998 resultados para Ships -- Ontario -- Niagara Peninsula -- History.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Printed by Order of the Legislative Assembly of Ontario.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Illustrated by maps of the Falls and immediate vicinity, and of the Niagara River, from Lake Erie to Lake Ontario, and six new views."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ontario Editorial Bureau (O.E.B.)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ontario Editorial Bureau (O.E.B.)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Some Ecological Factors Affecting the Input and Population Levels of Total and Faecal Coliforms and Salmonella in Twelve Mile Creek, Lake Ontario and Sewage Waters Near St. Catharines, Ontario. Supervisor: Dr. M. Helder. The present study was undertaken to investigate the role of some ecological factors on sewage-Dorne bacteria in waters near St. Catharines, Ontario. Total and faecal coliform levels and the presence of Salmonella were monitored for a period of a year along with determination of temperature, pH, dissolved oxygen, total dissolved solids, nitrate N, total phosphate P and ammonium N. Bacteriological tests for coliform analysis were done according to APHA Standard Methods by the membrane filtration technique. The grab sampling technique was employed for all sampling. Four sample sites were chosen in the Port Dalhousie beach area to determine what bacteriological or physical relationship the sites had to each other. The sample sites chosen were the sewage inflow to and the effluent from the St. Catharines (Port Dalhousie) Pollution Control Plant, Twelve Mile Creek below the sewage outfall and Lake Ontario at the Lakeside Park beach. The sewage outfall was located in Twelve Mile Creek, approximately 80 meters from the creek junction with the beach and piers on Lake Ontario. Twelve Mile Creek normally carried a large volume of water from the WeIland Canal which was diverted through the DeCew Generating Station located on the Niagara Escarpment. An additional sample site, which was thought to be free of industrial wastes, was chosen at Twenty Mile Creek, also in the Niagara Region of Ontarioo 3 There were marked variations in bacterial numbers at each site and between each site, but trends to lower_numbers were noted from the sewage inflow to Lake Ontario. Better correlations were noted between total and faecal coliform population levels and total phosphate P and ammonium N in Twenty Mile Creek. Other correlations were observed for other sample stations, however, these results also appeared to be random in nature. Salmonella isolations occurred more frequently during the winter and spring months when water temperatures were minimal at all sample stations except the sewage inflow. The frequency of Salmonella isolations appeared to be related to increased levels of total and faecal coli forms in the sewage effluent. However, no clear relationships were established in the other sample stations. Due to the presence of Salmonella and high levels of total and faecal coliform indicator organisms, the sanitary quality of Lake Ontario and Twelve Mile Creek at the sample sites seemed to be impaired over the major portion of the study period.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Part I - Fluorinated Compounds A method has been developed for the extraction, concentration, and determination of two unique fluorinated compounds from the sediments of Lake Ontario. These compounds originated from a common industrial landfill, and have been carried to Lake Ontario by the Niagara River. Sediment samples from the Mississauga basin of Lake Ontario have been evaluated for these compounds and a depositional trend was established. The sediments were extracted by accelerated solvent extraction (ASE) and then underwent clean-up, fractionation, solvent exchange, and were concentrated by reduction under nitrogen gas. The concentrated extracts were analyzed by gas chromatography - electron capture negative ionization - mass spectrometry. The depositional profile determined here is reflective of the operation of the landfill and shows that these compounds are still found at concentrations well above background levels. These increased levels have been attributed to physical disturbances of previously deposited contaminated sediments, and probable continued leaching from the dumpsite. Part II - Polycyclic Aromatic Hydrocarbons Gas chromatography/mass spectrometry is the most common method for the determination of polycyclic aromatic hydrocarbons (PAHs) from various matrices. Mass discrimination of high-boiling compounds in gas chromatographic methods is well known. The use of high-boiling injection solvents shows substantial increase in the response of late-eluting peaks. These solvents have an increased efficiently in the transfer of solutes from the injector to the analytical column. The effect of I-butanol, I-pentanol, cyclopentanol, I-hexanol, toluene and n-octane, as injection solvents, was studied. Higher-boiling solvents yield increased response for all PAHs. I -Hexanol is the best solvent, in terms of P AH response, but in this solvent P AHs were more susceptible to chromatographic problems such as peak splitting and tailing. Toluene was found to be the most forgiving solvent in terms of peak symmetry and response. It offered the smallest discrepancies in response, and symmetry over a wide range of initial column temperatures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research Report Written for the Canadian Breast Cancer Foundation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.