767 resultados para Projects decisions


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper focuses on timing of fertility decisions, conditional on the level of educational attainment of parents. Timing of fertility and educational attainment of parents rationalize the negative relationship observed in the data between hourly wages and childbearing. It is shown how the recent evolution in total fertility rates observed in developed countries could be in part the result of a transition from an early childbearing regime to a late childbearing regime. I develop a general equilibrium overlapping generations model in order to understand the joint determination of timing of childbearing decisions together with other household economic decisions in a life cycle framework. I show how idiosyncratic uncertainty might have asymmetric efects on completed fertility depending on timing of childbearing, generating the diferences in completed fertility observed between households that difer in their level of educational attainment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Les decisions que comentaré entorn de la construcció d'un informe etnografic estan basades en l'experiencia d'un procés de recerca en la realització d'un estudi de cas. La finalitat d'aquest estudi de cas únic era pretendre comprendre una vida professional docent per tal de descriure, analitzar i interpretar la complexitat del que és i envolta la vida d'una mestra, considerant tant els aspectes biografics -personals i professionals- com els aspectes de la seva practica i, alhora, relacionar ambdós en un context cultural més ampli (escola, sistema educatiu, valors socials, etc.).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a great deal of concern by county engineers and supervisors over constrained budgets, lack of resources and a deteriorating infrastructure, as they affect the secondary road system in Iowa. In addition, public input and/or political pressure have been increasing over the years. This study was initiated to determine the most important issues facing counties and document the way in which various Iowa counties have been addressing those issues. The list of issues was developed through meetings of county engineers and supervisors in each of the Iowa Department of Transportation (DOT) regions around the state. Questionnaires were sent to all engineers and supervisors statewide asking them how the various issues (e.g. snow and ice removal policies, Level "B" roads, and so on) were handled in their respective counties. The responses were then compiled into this document. The subjects selected and used include: county policies, ordinances, resolutions; snow and ice removal policy; dust control; Level "B" roads; vacating roads; rural development; private entrance construction and maintenance; roadside management practices; right of way encroachments and easements; personnel matters, staff and organization; communicating information to citizens; supervisor/ engineer relations; and county leasing/purchasing practices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power Fund Awarded Projects from the Office of Energy Independence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power Fund Awarded Projects from the Office of Energy Independence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Highway Research Project HR-392 was undertaken to evaluate cold in-place asphalt recycled (CIR) projects in the State of Iowa. The research involved assessment of performance levels, investigation of factors that most influence pavement performance and economy, and development of guidelines for CIR project selection. The performance was evaluated in two ways: Pavement Condition Indices (PCI, U.S. Corps of Engineers) were calculated and overall ratings were given on ride and appearance. A regression analysis was extrapolated to predict the future service life of CIR roads. The results were that CIR roads within the State of Iowa, with less than 2000 annual average daily traffic (AADT), have an average predicted service life of fifteen to twenty-six years. Subgrade stability problems can prevent a CIR project from being successfully constructed. A series of Dynamic Cone Penetrometer (DCP) tests were conducted on a CIR project that experienced varying levels of subgrade failure during construction. Based on this case study, and supporting data, it was determined that the DCP test can be used to evaluate subgrades that have insufficient stability for recycling. Overall, CIR roads in Iowa are performing well. It appears that the development of transverse cracking has been retarded and little rutting has occurred. Contracting agencies must pay special attention to the subgrade conditions during project selection. Because of its performance, CIR is a recommended method to be considered for rehabilitating aged low volume (<2000 AADT) asphalt concrete roads in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stream channel erosion in the deep loess soils region of western Iowa causes severe damage along hundreds of miles of streams in twenty-two counties. The goal of this project was to develop information, systems, and procedures for use in making resource allocation decisions related to the protection of transportation facilities and farmland from damages caused by stream channel erosion. Section one of this report provides an introduction. Section two presents an assessment of stream channel conditions from aerial and field reconnaissance conducted in 1993 and 1994 and a classification of the streams based on a six stage model of stream channel evolution. A Geographic Information System is discussed that has been developed to store and analyze data on the stream conditions and affected infrastructure and assist in the planning of stabilization measures. Section three presents an evaluation of two methods for predicting the extent of channel degradation. Section four presents an estimate of costs associated with damages from stream channel erosion since the time of channelization until 1992. Damage to highway bridges represent the highest costs associated with channel erosion, followed by railroad bridges and right-of-way; loss of agricultural land represents the third highest cost. An estimate of costs associated with future channel erosion on western Iowa streams is also presented in section four. Section four also presents a procedure to estimate the benefits and costs of implementing stream stabilization measures. The final section of this report, section five, presents information on the development of the organizational structure and administrative procedures which are being used to plan, coordinate, and implement stream stabilization projects and programs in western Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report contains findings on 52 lake restoration projects. It summarizes the interpretation of the detailed project reports, maps, and cost estimates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure sustainment of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.