930 resultados para level scheme of I-127
Resumo:
In this paper, the yield increases resulting from the cultivation of Bt cotton in Maharashtra, India, are analysed. The study relies on commercial farm, rather than trial, data and is among the first of its kind to be based on real farm and market conditions. Findings show that since its commercial release in 2002, Bt cotton has had a significant positive impact on yields and on the economic performance of cotton growers in Maharashtra. This difference remains even after controlling for different soil and insecticide inputs in the production of Bt cotton. There is also significant spatial and temporal variation in this 'benefit', and much depends upon where production is taking place and on the season.
Resumo:
This paper describes the method and findings of the first independent survey of smallholder farmers in the Republic of South Africa designed to explore the economic benefits of their adoption of Bt cotton. The study found that the Bt variety generally resulted in a per hectare increase in yields, value of output and reduction of pesticide costs which outweighed the increase in seed costs to give a substantial increase in gross margins. There are several surveys being carried out at the moment on different aspects of the Makhathini experience. The Monitor will be reporting on their results as these become available.
Resumo:
In this paper, we investigate half-duplex two-way dual-hop channel state information (CSI)-assisted amplify-and-forward (AF) relaying in the presence of in-phase and quadrature-phase (I/Q) imbalance. A compensation approach for the I/Q imbalance is proposed, which employs the received signals together with their conjugations to detect the desired signal. We also derive the average symbol error probability of the considered half-duplex two-way dual-hop CSI-assisted AF relaying networks with and without compensation for I/Q imbalance in Rayleigh fading channels. Numerical results are provided and show that the proposed compensation method mitigates the impact of I/Q imbalance to a certain extent.
Resumo:
In this paper, dual-hop amplify-and-forward (AF) cooperative systems in the presence of in-phase and quadrature-phase (I/Q) imbalance, which refers to the mismatch between components in I and Q branches, are investigated. First, we analyze the performance of the considered AF cooperative protocol without compensation for I/Q imbalance as the benchmark. Furthermore, a compensation algorithm for I/Q imbalance is proposed, which makes use of the received signals at the destination, from the source and relay nodes, together with their conjugations to detect the transmitted signal. The performance of the AF cooperative system under study is evaluated in terms of average symbol error probability (SEP), which is derived considering transmission over Rayleigh fading channels. Numerical results are provided and show that the proposed compensation algorithm can efficiently mitigate the effect of I/Q imbalance.
Resumo:
In this paper, multi-hop cooperative networks implementing channel state information (CSI)-assisted amplify-and-forward (AF) relaying in the presence of in-phase and quadrature-phase (I/Q) imbalance are investigated. We propose a compensation algorithm for the I/Q imbalance. The performance of the multi-hop CSI-assisted AF cooperative networks with and without compensation for I/Q imbalance in Nakagami-m fading environment is evaluated in terms of average symbol error probability. Numerical results are provided and show that the proposed compensation method can effectively mitigate the impact of I/Q imbalance.
Resumo:
Lake Bysjön, southern Sweden, has experienced major lake-level lowerings during the Holocene, with one interval about 900014C yr B.P. when water level dropped ca. 7 m and the lake became closed. These changes were not solely due to known changes in radiation budgets or seasonal temperatures. Simulations with a lake-catchment model indicate that, given the actual changes in radiation and temperatures, all the observed lake-level lowerings (including the major lowering at 900014C yr B.P.) could have occurred in response to precipitation changes of <75 mm/yr when winter temperatures were warmer than today. In these circumstances, the reduction of runoff into the lake caused by increased evapotranspiration during the late winter and spring, combined with relatively small changes in precipitation, was sufficient for the lake to become closed. When winter temperatures were colder than today, the reduction in winter runoff related to reduced precipitation was only very slight and insufficient to lower the lake below threshold. In such circumstances, changes in outflow were sufficient to compensate for the combined changes in precipitation and runoff, and lake level therefore remained unchanged.
Resumo:
We apply a new parameterisation of the Greenland ice sheet (GrIS) feedback between surface mass balance (SMB: the sum of surface accumulation and surface ablation) and surface elevation in the MAR regional climate model (Edwards et al., 2014) to projections of future climate change using five ice sheet models (ISMs). The MAR (Modèle Atmosphérique Régional: Fettweis, 2007) climate projections are for 2000–2199, forced by the ECHAM5 and HadCM3 global climate models (GCMs) under the SRES A1B emissions scenario. The additional sea level contribution due to the SMB– elevation feedback averaged over five ISM projections for ECHAM5 and three for HadCM3 is 4.3% (best estimate; 95% credibility interval 1.8–6.9 %) at 2100, and 9.6% (best estimate; 95% credibility interval 3.6–16.0 %) at 2200. In all results the elevation feedback is significantly positive, amplifying the GrIS sea level contribution relative to the MAR projections in which the ice sheet topography is fixed: the lower bounds of our 95% credibility intervals (CIs) for sea level contributions are larger than the “no feedback” case for all ISMs and GCMs. Our method is novel in sea level projections because we propagate three types of modelling uncertainty – GCM and ISM structural uncertainties, and elevation feedback parameterisation uncertainty – along the causal chain, from SRES scenario to sea level, within a coherent experimental design and statistical framework. The relative contributions to uncertainty depend on the timescale of interest. At 2100, the GCM uncertainty is largest, but by 2200 both the ISM and parameterisation uncertainties are larger. We also perform a perturbed parameter ensemble with one ISM to estimate the shape of the projected sea level probability distribution; our results indicate that the probability density is slightly skewed towards higher sea level contributions.
Resumo:
Using UV and srCD spectroscopy it is found that loop length within the i-motif structure is important for both thermal and pH stability, but in contrast to previous statements, it is the shorter loops that exhibit the highest stability.
Resumo:
UV-generated excited states of cytosine (C) nucleobases are precursors to mutagenic photoproduct formation. The i-motif formed from C-rich sequences is known to exhibit high yields of long-lived excited states following UV absorption. Here the excited states of several i-motif structures have been characterized following 267 nm laser excitation using time-resolved infrared spectroscopy (TRIR). All structures possess a long-lived excited state of ~300 ps and notably in some cases decays greater than 1 ns are observed. These unusually long-lived lifetimes are attributed to the interdigitated DNA structure which prevents direct base stacking overlap.