSs have been developed and made commercially available in recent years. Research into RTLSs in the construction sector is ubiquitous and results have been published in many construction-related academic journals over the past decade. A succinct and systematic review of current applications would help academics, researchers and industry practitioners in identifying existing research deficiencies and therefore future research directions. However, such a review is lacking to date. This paper provides a framework for understanding RTLS research and development in the construction literature over the last decade. The research opportunities and directions of construction RTLS are highlighted. Background information relating to construction RTLS trends, accuracy, deployment, cost, purposes, advantages and limitations is provided. Four major research gaps are identified and research opportunities and directions are highlighted.
Resumo:
Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.
Resumo:
The study of the organisational culture in the construction industry is still in the stage of debate (Oney-Yazıcı et al., 2007). Despite the complexities involved in measuring the culture of the construction industry (Tijhuis and Fellows, 2012), this culture is regarded as being worthy of research, especially in relation to the organisational culture needed to support quality management systems (Koh and Low, 2008; Watson and Howarth, 2011) and to improve organisational effectiveness, and therefore, organisational performance (Coffey, 2010; Cheung et al., 2011). A number of recent studies have examined the construction companies’ organisational culture within the context of the use of Cameron and Quinn’s Competing Value Framework (CVF), as well as the use of their Organizational Culture Assessment Instrument (OCAI) as the conceptual paradigm for the analyses (Thomas et al., 2002; Nummelin, 2006; Oney- Yazıcı et al., 2007; Koh and Low, 2008). However, there has been little research based on the use of Cameron and Quinn’s CVF-OCAI tool for identifying types of construction companies’ organisational culture and their influences on the implementation of QMS-ISO 9001. Research output and information is also very limited relating to the strength of the companies’ organisational culture driving an effective QMS-ISO 9001 implementation, affecting the companies’ effectiveness. To rectify these research gaps, the research has been aimed to study organisational culture types (based on CVF) and their influences on the implementation of QMS-ISO 9001:2008 principles and elements, which eventually lead to improved companies’ quality performance. In order to fully examine the status of the QMS being implemented, the research has studied the relationships of the barriers of QMS implementation with the implementation of QMS-ISO 9001:2008 principles and elements and with the business performance of the companies, as well as the examination of the relationships of the implementation of QMS-ISO 9001:2008 principles and elements with the companies’ business performance. The research output has been the development of fundamental and original studies on the study topics, to provide the knowledge for improvements in Indonesian construction companies’ quality performance and quality outcomes.
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.