974 resultados para Unit value
Resumo:
Technologies such as smart meters and electricity feedback are becoming an increasingly compelling focus for HCI researchers in light of rising power prices and peak demand. We argue, however, that a pre-occupation with the goal of demand management has limited the scope of design for these technologies. In this paper we present our work-in-progress investigating the potential value of socially sharing electricity information as a means of broadening the scope of design for these devices. This paper outlines some preliminary findings gathered from a design workshop and a series of qualitative interviews with householders in Brisbane, Australia, regarding their attitudes towards electricity feedback and sharing consumption information. Preliminary findings suggest that; (1) the social sharing of electricity feedback information has the potential to be of value in better informing consumption decisions, however; (2) the potential for sharing may be constrained by attitudes towards privacy, trust and the possibility of misinformation being shared. We conclude by outlining ideas for our future research on this topic and invite comments on these ideas.
Resumo:
The construction industry is an industry of major strategic importance. Its level of productivity has a significant effect on national economic growth. Productivity indicators are examined. The indicators consist of labour productivity, capital productivity, labour competitiveness, capital intensity and added value content of data, which are obtained from the published census/biannual surveys of the construction industry between the years 1999 and 2011 from the Department of Statistics of Malaysia. The results indicated that there is an improvement in the labour productivity, but the value-added content is declining. The civil engineering and special trades subsectors are more productive than the residential and non-residential subsectors in terms of labour productivity because machine-for-labour substitution is a more important process in those subsectors. The capital-intensive characteristics of civil engineering and special trade works enable these subsectors to achieve higher added value per labour cost but not the capital productivity. The added value per labour cost is lower in larger organizations despite higher capital productivity. However, the capital intensity is lower and unit labour cost is higher in the larger organizations.
Resumo:
Cotton is one of the most important irrigated crops in subtropical Australia. In recent years, cotton production has been severely affected by the worst drought in recorded history, with the 2007–08 growing season recording the lowest average cotton yield in 30 years. The use of a crop simulation model to simulate the long-term temporal distribution of cotton yields under different levels of irrigation and the marginal value for each unit of water applied is important in determining the economic feasibility of current irrigation practices. The objectives of this study were to: (i) evaluate the CROPGRO-Cotton simulation model for studying crop growth under deficit irrigation scenarios across ten locations in New South Wales (NSW) and Queensland (Qld); (ii) evaluate agronomic and economic responses to water inputs across the ten locations; and (iii) determine the economically optimal irrigation level. The CROPGRO-Cotton simulation model was evaluated using 2 years of experimental data collected at Kingsthorpe, Qld. The model was further evaluated using data from nine locations between northern NSW and southern Qld. Long-term simulations were based on the prevalent furrowirrigation practice of refilling the soil profile when the plant -available soil water content is<50%. The model closely estimated lint yield for all locations evaluated. Our results showed that the amounts of water needed to maximise profit and maximise yield are different, which has economic and environmental implications. Irrigation needed to maximise profits varied with both agronomic and economic factors, which can be quite variable with season and location. Therefore, better tools and information that consider the agronomic and economic implications of irrigation decisions need to be developed and made available to growers.
Resumo:
Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.
Resumo:
Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.
Resumo:
Process bus networks are the next stage in the evolution of substation design, bringing digital technology to the high voltage switchyard. Benefits of process buses include facilitating the use of Non-Conventional Instrument Transformers, improved disturbance recording and phasor measurement and the removal of costly, and potentially hazardous, copper cabling from substation switchyards and control rooms. This paper examines the role a process bus plays in an IEC 61850 based Substation Automation System. Measurements taken from a process bus substation are used to develop an understanding of the network characteristics of "whole of substation" process buses. The concept of "coherent transmission" is presented and the impact of this on Ethernet switches is examined. Experiments based on substation observations are used to investigate in detail the behavior of Ethernet switches with sampled value traffic. Test methods that can be used to assess the adequacy of a network are proposed, and examples of the application and interpretation of these tests are provided. Once sampled value frames are queued by an Ethernet switch the additional delay incurred by subsequent switches is minimal, and this allows their use in switchyards to further reduce communications cabling, without significantly impacting operation. The performance and reliability of a process bus network operating with close to the theoretical maximum number of digital sampling units (merging units or electronic instrument transformers) was investigated with networking equipment from several vendors, and has been demonstrated to be acceptable.
Resumo:
Motor unit number estimation (MUNE) is a method which aims to provide a quantitative indicator of progression of diseases that lead to loss of motor units, such as motor neurone disease. However the development of a reliable, repeatable and fast real-time MUNE method has proved elusive hitherto. Ridall et al. (2007) implement a reversible jump Markov chain Monte Carlo (RJMCMC) algorithm to produce a posterior distribution for the number of motor units using a Bayesian hierarchical model that takes into account biological information about motor unit activation. However we find that the approach can be unreliable for some datasets since it can suffer from poor cross-dimensional mixing. Here we focus on improved inference by marginalising over latent variables to create the likelihood. In particular we explore how this can improve the RJMCMC mixing and investigate alternative approaches that utilise the likelihood (e.g. DIC (Spiegelhalter et al., 2002)). For this model the marginalisation is over latent variables which, for a larger number of motor units, is an intractable summation over all combinations of a set of latent binary variables whose joint sample space increases exponentially with the number of motor units. We provide a tractable and accurate approximation for this quantity and also investigate simulation approaches incorporated into RJMCMC using results of Andrieu and Roberts (2009).
Resumo:
Genetic recombination is a fundamental evolutionary mechanism promoting biological adaptation. Using engineered recombinants of the small single-stranded DNA plant virus, Maize streak virus (MSV), we experimentally demonstrate that fragments of genetic material only function optimally if they reside within genomes similar to those in which they evolved. The degree of similarity necessary for optimal functionality is correlated with the complexity of intragenomic interaction networks within which genome fragments must function. There is a striking correlation between our experimental results and the types of MSV recombinants that are detectable in nature, indicating that obligatory maintenance of intragenome interaction networks strongly constrains the evolutionary value of recombination for this virus and probably for genomes in general.
Resumo:
Background Maize streak virus -strain A (MSV-A; Genus Mastrevirus, Family Geminiviridae), the maize-adapted strain of MSV that causes maize streak disease throughout sub-Saharan Africa, probably arose between 100 and 200 years ago via homologous recombination between two MSV strains adapted to wild grasses. MSV recombination experiments and analyses of natural MSV recombination patterns have revealed that this recombination event entailed the exchange of the movement protein - coat protein gene cassette, bounded by the two genomic regions most prone to recombination in mastrevirus genomes; the first surrounding the virion-strand origin of replication, and the second around the interface between the coat protein gene and the short intergenic region. Therefore, aside from the likely adaptive advantages presented by a modular exchange of this cassette, these specific breakpoints may have been largely predetermined by the underlying mechanisms of mastrevirus recombination. To investigate this hypothesis, we constructed artificial, low-fitness, reciprocal chimaeric MSV genomes using alternating genomic segments from two MSV strains; a grass-adapted MSV-B, and a maize-adapted MSV-A. Between them, each pair of reciprocal chimaeric genomes represented all of the genetic material required to reconstruct - via recombination - the highly maize-adapted MSV-A genotype, MSV-MatA. We then co-infected a selection of differentially MSV-resistant maize genotypes with pairs of reciprocal chimaeras to determine the efficiency with which recombination would give rise to high-fitness progeny genomes resembling MSV-MatA. Results Recombinants resembling MSV-MatA invariably arose in all of our experiments. However, the accuracy and efficiency with which the MSV-MatA genotype was recovered across all replicates of each experiment depended on the MSV susceptibility of the maize genotypes used and the precise positions - in relation to known recombination hotspots - of the breakpoints required to re-create MSV-MatA. Although the MSV-sensitive maize genotype gave rise to the greatest variety of recombinants, the measured fitness of each of these recombinants correlated with their similarity to MSV-MatA. Conclusions The mechanistic predispositions of different MSV genomic regions to recombination can strongly influence the accessibility of high-fitness MSV recombinants. The frequency with which the fittest recombinant MSV genomes arise also correlates directly with the escalating selection pressures imposed by increasingly MSV-resistant maize hosts.
Resumo:
This presentation put forward six propositions regarding the value and character of community wellbeing, in particular the economic contribution of social and community programs and initiatives. The six propositions are: 1. Community wellbeing is a useful umbrella concept 2. Everyone benefits from public programs 3. There is an economic as well as social cost of not responding well 4. Local government is key in fostering community wellbeing 5. Good practice involves bringing together a number of perspectives and levers, including social and cultural initiatives 6. Engaging with the community around wellbeing offers an opportunity to enhance the political process
Resumo:
This case study incorporated an analysis of a group of young people as media producers and placed young people’s perspectives of their media education learning at the core of the analysis. Communities of practice social learning theory provided an effective conceptual framework for investigating the nature of the participants’ involvement in a secondary school and creative industry partnership. The analysis of the data in this study indicated that the participants valued their learning by imagining, actively participating and belonging to a media education community of practice. By enabling young people to work directly with creative industries this school and industry partnership provided students with what they saw as valuable first-hand experience of professional expertise, that contributed to students’ understanding of their own and others’ identities.
Resumo:
By the end of the 20th century the shift from professional recording studio to personal computer based recording systems was well established (Chadabe 1997) and musicians could increasingly see the benefits of value adding to the musical process by producing their own musical endeavours. At the Queensland University of Technology (QUT) where we were teaching, the need for a musicianship program that took account of these trends was becoming clear. The Sound Media Musicianship unit described in this chapter was developed to fill this need and ran from 1999 through 2010.
Resumo:
Objective(s): A new model of care for the management of patients with delirium was developed and evaluated. Method: A 4-bedded Close Observation Unit (COU) was introduced. The model comprised an education strategy for assistants in nursing (AIN), environmental adaptations and AIN to patient ratio of 1:4. Outcomes in all patients with delirium before and after introduction of the new model of care were compared. Results: 105 patients were admitted to COU, of whom 100 (95%) were diagnosed with delirium. In-hospital mortality improved after introduction of the unit (15% versus 5%; p=0.002) without significant change in length of stay, discharge destination or falls frequency. Conclusion: A dedicated unit for delirium management within medicine achieved a reduction in mortality.
The creative citizen : understanding the value of design education programs in the knowledge economy
Resumo:
The knowledge economy relies on the diffusion and use of knowledge as well as its creation (Houghton and Sheenan, 2000). The future success of economic activity will depend on the capacity of organisations to transform by increasing their flexibility. In particular, this transformation is dependant on a decentralised, networked and multi-skilled workforce. To help organisations transition, new strategies and structures for education are required. Education systems need to concentrate less on specialist skills and more on the development of people with broad-based problem solving skills that are adaptable, with social and inter-personal communication skills necessary for networking and communication. This paper presents the findings of a ‘Knowledge Economy Market Development Mapping Study’ conducted to identify the value of design education programs from primary through to tertiary level in Queensland, Australia. The relationship of these programs to the development of the capacities mentioned above is explored. The study includes the collection of qualitative and quantitative data consisting of a literature review, focus groups and survey. Recommendations for the future development of design education programs in Queensland, Australia are proposed, and future research opportunities are presented and discussed.
Resumo:
The election of a national Labor Government in 2007 saw ‘social inclusion’ emerge as Australia’s overarching social policy agenda. Being ‘included’ has since been defined as being able to ‘have the resources, opportunities and capabilities needed to learn, work, engage and have a voice’. Various researchers have adopted the social inclusion concept to construct a multi-dimensional framework for measuring disadvantage, beyond poverty alleviation. This research program has enabled various forms of statistical modelling based on some agreement about what it means to be ‘included’ in society. At the same time it is acknowledged that social inclusion remains open and contestable and can be used in the name of both progressive and more punitive programs and policies. This ambiguity raises questions about whether the social inclusion framework, as it is presently defined, has the potential to be a progressive and transformative discourse. In this paper we examine whether the Australian social inclusion agenda has the capacity to address social inequality in a meaningful way, concluding with a discussion about the need to understand social inequality and social disadvantage in relational terms.