825 resultados para workflow management systems
Resumo:
A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
Resumo:
Convergence of pervasive technologies, techno-centric customers and the emergence of digitized channels, overabundance of user friendly retail applications are having a profound impact on retail experience, leading to the advent of ‘everywhere retailing’. With the rapid uptake of digital complimentary assets and smart mobile applications are revolutionizing the relationship of retailers with their customers and suppliers. Retail firms are increasingly investing substantial resources on dynamic Customer Relationship Management systems (D-CRM / U-CRM) to better engage with customers to sense and respond quickly (Agility of the firm) to their demands. However, unlike traditional CRM systems, engagement with U-CRM systems requires that firms be hyper sensitive to volatile customer needs and wants. Following the notions of firm agility, this study attempts to develop a framework to understand such unforeseen benefits and issues of U-CRM. This research-in-progress paper reports an a-priory framework including 62 U-CRM benefits derived through an archival analysis of literature.
Resumo:
As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.
Resumo:
Product Lifecycle Management (PLM) systems are widely used in the manufacturing industry. A core feature of such systems is to provide support for versioning of product data. As workflow functionality is increasingly used in PLM systems, the possibility emerges that the versioning transitions for product objects as encapsulated in process models do not comply with the valid version control policies mandated in the objects’ actual lifecycles. In this paper we propose a solution to tackle the (non-)compliance issues between processes and object version control policies. We formally define the notion of compliance between these two artifacts in product lifecycle management and then develop a compliance checking method which employs a well-established workflow analysis technique. This forms the basis of a tool which offers automated support to the proposed approach. By applying the approach to a collection of real-life specifications in a main PLM system, we demonstrate the practical applicability of our solution to the field.
Resumo:
Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.
Resumo:
The Business Process Management domain has evolved at a dramatic pace over the past two decades and the notion of the business process has become a ubiquitous part of the modern business enterprise. Most organizations now view their operations in terms of business processes and manage these business processes in the same way as other corporate assets. In recent years, an increasingly broad range of generic technology has become available for automating business processes. This is part of a growing trend in the software engineering field throughout the past 40 years, where aspects of functionality that are potentially reusable on a widespread basis have coalesced into generic software components. Figure 2.1 illustrates this trend and shows how software systems have evolved from the monolithic applications of the 1960s developed in their entirety often by a single development team to today’s offerings that are based on the integration of a range of generic technologies with only a small component of the application actually being developed from scratch. In the 1990s, generic functionality for the automation of business processes first became commercially available in the form of workflow technology and subsequently evolved in the broader field of business process management systems (BPMS). This technology alleviated the necessity to develop process support within applications from scratch and provided a variety of off-the-shelf options on which these requirements could be based. The demand for this technology was significant and it is estimated that by 2000 there were well over 200 distinct workflow offerings in the market, each with a distinct conceptual foundation. Anticipating the difficulties that would be experienced by organizations seeking to utilize and integrate distinct workflow offerings, the Workflow Management Coalition (WfMC), an industry group formed to advance technology in this area, proposed a standard reference model for workflow technology with an express desire to seek a common platform for achieving workflow interoperation.
Resumo:
Nowadays, process management systems (PMSs) are widely used in many business scenarios, e.g. by government agencies, by insurance companies, and by banks. Despite this widespread usage, the typical application of such systems is predominantly in the context of static scenarios, instead of pervasive and highly dynamic scenarios. Nevertheless, pervasive and highly dynamic scenarios could also benefit from the use of PMSs.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
The Central Queensland Mine Rehabilitation Group (CQMRG) has hosted mine site rehabilitation inspections combined with technical workshops for more than 20 years. It was recognised at CQMRG's anniversary meeting in April 2013 that the vast body of knowledge held by rehabilitation and closure planning practitioners was being lost as senior rehabilitation experts retire from the industry. It was noted that even more knowledge could be readily lost unless a knowledge management platform was developed to capture, store and enable retrieval of this information. This loss of knowledge results in a significant cost to industry. This project was therefore undertaken to review tools which have the capability to gather the less formal knowledge as well as to make links to existing resources and bibliographic material. This scoping study evaluated eight alternative knowledge management systems to provide guidance on the best method of providing the industry with an up-to-date, good practice, knowledge management system for rehabilitation and closure practices, with capability for information sharing via a portal and discussion forum. This project provides guidance for a larger project which will implement the knowledge management system to meet the requirements of the CQMRG and be transferrable to other regions if applicable. It will also provide the opportunity to identify missing links between existing tools and their application. That is, users may not be aware of how these existing tools can be used to assist with mine rehabilitation planning and implementation and the development of a new platform will help to create those linkages. The outcomes of this project are directed toward providing access to a live repository of rehabilitation practice information which is Central Queensland coal mine-specific, namely: highlighting best practice activities, results of trials and innovative practices; updated legislative requirements; links to practices elsewhere; and informal anecdotal information relevant to particular sites which may be of assistance in the development of rehabilitation of new areas. Solutions to the rehabilitation of challenging spoils/soils will also be provided. The project will also develop a process which can be applied more broadly within the mining sector to other regions and other commodities. Providing a platform for uploading information and holding discussion forums which can be managed by a regional practitioner network enables the new system to be kept alive, driven by users and information needs as they evolve over time. Similar internet-based platforms exist and are managed successfully. The preferred knowledge management system will capture the less formal and more difficult to access knowledge from rehabilitation and mine closure practitioners and stakeholders through the CQMRG and other contributors. It will also provide direct links, and greater accessibility, to more formal sources of knowledge with anticipated cost savings to the industry and improved rehabilitation practices with successful transitioning to closure and post-mining land use.
Resumo:
Drawing from experience internationally, on recent and important developments in regulatory theory, and upon models and approaches constructed during the author's empirical research, this book addresses the question: how can law influence the internal self-regulation of organisations in order to make them more responsive to occupational health and safety concerns? In this context, it is argued that Occupational Health and Safety management systems have the potential to stimulate models of self-organisation within firms in such a way as to make them self-reflective and to encourage informal self-critical reflection about their occupational health and safety performance.
Resumo:
In current bridge management systems (BMSs), load and speed restrictions are applied on unhealthy bridges to keep the structure safe and serviceable for as long as possible. But the question is, whether applying these restrictions will always decrease the internal forces in critical components of the bridge and enhance the safety of the unhealthy bridges. To find the answer, this paper for the first time in literature, looks into the design aspects through studying the changes in demand by capacity ratios of the critical components of a bridge under the train loads. For this purpose, a structural model of a simply supported bridge, whose dynamic behaviour is similar to a group of real railway bridges, is developed. Demand by capacity ratios of the critical components of the bridge are calculated, to identify their sensitivity to increase of speed and magnitude of live load. The outcomes of this study are very significant as they show that, on the contrary to what is expected, by applying restriction on speed, the demand by capacity ratio of components may increase and make the bridge unsafe for carrying live load. Suggestions are made to solve the problem.
Resumo:
The implementation of pavement management seems to ignore road safety, with its focus being mainly on infrastructure condition. Safety management as part of pavement management should consider various means of reducing the frequency of vehicle crashes by allocating corrective measures to mitigate accident exposure, as well as reduce accident severity and likelihood. However, it is common that lack of accident records and crash contributing factors impedes incorporating safety into pavement management. This paper presents a case study for the initial development of pavement management systems considering data limitations for 3000 km of Tanzania’s national roads. A performance based optimization utilizes indices for safety and surface condition to allocate corrective measures. A modified Pareto analysis capable of accounting for annual performance and of balancing resources to achieve good surface condition and low levels of safety was applied. Tradeoff analysis for the case study found the need to assign 30% relevance to condition and 70% to road safety. Safety and condition deficiencies were corrected within 5 years with the majority of improvements dedicated to surface treatments and some geometric corrections. Large investments for correcting geometric issues were observed in years two and three if more money was made available.
Resumo:
We propose an architecture for a rule-based online management systems (RuleOMS). Typically, many domain areas face the problem that stakeholders maintain databases of their business core information and they have to take decisions or create reports according to guidelines, policies or regulations. To address this issue we propose the integration of databases, in particular relational databases, with a logic reasoner and rule engine. We argue that defeasible logic is an appropriate formalism to model rules, in particular when the rules are meant to model regulations. The resulting RuleOMS provides an efficient and flexible solution to the problem at hand using defeasible inference. A case study of an online child care management system is used to illustrate the proposed architecture.
Resumo:
Web service and business process technologies are widely adopted to facilitate business automation and collaboration. Given the complexity of business processes, it is a sought-after feature to show a business process with different views to cater for the diverse interests, authority levels, etc., of different users. Aiming to implement such flexible process views in the Web service environment, this paper presents a novel framework named FlexView to support view abstraction and concretisation of WS-BPEL processes. In the FlexView framework, a rigorous view model is proposed to specify the dependency and correlation between structural components of process views with emphasis on the characteristics of WS-BPEL, and a set of rules are defined to guarantee the structural consistency between process views during transformations. A set of algorithms are developed to shift the abstraction and concretisation operations to the operational level. A prototype is also implemented for the proof-of-concept purpose. © 2010 Springer Science+Business Media, LLC.