927 resultados para Pedagogical project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2007 Australian Federal election not only saw the election of a Labor government after 11 years of John Howard’s conservative Coalition government. It also saw new levels of political engagement through the Internet, including the rise of citizen journalism as an alternative outlet and mode of reporting on the election. This paper reports on the You Decide 2007 project, an initiative undertaken by a QUT-based research team to facilitate online news reporting on the election on a ‘hyper-local’, electorate-based model. We evaluate the You Decide initiative on the basis of: promoting greater citizen participation in Australian politics; new ways of engaging citizens and key stakeholders in policy deliberation; establishing new links between mainstream media and independent online media; and broadening the base of political participation to include a wider range of citizen and groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study into best practice project delivery and the development of a suite of products, resources and services to help guide clients and project teams towards the best approach for specific projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many people and organisations continually repeat mistakes or fail to take advantage of opportunities because they have not learned from their past history, frequently as a result of not having taken the time to reflect and take stock of their experiences. This common error is avoidable, particularly with today’s capacity for information and communication technology (ICT) to enable organisations to not only record lessons learned but to easily make these available throughout an organisation. Moreover, the evidence of the literature and experience suggests that currently companies do not rigorously analyse past experience and log lessons learned using manual methods so it is hardly surprising that this trend is not changed by the availability of ICT.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cipher Cities was a practice-led research project developed in 3 stages between 2005 and 2007 resulting in the creation of a unique online community, ‘Cipher Cities’, that provides simple authoring tools and processes for individuals and groups to create their own mobile events and event journals, build community profile and participate in other online community activities. Cipher Cities was created to revitalise peoples relationship to everyday places by giving them the opportunity and motivation to create and share complex digital stories in simple and engaging ways. To do so we developed new design processes and methods for both the research team and the end user to appropriate web and mobile technologies. To do so we collaborated with ethnographers, designers and ICT researchers and developers. In teams we ran a series of workshops in a wide variety of cities in Australia to refine an engagement process and to test a series of iteratively developed prototypes to refine the systems that supported community motivation and collaboration. The result of the research is 2 fold: 1. a sophisticated prototype for researchers and designers to further experiment with community engagement methodologies using existing and emerging communications technologies. 2. A ‘human dimensions matrix’. This matrix assists in the identification and modification of place based interventions in the social, technical, spatial, cultural, pedagogical conditions of any given community. This matrix has now become an essential part of a number of subsequent projects and assists design collaborators to successfully conceptualise, generate and evaluate interactive experiences. the research team employed practice-led action research methodologies that involved a collaborative effort across the fields of interaction design and social science, in particular ethnography, in order to: 1. seek, contest, refine a design methodology that would maximise the successful application of a dynamic system to create new kinds of interactions between people, places and artefacts’. 2. To design and deploy an application that intervenes in place-based and mobile technologies and offers people simple interfaces to create and share digital stories. Cipher Cities was awarded 3 separate CRC competitive grants (over $270,000 in total) to assist 3 stages of research covering the development of the Ethnographic Design Methodologies, the development of the tools, and the testing and refinement of both the engagement models and technologies. The resulting methodologies and tools are in the process of being commercialised by the Australasian CRC for Interaction Design.

Relevância:

20.00% 20.00%

Publicador: