899 resultados para Supply Chain Management (SCM)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study is to understand how different members manage risk in the global supply chain. Through a multi-case study of the Brazilian mango exportation chain to the United States, four actors of this chain were investigated: supplier, exporter, importer and logistics operator. A research protocol was developed based on previous research conducted by Christopher, et al. (2011). Main results show that risk management is heterogeneous among members of the mango chain, the exporter is the most penalized by the results of the risk chain and collaboration is the main mitigation strategy observed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Da sich Additive Manufacturing (AM) von traditionellen Produktionsverfahren unterscheidet, entstehen neue Möglichkeiten im Produktdesign und im Supply Chain Setup. Die Auswirkungen der Aufhebung traditionellen Restriktionen im Produktdesign werden unter dem Begriff „Design for Additive Manufacturing“ intensiv diskutiert. In gleicher Weise werden durch AM Restriktionen im traditionellen Supply Chain Setup aufgehoben. Insbesondere sind die folgenden Verbesserungen möglich: Reduktion von Losgrössen und Lieferzeiten, bedarfsgerechte Produktion auf Abruf, dezentrale Produktion, Customization auf Ebene Bauteil und kontinuierliche Weiterentwicklung von Bauteilen. Viele Firmen investieren nicht selbst in die AM Technologien, sondern kaufen Bauteile bei Lieferanten. Um das Potential der AM Supply Chain mit Lieferanten umzusetzen, entstehen die folgenden Anforderungen an AM Einkaufsprozesse. Erstens muss der Aufwand pro Bestellung reduziert werden. Zweitens brauchen AM Nutzer einen direkten Zugang zu den Lieferanten ohne Umweg über die Einkaufsabteilung. Drittens müssen geeignete AM Lieferanten einfach identifiziert werden können. Viertens muss der Wechsel von Lieferanten mit möglichst geringem Aufwand möglich sein. Ein mögliche Lösung sind AM spezifische E-Procurement System um diese Anforderungen zu erfüllen

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article analyzes the outsourcing of information technology services, using an action inquiry methodology. Research spanned the disengagement and beginning of IT service functions transferred from work groups in the parent company to outsource teams. Results identified the importance of addressing strategic issues and inter/intra relationships between parent company team members and their outsource-counterparts. Conclusions indicate that behavioral issues such as psychological contracts within inter/intra work groups, power and trust are highly significant managerial issues in the success or failure of an outsourcing strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Supply chains are advocated widely as being the new units for commercial competition and developments have made the sharing of supply chain wide information increasingly common. Most organisations however still make operational decisions intended to maximise local organisational performance. With improved information sharing a holistic focus for operational decisions should now be possible. The development of a pan supply chain performance framework requires an examination of the conditions under which holistic-decisions provide benefits to either the individual enterprise or the complete supply chain. This paper presents the background and supporting methodology for a study of the impact of an overall supply chain performance metric framework upon local logistics decisions and the conditions under which such a framework would improve overall supply chain performance. The methodology concludes a simulation approach using a functionally extended Gensym's e-SCOR model, together with case based triangulation, to be optimum. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a Decision Support System framework based on Constrain Logic Programming and offers suggestions for using RFID technology to improve several of the critical procedures involved. This paper suggests that a widely distributed and semi-structured network of waste producing and waste collecting/processing enterprises can improve their planning both by the proposed Decision Support System, but also by implementing RFID technology to update and validate information in a continuous manner. © 2010 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper is to explore the management of information in an aerospace manufacturer's supply chain by analysing supply chain disruption risks. The social network perspective will be used to examine the flows of information in the supply chain. The examination of information flows will also be explored in terms of push and pull information management. The supply chain risk management (SCRM) strategy is to assess the management of information that allows companies to gather information which will allow them to mitigate that risk before any disruption to the supply chain occurs. There is a shortage of models in analysing the supply chain risk associated with information flows, possibly due to the omission of appropriate modelling techniques in this area (Tang and Nurmaya, 2011). This paper uses an exploratory case study consisting of a multi method qualitative approach using fifteen interviews and four focus groups.