999 resultados para Technical reserves


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ministry of Science and Technology of China [2008BAK47B02, 2008BAC44B04, 2008BAK50B06, 2008BAC43B01, 2006BAC08B06]

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Junggar Basin has a large amount of recoverable reserves, However, due to the unfavorable factors, such as bad seismic data quality, complex structure with many faults and less wells, the exploration of oil and gas is still relatively limited, so advanced theoretical guidance and effective technical supports are desirable. Based on the theories of sedimentology, as well as comprehensive studies of outcrops, seismic data, drilling data and setting of this area, the paper establishes the isochronous correlation framework, and analyzes the sedimentary facies types and provenance direction, and obtains the profile and plain maps of the sedimentary facies combined with the logging constrained inversion. Then the paper analyzes the reservoir controlling factors, reservoir lithology attribute, 4-property relationship and sensibility based on the sedimentary facies research, and sets up a 3D geological model using facies controlled modeling. Finally, the paper optimizes some target areas with the conclusions of reservoir, structure and reservoir formation.Firstly, the paper establishs the isochronous correlation framework by the seismic data, drilling data and setting of this area. The sedimentary facies in Tai13 well block are braided river and meandering river according to the analysis of the lithology attribute, logging facies and sedimentary structure attribute of outcrop. The concept of “wetland” is put forward for the first time. The provenance direction of Badaowan and Qigu formation is obtained by the geology setting, sedimentary setting and paleocurrent direction. The paper obtains the profile and plain maps of the sedimentary facies from the sand value of the wells and the sand thickness maps from the logging constrained inversion. Then, this paper takes characteristics and control factors of the Jurassic reservoirs analysis on thin section observation, scanning transmission electron microscope observation and find out the petrology characteristics of reservoir, space types of reservoir and lithofacies division. In this area, primary pores dominate in the reservoir pores, which believed that sedimentation played the most important roles of the reservoir quality and diagenesis is the minor factor influencing secondary porosity. Using stochastic modeling technique,the paper builds quantitative 3-D reservoir Parameter. Finally, combined the study of structure and reservoir formation, the reservoir distribution regularity is concluded: (a) structures control the reservoir formation and accumulation. (b) Locating in the favorable sedimentary facies belt. And the area which meets these conditions mentioned above is a good destination for exploration.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The discovery of the highly productive Renqiu buried hill reservoir in Bohai Bay Basin in 1975 started the high tide of finding buried hill reservoirs in China and their research. As the advance of E&P technologies, the study of buried hill reservoir in China had a qualitative leap. The reservoir description and some other aspects of development have reached or approached to the international leading level. However, some core techniques for reservoir study such as structure & faulting system study, formation prediction and connection study and heterogeneous model's construction could not completely carry out the quantitative or accurate reservoir description, e. g. the areal distribution of porosity, permeability and oil saturation. Especially, the modeling for reservoir simulation is still wandering in the stage of simplicity. The inaccurate understanding of geology could not derive 3D heterogeneous geological model that can reveal the actual underground situation thus could not design practical and feasible oilfield development plan. Therefore, the problems of low oil recovery rate, low recovery factor and poor development effectiveness have not been solved. The poor connection of the reservoir determined that waterflooding could not get good development effect and the production had to depend on the reservoir elastic energy, and this will bring big difficulty for development modification and improvement of oil recovery. This study formed a series of techniques for heterogeneous model research that can be used to construct heterogeneous model consistent with the reservoir geology. Thus the development effectiveness, success ratio of drilling and percent of producing reserves can be enhanced. This study can make the development of buried hill reservoir be of high recovery rate and high effect. The achievements of this study are as follows: 1. Evaluated the resources, summarized the geological characteristics and carried out the reservoir classification of the buried hill reservoirs in Shengli petroliferous area; 2. Established the markers for stratigraphical correlation and formed the correlation method for complex buried hill reservoirs; 3. Analyzed the structural features of the buried hill reservoirs, finished the structure interpretation and study of faulting system using synthetic seismograms, horizontal slices and coherent analysis, and clarified structural development history of the buried hill reservoirs in Shengli petroliferous area; 4. Determined the 3 classes and 7 types of pore space and the main pore space type, the logging response characteristics and the FMI logging identified difference between artificial and natural fractures by the comprehensive usage of core analysis, other lab analyses, conventional logging, FMI logging and CMR logging; 5. Determined the factors controlled the growth of the fractures, vugs and cavities, proposed the main formation prediction method for buried hill reservoir and analyzed their technical principium and applicability, and formed the seismic method and process for buried hill reservoir description; 6. Established the reserve calculation method for buried hill reservoirs, i. e. the reserves of fractures and matrix are calculated separately; the recoverable reserves are calculated by decline method and are classified by the SPE criteria; 7. Studied restraining barriers and the sealing of the faults thus clarified the oil-bearing formations of the buried hill reservoirs, and verified the multiple reservoir forming theory; 8. Formed reasonable procedure of buried hill reservoir study; 9. Formed the 3 D modeling technology for buried hill reservoirs; 10. Studied a number of buried hill blocks on the aspects of reservoir description, reservoir engineering and development plan optimization based on the above research and the profit and social effect are remarkable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Guided by geological theories, the author analyzed factual informations and applied advanced technologies including logging reinterpretation, predicting of fractal-based fracture network system and stochastic modeling to the low permeable sandstone reservoirs in Shengli oilfield. A new technology suitable for precious geological research and 3D heterogeneity modeling was formed through studies of strata precious correlation, relation between tectonic evolution and fractural distribution, the control and modification of reservoirs diagenesis, logging interpretation mathematical model, reservoir heterogeneity, and so on. The main research achievements are as follows: (1) Proposed four categories of low permeable reservoirs, which were preferable, general, unusual and super low permeable reservoir, respectively; (2) Discussed ten geological features of the low permeable reservoirs in Shengli area; (3) Classified turbidite fan of Es_3 member of the Area 3 in Bonan oilfield into nine types of lithological facies, and established the facies sequences and patterns; (4) Recognized that the main diagenesis were compaction, cementation and dissolution, among which the percent compaction was up to 50%~90%; (5) Divided the pore space in ES_3 member reservoir into secondary pores with dissolved carbonate cement and residual intergranular pores strongly compacted and cemented; (6) Established logging interpretation mathematical model guided by facies- control modeling theory; (7) Predicted the fracture distribution in barriers using fractal method; (8) Constructed reservoir structural model by deterministic method and the 3D model of reservoir parameters by stochastic method; (9) Applied permeability magnitudes and directions to describe the fractures' effect on fluid flow, and presented four different fractural configurations and their influence on permeability; (10) Developed 3D modeling technology for the low permeable sandstone reservoirs. The research provided reliable geological foundation for the establishment and modification of development plans in low permeable sandstone reservoirs, improved the development effect and produced more reserves, which provided technical support for the stable and sustained development of Shengli Oilfield.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Through years of practice, reservoir management has already become the basic mode of foreign oil companies to realize the high-efficient development of the oil field. From the view of reservoir development and technological economy, reservoir management regards the study of the reservoir engineering, designs of reservoir projects and the dynamic analysis of the reservoir's performance as a system. In the fields of reservoir description, the establishment of the geological models and development models, the dynamic simulations of reservoir exploitation and the design of the oil engineering, reservoir management emphasizes the cooperation of the geology and the engineering, the combination of the engineering technology and the economic evaluation. In order to provide the means and basis for the reservoir geology study, reservoir evaluation, reserves calculation, numerical simulation, development plan and risk analysis, it adopts the reservoir management activities(team work) to make and implement the optimized oil field development management strategies so that secientific and democratic decision making can be achieved. Under the planned economic system for a long time, the purpose of Chinese reservoir development has been to fulfill the" mandatory" production task. With the deepening of the reform, the management organization of Chinese petroleum enterprises has been gradually going through the transition and reforms to the operational entity and the establishment of the mode of oil companies under the socialist market economy system. This research aims at introducing the advanced reservoir management technique from foreign countries to further improve the reservoir development results and wholly raise the economic benefits of Chinese mature land facieses sandstone reservoirs in the later stage of the water flooding. We are going to set up a set of modern reservoir management modes according to the reservoir features, current situation and existing problems of GangXi oil field of DaGang oil company. Through the study and implementation of the reservoir description and numerical simulation technology effectively, we plan to work out integrated adjustment projects, to study the related technology of oil recovery; to set up the effective confirmable data procedure and data management system of the reservoir management, to establish the coordinated model and workbench related to geology, engineering and economy in order to realize the real time supervision and evaluation on the process of reservoir development. We hope to stipulate modernization management tools for GangXi oil fields to rationally utilize various kinds of existing technological methods and to realize the economic exploitation and achieve the maximum benefits from the reservoir. The project of the modem reservoir management will be carried out on the GangXi oil field of DaGang oil company for this oil field is typical and has integrated foundamental materials and perfect networks. Besides, it is located in the good geographical position enjoying very convenient traffic. Implementing modern reservoir management will raise the recovery ratio, reduce the production cost and improve the working efficiency. Moreover, the popularization of modern reservoir management will improve the comprehensive benefits of DaGang oil company and even the whole Petro China. Through the reserch of this project, the following technical indicators can be reached: Establishing the concept of modern reservoir management. Establishing a set of integrated data information management system adapt to the features of GangXi reservoir. 3. Forming technical research modes of modern reservoir management suitable for mature reservoirs in the later developing stage. 4. Advancing projects of GangXi reservoir which are maxium optimized in engineering technique and economic benefits of oil exploitation. Besides, this set of technology, research principle and method can guide the mature reservoir of DaGang oil field and even the whole PetroChina to develop the further research of reservoir adjustment and improve the reservoir recovery factor and developing level constantly.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Accurate knowledge of traffic demands in a communication network enables or enhances a variety of traffic engineering and network management tasks of paramount importance for operational networks. Directly measuring a complete set of these demands is prohibitively expensive because of the huge amounts of data that must be collected and the performance impact that such measurements would impose on the regular behavior of the network. As a consequence, we must rely on statistical techniques to produce estimates of actual traffic demands from partial information. The performance of such techniques is however limited due to their reliance on limited information and the high amount of computations they incur, which limits their convergence behavior. In this paper we study a two-step approach for inferring network traffic demands. First we elaborate and evaluate a modeling approach for generating good starting points to be fed to iterative statistical inference techniques. We call these starting points informed priors since they are obtained using actual network information such as packet traces and SNMP link counts. Second we provide a very fast variant of the EM algorithm which extends its computation range, increasing its accuracy and decreasing its dependence on the quality of the starting point. Finally, we evaluate and compare alternative mechanisms for generating starting points and the convergence characteristics of our EM algorithm against a recently proposed Weighted Least Squares approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The International Energy Agency has repeatedly identified increased end-use energy efficiency as the quickest, least costly method of green house gas mitigation, most recently in the 2012 World Energy Outlook, and urges all governing bodies to increase efforts to promote energy efficiency policies and technologies. The residential sector is recognised as a major potential source of cost effective energy efficiency gains. Within the EU this relative importance can be seen from a review of the National Energy Efficiency Action Plans (NEEAP) submitted by member states, which in all cases place a large emphasis on the residential sector. This is particularly true for Ireland whose residential sector has historically had higher energy consumption and CO2 emissions than the EU average and whose first NEEAP targeted 44% of the energy savings to be achieved in 2020 from this sector. This thesis develops a bottom-up engineering archetype modelling approach to analyse the Irish residential sector and to estimate the technical energy savings potential of a number of policy measures. First, a model of space and water heating energy demand for new dwellings is built and used to estimate the technical energy savings potential due to the introduction of the 2008 and 2010 changes to part L of the building regulations governing energy efficiency in new dwellings. Next, the author makes use of a valuable new dataset of Building Energy Rating (BER) survey results to first characterise the highly heterogeneous stock of existing dwellings, and then to estimate the technical energy savings potential of an ambitious national retrofit programme targeting up to 1 million residential dwellings. This thesis also presents work carried out by the author as part of a collaboration to produce a bottom-up, multi-sector LEAP model for Ireland. Overall this work highlights the challenges faced in successfully implementing both sets of policy measures. It points to the wide potential range of final savings possible from particular policy measures and the resulting high degree of uncertainty as to whether particular targets will be met and identifies the key factors on which the success of these policies will depend. It makes recommendations on further modelling work and on the improvements necessary in the data available to researchers and policy makers alike in order to develop increasingly sophisticated residential energy demand models and better inform policy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We study the implications of the effectuation concept for socio-technical artifact design as part of the design science research (DSR) process in information systems (IS). Effectuation logic is the opposite of causal logic. Ef-fectuation does not focus on causes to achieve a particular effect, but on the possibilities that can be achieved with extant means and resources. Viewing so-cio-technical IS DSR through an effectuation lens highlights the possibility to design the future even without set goals. We suggest that effectuation may be a useful perspective for design in dynamic social contexts leading to a more dif-ferentiated view on the instantiation of mid-range artifacts for specific local ap-plication contexts. Design science researchers can draw on this paper’s conclu-sions to view their DSR projects through a fresh lens and to reexamine their re-search design and execution. The paper also offers avenues for future research to develop more concrete application possibilities of effectuation in socio-technical IS DSR and, thus, enrich the discourse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

info:eu-repo/semantics/nonPublished

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the development of provision for the training of teachers in English further and technical education from 1945 to 1956. While these years saw little growth in this provision, they were formative in that the institutional and curricular patterns of teacher training for the diverse fields of technical and further education were developed at this time. The work of the three national centres in Bolton, London and Huddersfield, during the period of the Emergency Training Scheme (ETS) is summarised with particular reference to the influence of the Ministry of Education‟s conditions for ETS colleges and courses. With the ending of the ETS in 1951 the three centres were given permanent status as teacher training colleges which in turn brought them into association with their local universities as constituent colleges of their Area Training Organisations. The consequences of this transfer to the universities for the curriculum and assessment of technical teacher training and the 'policy dichotomy' of teacher training for secondary and technical education are examined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to create a picture of aspects of the working lives of some trainers of technical and further education teachers in a specialist teacher training college in Bolton, Lancashire, from the 1950s to the 1980's. There is little reference to technical teacher training in the literature on teacher training in the second half of the twentieth century. With this gap in mind, this paper sets out to record some memories and impressions of staff involved during these years. Using data from a series of semi-structured interviews, the discussion centres upon their perceptions of their work: of their students, the working environment, the curriculum and their relationships with the technical colleges for whom they were training teachers. The paper has three sections. It begins with a brief discussion of the issues arising from the choice of research methods. The second section contextualises the study and traces the history of Bolton Technical Teachers' Training College from its establishment through to its merger with the Institute of Technology in 1982. This is followed by the presentation and discussion of the interview data.