864 resultados para Process model alignment
Resumo:
Process modeling is an important design practice in organizational improvement projects. In this paper, we examine the design of business process diagrams in contexts where novice analysts only have basic design tools such as paper and pencils available, and little to no understanding of formalized modeling approaches. Based on a quasi-experimental study with 89 BPM students, we identify five distinct process design archetypes ranging from textual to hybrid and graphical representation forms. We examine the quality of the designs and identify which representation formats enable an analyst to articulate business rules, states, events, activities, temporal and geospatial information in a process model. We found that the quality of the process designs decreases with the increased use of graphics and that hybrid designs featuring appropriate text labels and abstract graphical forms appear well-suited to describe business processes. We further examine how process design preferences predict formalized process modeling ability. Our research has implications for practical process design work in industry as well as for academic curricula on process design.
Resumo:
A service-oriented system is composed of independent software units, namely services, that interact with one another exclusively through message exchanges. The proper functioning of such system depends on whether or not each individual service behaves as the other services expect it to behave. Since services may be developed and operated independently, it is unrealistic to assume that this is always the case. This article addresses the problem of checking and quantifying how much the actual behavior of a service, as recorded in message logs, conforms to the expected behavior as specified in a process model.We consider the case where the expected behavior is defined using the BPEL industry standard (Business Process Execution Language for Web Services). BPEL process definitions are translated into Petri nets and Petri net-based conformance checking techniques are applied to derive two complementary indicators of conformance: fitness and appropriateness. The approach has been implemented in a toolset for business process analysis and mining, namely ProM, and has been tested in an environment comprising multiple Oracle BPEL servers.
Resumo:
This paper proposes a model-based technique for lowering the entrance barrier for service providers to register services with a marketplace broker, such that the service is rapidly configured to utilize the brokerpsilas local service delivery management components. Specifically, it uses process modeling for supporting the execution steps of a service and shows how service delivery functions (e.g. payment points) ldquolocalrdquo to a service broker can be correctly configured into the process model. By formalizing the different operations in a service delivery function (like payment or settlement) and their allowable execution sequences (full payments must follow partial payments), including cross-function dependencies, it shows how through tool support, the non-technical user can quickly configure service delivery functions in a consistent and complete way.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
This month, Jan Recker turns his attention to the technological side of BPM research and education. He engaged in a collaboration with two colleagues at Queensland University, Dr Marcello La Rosa and Eike Bernhard, on an initiative on the development of an advanced BPM technology - an Advanced Process Model Repository called Apromore. In this Column, they use the example of Apromore to showcase how BPM technologies are conceived, designed, developed and applied.
Resumo:
In this short keynote paper, I will briefly explore the current state of research and practice surrounding the BPMN standard. On basis of this analysis I will offer a personal outlook into the key emerging areas where I believe more research will be required to further understand BPMN, its premise and promise, and how we can shape – and join together – the landscape of BPMN practice and development in academia and industry.
Resumo:
Although the drivers of innovation have been studied extensively in construction, greater attention is required on how innovation diffusion can be effectively assessed within this complex and interdependent project-based industry. The authors draw on a highly cited innovation diffusion model by Rogers (2006) and develop a tailored conceptual framework to guide future empirical work aimed at assessing innovation diffusion in construction. The conceptual framework developed and discussed in this paper supports a five-stage process model of innovation diffusion namely: 1) knowledge and idea generation, 2) persuasion and evaluation; 3) decision to adopt, 4) integration and implementation, and 5) confirmation. As its theoretical contribution, this paper proposes three critical measurements constructs which can be used to assess the effectiveness of the diffusion process. These measurement constructs comprise: 1) nature and introduction of an innovative idea, 2) organizational capacity to acquire, assimilate, transform and exploit an innovation, and 3) rates of innovation facilitation and adoption. The constructs are interpreted in the project-based context of the construction industry, extending the contribution of general management theorists. Research planned by the authors will test the validity and reliability of the constructs developed in this paper.
Resumo:
This paper proposes a concrete approach for the automatic mitigation of risks that are detected during process enactment. Given a process model exposed to risks, e.g. a financial process exposed to the risk of approval fraud, we enact this process and as soon as the likelihood of the associated risk(s) is no longer tolerable, we generate a set of possible mitigation actions to reduce the risks' likelihood, ideally annulling the risks altogether. A mitigation action is a sequence of controlled changes applied to the running process instance, taking into account a snapshot of the process resources and data, and the current status of the system in which the process is executed. These actions are proposed as recommendations to help process administrators mitigate process-related risks as soon as they arise. The approach has been implemented in the YAWL environment and its performance evaluated. The results show that it is possible to mitigate process-related risks within a few minutes.
Resumo:
This article proposes an approach for real-time monitoring of risks in executable business process models. The approach considers risks in all phases of the business process management lifecycle, from process design, where risks are defined on top of process models, through to process diagnosis, where risks are detected during process execution. The approach has been realized via a distributed, sensor-based architecture. At design-time, sensors are defined to specify risk conditions which when fulfilled, are a likely indicator of negative process states (faults) to eventuate. Both historical and current process execution data can be used to compose such conditions. At run-time, each sensor independently notifies a sensor manager when a risk is detected. In turn, the sensor manager interacts with the monitoring component of a business process management system to prompt the results to process administrators who may take remedial actions. The proposed architecture has been implemented on top of the YAWL system, and evaluated through performance measurements and usability tests with students. The results show that risk conditions can be computed efficiently and that the approach is perceived as useful by the participants in the tests.
Resumo:
Despite advances in the field of workflow flexibility, there is still insufficient support for dealing with unforeseen exceptions. In particular, it is challenging to find a solution which preserves the intent of the process as much as possible when such exceptions are encountered. This challenge can be alleviated by making the connection between a process and its objectives more explicit. This paper presents a demo illustrating the blended workflow approach where two specifications are fused together, a "classic" process model and a goal model. End users are guided by the process model but may deviate from this model whenever unexpected situations are encountered. The two models involved provide views on the process and the demo shows how one can switch between these views and how they are kept consistent by the blended workflow engine. A simple example involving the making of a doctor's appointment illustrates the potential advantages of the proposed approach to both researchers and developers.
Resumo:
This extended abstract summarizes the state-of-the-art solution to the structuring problem for models that describe existing real world or envisioned processes. Special attention is devoted to models that allow for the true concurrency semantics. Given a model of a process, the structuring problem deals with answering the question of whether there exists another model that describes the process and is solely composed of structured patterns, such as sequence, selection, option for simultaneous execution, and iteration. Methods and techniques for structuring developed by academia as well as products and standards proposed by industry are discussed. Expectations and recommendations on the future advancements of the structuring problem are suggested.
Resumo:
Video presented as part of ACIS 2009 conference in Melbourne Australia. Movie showing the execution of a small prototype Hypbolic projection of a process model. Useful for the traversal of large process models, as the entire hierarchy can be visualised as a whole, maintaining a sense of context while moving through such complex topologies. Related ACIS Conference paper is at: http://eprints.qut.edu.au/29296/
Resumo:
Video presented as part of ACIS 2009 conference in Melbourne Australia. This movie is a demonstration of the use of 3D Virtual Environments to visualise 3D BPMN Process Models, and in particular, to highlight any issues with the process model that are spatial in nature. This work is part of a paper accepted for the Asia-Pacific Conference on Conceptual Modelling (APCCM 2010) to be held in Brisbane - http://2010.apccm.org/
Resumo:
Being able to innovate has become a critical capability for many contemporary organizations in an effort to sustain their operations in the long run. However, existing innovation models that attempt to guide organizations emphasize different aspects of innovation (e.g., products, services or business models), different stages of innovation (e.g., ideation, implementation or operation) or different skills (e.g., development or crowdsourcing) that are necessary to innovate, in turn creating isolated pockets of understanding about different aspects of innovation. In order to yield more predictable innovation outcomes organizations need to understand what exactly they need to focus on, what capabilities they need to have and what is necessary in order to take an idea to market. This paper aims at constructing a framework for innovation that contributes to this understanding. We will focus on a number of different stages in the innovation process and highlight different types and levels of organizational, technological, individual and process capabilities required to manage the organizational innovation process. Our work offers a comprehensive conceptualization of innovation as a multi-level process model, and provides a range of implications for further empirical and theoretical examination.