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We apply cooperative game theory concepts to analyze a Holt-Modigliani-Muth-Simon (HMMS) supply chain. The bullwhip effect in a two-stage supply chain (supplier-manufacturer) in the framework of the HMMS-model with quadratic cost functions is considered. It is assumed that both firms minimize their relevant costs, and two cases are examined: the supplier and the manufacturer minimize their relevant costs in a decentralized and in a centralized (cooperative) way. The question of how to share the savings of the decreased bullwhip effect in the centralized (cooperative) model is answered by the weighted Shapley value, by a transferable utility cooperative game theory tool, where the weights are for the exogenously given “bargaining powers” of the participants of the supply chain. = A cikkben a kooperatív játékelmélet fogalmait alkalmazzuk egy Holt-Mogigliani-Muth-Simon-típusú ellátási lánc esetében. Az ostorcsapás-hatás elemeit egy beszállító-termelő ellátási láncban ragadjuk meg egy kvadratikus készletezési és termelési költség mellett. Feltételezzük, hogy mindkét vállalat minimalizálja a releváns költségeit. Két működési rendszert hasonlítunk össze: egy hierarchikus döntéshozatali rendszert, amikor először a termelő, majd a beszállító optimalizálja helyzetét, majd egy centralizált (kooperatív) modellt, amikor a vállalatok az együttes költségüket minimalizálják. A kérdés úgy merül fel, hogy a csökkentett ostorcsapás-hatás esetén hogyan osszák meg a részvevők ebben a transzferálható hasznosságú kooperatív játékban a költség megtakarítást, exogén módon adott tárgyalási pozíció mellett.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, a joint location-inventory model is proposed that simultaneously optimises strategic supply chain design decisions such as facility location and customer allocation to facilities, and tactical-operational inventory management and production scheduling decisions. All this is analysed in a context of demand uncertainty and supply uncertainty. While demand uncertainty stems from potential fluctuations in customer demands over time, supply-side uncertainty is associated with the risk of “disruption” to which facilities may be subject. The latter is caused by external factors such as natural disasters, strikes, changes of ownership and information technology security incidents. The proposed model is formulated as a non-linear mixed integer programming problem to minimise the expected total cost, which includes four basic cost items: the fixed cost of locating facilities at candidate sites, the cost of transport from facilities to customers, the cost of working inventory, and the cost of safety stock. Next, since the optimisation problem is very complex and the number of evaluable instances is very low, a "matheuristic" solution is presented. This approach has a twofold objective: on the one hand, it considers a larger number of facilities and customers within the network in order to reproduce a supply chain configuration that more closely reflects a real-world context; on the other hand, it serves to generate a starting solution and perform a series of iterations to try to improve it. Thanks to this algorithm, it was possible to obtain a solution characterised by a lower total system cost than that observed for the initial solution. The study concludes with some reflections and the description of possible future insights.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, global supply chains have increasingly suffered from reliability issues due to various external and difficult to-manage events. The following paper aims to build an integrated approach for the design of a Supply Chain under the risk of disruption and demand fluctuation. The study is divided in two parts: a mathematical optimization model, to identify the optimal design and assignments customer-facility, and a discrete-events simulation of the resulting network. The first one describes a model in which plant location decisions are influenced by variables such as distance to customers, investments needed to open plants and centralization phenomena that help contain the risk of demand variability (Risk Pooling). The entire model has been built with a proactive approach to manage the risk of disruptions assigning to each customer two types of open facilities: one that will serve it under normal conditions and a back-up facility, which comes into operation when the main facility has failed. The study is conducted on a relatively small number of instances due to the computational complexity, a matheuristic approach can be found in part A of the paper to evaluate the problem with a larger set of players. Once the network is built, a discrete events Supply Chain simulation (SCS) has been implemented to analyze the stock flow within the facilities warehouses, the actual impact of disruptions and the role of the back-up facilities which suffer a great stress on their inventory due to a large increase in demand caused by the disruptions. Therefore, simulation follows a reactive approach, in which customers are redistributed among facilities according to the interruptions that may occur in the system and to the assignments deriving from the design model. Lastly, the most important results of the study will be reported, analyzing the role of lead time in a reactive approach for the occurrence of disruptions and comparing the two models in terms of costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial