888 resultados para Rene Price
Resumo:
Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.
Resumo:
Previous studies of ignorance-driven decision-making have either analyzed when ignorance should prove advantageous on theoretical grounds, or else they have examined whether human behavior is consistent with an ignorance driven inference strategy (e.g., the recognition heuristic). The current study merges these research goals by examining whether – under conditions where ignorance driven inference might be expected – the type of advantages theoretical analyses predict are evident in human performance data. A single experiment shows that, when asked to make relative wealth judgments, participants reliably use recognition as a basis for their judgments. Their wealth judgments under these conditions are reliably more accurate when some of the target names are unknown than when participants recognize all the names (the “less-is-more effect”). these data are robust against a number of variations on the size of the pool from which participants have to choose and the nature of the wealth judgment.
Resumo:
Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.
Resumo:
This paper investigates the effect of voluntary eco-certification on the rental and sale prices of US commercial office properties. Hedonic and logistic regressions are used to test whether there are rental and sale price premiums for LEED and Energy Star certified buildings. The results of the hedonic analysis suggest that there is a rental premium of approximately 6% for LEED and Energy Star certification. A sale price premium of approximately 35% was found for 127 price observations involving LEED rated buildings and 31% for 662 buildings involving Energy Star rated buildings. When compared to samples of similar buildings identified by a binomial logistic regression for LEED-certified buildings, the existence of a rent and sales price premium is confirmed albeit with differences regarding the magnitude of the premium. Overall, the results of this study confirm that LEED and Energy Star buildings exhibit higher rental rates and sales prices per square foot controlling for a large number of location- and property-specific factors.