882 resultados para Congo (Democratic Republic)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The single crystal Raman spectra of natural mineral schafarzikite FeSb2O4 from the Pernek locality of the Slovak Republic are presented for the first time. Raman spectra of natural mineral apuanite Fe2+Fe43+Sb4O12S, originating from the Apuan Alps in Italy, as well as spectra of synthetic ZnSb2O4 and arsenite mineral trippkeite CuAs2O4 are also presented for the first time. The spectra of the antimonite minerals are characterized by a strong band in the region 660 – 680 cm-1 with shoulders on either side, and a band of medium intensity near 300 cm-1. The spectrum of the arsenite mineral is characterized by a medium band near 780 cm-1 with a shoulder on the high wavenumber side and a strong band at 370 cm-1. Assignments are proposed based on the spectral comparison between the compounds, symmetry modes of the bands and prior literature. The single crystal spectra of schafarzikite showed good mode separation, allowing bands to be assigned a symmetry species of A1g, B1g, B2g or Eg.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This volume brings together a number of essays that seek to explore the nature of early modern scholarship, ostensibly with special regard to the themes of interdisciplinarity and collaboration. As one might expect, the essays thus cover a gamut of topics – political manoeuvring, philosophical debates, gift-giving and dramatic performance – and each study is important and useful in its own right. As a whole, however, this collection serves more as a starting point for an exploration of its themes, than as an authoritative overview of the subject at hand.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The adsorption of Congo Red (CR) by ball-milled sugarcane bagasse was evaluated in an aqueous batch system. CR adsorption capacity increased significantly with small changes in bagasse surface area. CR removal decreased with increasing solution pH from 5.0 to 10.0. Maximum adsorption capacity was 38.2 mg/g bagasse at a CR concentration of 500 mg/L. The equilibrium isotherm fitted the Freundlich model and the adsorption kinetics obeyed pseudo-second order equation. CR adsorption obeyed the intra-particle diffusion model very well with bagasse surface area in the range of 0.58–0.66 m2/g, whereas it was controlled by multi-adsorption stages with bagasse surface area in the range of 1.31–1.82 m2/g. Thermodynamic analysis indicated that the adsorption process is an exothermic and spontaneous process. Fourier transform infrared analysis of bagasse containing adsorbed CR indicated interactions between the carboxyl and hydroxyl groups of bagasse and CR function groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Software forms an important part of the interface between citizens and their government. An increasing amount of government functions are being performed, controlled, or delivered electronically. This software, like all language, is never value-neutral, but must, to some extent, reflect the values of the coder and proprietor. The move that many governments are making towards e-governance, and the increasing reliance that is being placed upon software in government, necessitates a rethinking of the relationships of power and control that are embodied in software.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) system has been demonstrated as an effective delivery method and been widely used overseas. However it does not receive the same popularity in the People’s Republic of China (PRC). This paper first conducts a literature review on advantages and disadvantages of DB in general; then it gives an overview of the PRC construction industry. There are ample evidences that the DB system will theoretically bring benefits to the PRC construction industry. After a thorough investigation of the current DB market, it can be concluded that the development of the DB system is still at its infancy stage. The barriers to entry have been finally identified, which relate to the legal restraints, negative owner attitude, and high requirement of DB projects. These barriers constitute obstacles to the development of DB system in the PRC. However, with rapid growth of construction industry, new requirements in modern construction projects, and strong promotion from governments, it is believed that the domestic DB market will have great potential in the near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On 20 September 2001, the former US President, George W. Bush, declared what is now widely, and arguably infamously, known as a ‘war on terror’. In response to the fatal 9/11 attacks in New York and Washington, DC, President Bush identified the US military response as having far-reaching and long-lasting consequences. It was, he argued, ‘our war on terror’ that began ‘with al Qaeda, but … it will not end until every terrorist group of global reach has been found, stopped and defeated’ (CNN 2001). This was to be a war that would, in the words of former British Prime Minister, Tony Blair, seek to eliminate a threat that was ‘aimed at the whole democratic world’ (Blair 2001). Blair claimed that this threat is of such magnitude that unprecedented measures would need to be taken to uphold freedom and security. Blair would later admit that it was a war that ‘divided the country’ and was based on evidence ‘about Saddam having actual biological and chemical weapons, as opposed to the capability to develop them, has turned out to be wrong’ (Blair 2004). The failures of intelligence ushered in new political rhetoric in the form of ‘trust me’ because ‘instinct is no science’ (Blair 2004). The war on terror has been one of the most significant international events in the past three decades, alongside the collapse of the former Soviet Union, the end of apartheid in South Africa, the unification of Europe and the marketization of the People's Republic of China. Yet, unlike the other events, it will not be remembered for advancing democracy or sovereignty, but for the conviction politics of particular politicians who chose to dispense with international law and custom in pursuit of personal instincts that proved fatal. Since the invasions of Afghanistan in October 2001 and …

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.