941 resultados para Project method


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A parallel algorithm for image noise removal is proposed. The algorithm is based on peer group concept and uses a fuzzy metric. An optimization study on the use of the CUDA platform to remove impulsive noise using this algorithm is presented. Moreover, an implementation of the algorithm on multi-core platforms using OpenMP is presented. Performance is evaluated in terms of execution time and a comparison of the implementation parallelised in multi-core, GPUs and the combination of both is conducted. A performance analysis with large images is conducted in order to identify the amount of pixels to allocate in the CPU and GPU. The observed time shows that both devices must have work to do, leaving the most to the GPU. Results show that parallel implementations of denoising filters on GPUs and multi-cores are very advisable, and they open the door to use such algorithms for real-time processing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, there is an increasing number of robotic applications that need to act in real three-dimensional (3D) scenarios. In this paper we present a new mobile robotics orientated 3D registration method that improves previous Iterative Closest Points based solutions both in speed and accuracy. As an initial step, we perform a low cost computational method to obtain descriptions for 3D scenes planar surfaces. Then, from these descriptions we apply a force system in order to compute accurately and efficiently a six degrees of freedom egomotion. We describe the basis of our approach and demonstrate its validity with several experiments using different kinds of 3D sensors and different 3D real environments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the present work, a three-dimensional (3D) formulation based on the method of fundamental solutions (MFS) is applied to the study of acoustic horns. The implemented model follows and extends previous works that only considered two-dimensional and axisymmetric horn configurations. The more realistic case of 3D acoustic horns with symmetry regarding two orthogonal planes is addressed. The use of the domain decomposition technique with two interconnected sub-regions along a continuity boundary is proposed, allowing for the computation of the sound pressure generated by an acoustic horn installed on a rigid screen. In order to reduce the model discretization requirements for these cases, Green’s functions derived with the image source methodology are adopted, automatically accounting for the presence of symmetry conditions. A strategy for the calculation of an optimal position of the virtual sources used by the MFS to define the solution is also used, leading to improved reliability and flexibility of the proposed method. The responses obtained by the developed model are compared to reference solutions, computed by well-established models based on the boundary element method. Additionally, numerically calculated acoustic parameters, such as directivity and beamwidth, are compared with those evaluated experimentally.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Measurement of concrete strain through non-invasive methods is of great importance in civil engineering and structural analysis. Traditional methods use laser speckle and high quality cameras that may result too expensive for many applications. Here we present a method for measuring concrete deformations with a standard reflex camera and image processing for tracking objects in the concretes surface. Two different approaches are presented here. In the first one, on-purpose objects are drawn on the surface, while on the second one we track small defects on the surface due to air bubbles in the hardening process. The method has been tested on a concrete sample under several loading/unloading cycles. A stop-motion sequence of the process has been captured and analyzed. Results have been successfully compared with the values given by a strain gauge. Accuracy of our methods in tracking objects is below 8 μm, in the order of more expensive commercial devices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

[Introduction.] Over the last two years, not only inside but also outside the framework of the EU treaties, far reaching measures have been taken at the highest political level in order to address the financial and economic crisis in Europe and in particular the sovereign debt crisis in the Euro area. This has triggered debates forecasting the “renationalisation of European politics.” Herman Van Rompuy, the President of the European Council, countered the prediction that Europe is doomed because of such a renationalisation: “If national politics have a prominent place in our Union, why would this not strengthen it?” He took the view that not a renationalisation of European politics was at stake, but an Europeanization of national politics emphasising that post war Europe was never developed in contradiction with nation states.1 Indeed, the European project is based on a mobilisation of bundled, national forces which are of vital importance to a democratically structured and robust Union that is capable of acting in a globalised world. To that end, the Treaty of Lisbon created a legal basis. The new legal framework redefines the balance between the Union institutions and confirms the central role of the Community method in the EU legislative and judiciary process. This contribution critically discusses the development of the EU's institutional balance after the entry into force of the Treaty of Lisbon, with a particular emphasis on the use of the Community Method and the current interplay between national constitutional courts and the Court of Justice. This interplay has to date been characterised by suspicion and mistrust, rather than by a genuine dialogue between the pertinent judicial actors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"This report...was written while the project was a part of Douglas Aircraft Co., inc."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Contribution of the Federal Aid in Wildlife Restoration Act, Final report for Texas Federal Aid project 25-R, July l, 1946, to March 30, 1948.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contract No. 954471 under NAS 7-100 SRI Project PYU 4980."