957 resultados para Collective Construction
Resumo:
Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
Productivity is basic statistical information for many international comparisons and country performance assessments. This study estimates the construction labour productivity of 79 selected economies. The real (purchasing power parities converted) and nominal construction expenditure from the Report of 2005 International Comparison Programme published by the World Bank and construction employment from the database of labour statistics (LABORSTA) operated by the Bureau of Statistics of International Labour Organization were used in the estimation. The inference statistics indicate that the descending order of nominal construction labour productivity from high income economies to low income economies is not established. The average construction labour productivity of low income economies is higher than middle income economies when the productivity calculation uses purchasing power parities converted data. Malaysia ranked 50th and 63rd position among the 79 selected economies on real and nominal measurement respectively.
Resumo:
The critical problem of student disengagement and underachievement in the middle years of schooling (Years 4 . 9) has focussed attention on the quality of educational programs in schools, in Australia and elsewhere. The loss of enthusiasm for science in the middle years is particularly problematic given the growing demand for science professionals. Reshaping middle years programs has included an emphasis on integrating Information and Communication Technologies (ICTs) and improving assessment practices to engage students in higher cognitive processes and enhance academic rigour. Understanding the nature of academic rigour and how to embed it in students. science assessment tasks that incorporate the use of ICTs could enable teachers to optimise the quality of the learning environment. However, academic rigour is not clearly described or defined in the literature and there is little empirical evidence upon which researchers and teachers could draw to enhance understandings. This study used a collective case study design to explore teachers' understandings of academic rigour within science assessment tasks. The research design is based on a conceptual framework that is underpinned by socio-cultural theory. Three methods were used to collect data from six middle years teachers and their students. These methods were a survey, focus group discussion with teachers and a group of students and individual semi-structured interviews with teachers. Findings of the case study revealed six criteria of academic rigour, namely, higher order thinking, alignment, building on prior knowledge, scaffolding, knowledge construction and creativity. Results showed that the middle years teachers held rich understandings of academic rigour that led to effective utilisation of ICTs in science assessment tasks. Findings also indicated that teachers could further enhance their understandings of academic rigour in some aspects of each of the criteria. In particular, this study found that academic rigour could have been further optimised by: promoting more thoughtful discourse and interaction to foster higher order thinking; increasing alignment between curriculum, pedagogy, and assessment, and students. prior knowledge; placing greater emphasis on identifying, activating and building on prior knowledge; better differentiating the level of scaffolding provided and applying it more judiciously; fostering creativity throughout tasks; enhancing teachers‟ content knowledge and pedagogical content knowledge, and providing more in-depth coverage of fewer topics to support knowledge construction. Key contributions of this study are a definition and a model which clarify the nature of academic rigour.
Resumo:
Shared leadership has been identified as a key governance base for the future of government and Catholic schools in Queensland, the state’s two largest providers of school education. Shared leadership values the contributions that many individuals can make through collaboration and teamwork. It claims to improve organisational performance and reduce the increasing pressures faced by principals. However despite these positive features, shared leadership is generally not well understood, not well accepted and not valued by those who practice or study leadership. A collective case study method was chosen, incorporating a series of semi-structured interviews with principals and the use of official school documents. The study has explored the current understanding and practice of shared leadership in four Queensland schools and investigated its potential for use.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
The idea of collective unintelligence is examined in this paper to highlight some of the conceptual and practical problems faced in modeling groups. Examples drawn from international crises and economics provide illustrative problems of collective failures to act in intelligent ways, despite the inputs and efforts of many skilled and intelligent parties. Choices made of “appropriate” perceptions, analysis and evaluations are examined along with how these might be combined. A simple vector representation illustrates some of the issues and creative possibilities in multi-party actions. Revealed as manifest (un-)intelligence are the resolutions of various problems and potentials that arise in dealing with the “each and all” of a group (wherein items are necessarily non-parallel and of unequal valency). Such issues challenge those seeking to model collective intelligence, but much may be learned.
Resumo:
This paper describes technologies we have developed to perform autonomous large-scale off-world excavation. A scale dragline excavator of size similar to that required for lunar excavation was made capable of autonomous control. Systems have been put in place to allow remote operation of the machine from anywhere in the world. Algorithms have been developed for complete autonomous digging and dumping of material taking into account machine and terrain constraints and regolith variability. Experimental results are presented showing the ability to autonomously excavate and move large amounts of regolith and accurately place it at a specified location.
Resumo:
The mechanisms of helicopter flight create a unique, high-vibration environment which can play havoc with the accurate operation of on-board sensors. Vibration isolation of electronic sensors from structural borne oscillations is paramount to their reliable and accurate use. Effective isolation is achieved by realising a trade-off between the properties of the suspended instrument package, and the isolation mechanism. This is made more difficult as the weight and size of the sensors and computing hardware decreases with advances in technology. This paper presents a history of the design, challenges, constraints and construction of an integrated isolated vision and sensor platform and landing gear for the CSIRO autonomous X-Cell helicopter. The results of isolation performance and in-flight tests of the platform in autonomous flight are presented.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
Anecdotal evidence from the infrastructure and building sectors highlights issues of drugs and alcohol and its association with safety risk on construction sites. Operating machinery and mobile equipment, proximity to live traffic together with congested sites, electrical equipment and operating at heights conspire to accentuate the potential adverse impact of drugs and alcohol in the workplace. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgement from drugs and alcohol. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients; unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. This study has four key objectives. Firstly, using the standard World Health Organisation AUDIT, a national qualitative and quantitative assessment of the use of drugs and alcohol will be carried out. This will build upon similar studies carried out in the Australian energy and mining sectors. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Thirdly, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. Finally, an implementation plan will be developed from data gathered from both managers and construction employees. Such an approach stands to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This paper will provide an overview of the background and significance of the study as well as outlining the proposed methodology that will be used to evaluate the safety impacts of alcohol and other drugs in the construction industry.
Resumo:
-