973 resultados para Grant funded projects
Resumo:
Nowadays, Workflow Management Systems (WfMSs) and, more generally, Process Management Systems (PMPs) are process-aware Information Systems (PAISs), are widely used to support many human organizational activities, ranging from well-understood, relatively stable and structures processes (supply chain management, postal delivery tracking, etc.) to processes that are more complicated, less structured and may exhibit a high degree of variation (health-care, emergency management, etc.). Every aspect of a business process involves a certain amount of knowledge which may be complex depending on the domain of interest. The adequate representation of this knowledge is determined by the modeling language used. Some processes behave in a way that is well understood, predictable and repeatable: the tasks are clearly delineated and the control flow is straightforward. Recent discussions, however, illustrate the increasing demand for solutions for knowledge-intensive processes, where these characteristics are less applicable. The actors involved in the conduct of a knowledge-intensive process have to deal with a high degree of uncertainty. Tasks may be hard to perform and the order in which they need to be performed may be highly variable. Modeling knowledge-intensive processes can be complex as it may be hard to capture at design-time what knowledge is available at run-time. In realistic environments, for example, actors lack important knowledge at execution time or this knowledge can become obsolete as the process progresses. Even if each actor (at some point) has perfect knowledge of the world, it may not be certain of its beliefs at later points in time, since tasks by other actors may change the world without those changes being perceived. Typically, a knowledge-intensive process cannot be adequately modeled by classical, state of the art process/workflow modeling approaches. In some respect there is a lack of maturity when it comes to capturing the semantic aspects involved, both in terms of reasoning about them. The main focus of the 1st International Workshop on Knowledge-intensive Business processes (KiBP 2012) was investigating how techniques from different fields, such as Artificial Intelligence (AI), Knowledge Representation (KR), Business Process Management (BPM), Service Oriented Computing (SOC), etc., can be combined with the aim of improving the modeling and the enactment phases of a knowledge-intensive process. The 1st International Workshop on Knowledge-intensive Business process (KiBP 2012) was held as part of the program of the 2012 Knowledge Representation & Reasoning International Conference (KR 2012) in Rome, Italy, in June 2012. The workshop was hosted by the Dipartimento di Ingegneria Informatica, Automatica e Gestionale Antonio Ruberti of Sapienza Universita di Roma, with financial support of the University, through grant 2010-C26A107CN9 TESTMED, and the EU Commission through the projects FP7-25888 Greener Buildings and FP7-257899 Smart Vortex. This volume contains the 5 papers accepted and presented at the workshop. Each paper was reviewed by three members of the internationally renowned Program Committee. In addition, a further paper was invted for inclusion in the workshop proceedings and for presentation at the workshop. There were two keynote talks, one by Marlon Dumas (Institute of Computer Science, University of Tartu, Estonia) on "Integrated Data and Process Management: Finally?" and the other by Yves Lesperance (Department of Computer Science and Engineering, York University, Canada) on "A Logic-Based Approach to Business Processes Customization" completed the scientific program. We would like to thank all the Program Committee members for the valuable work in selecting the papers, Andrea Marrella for his valuable work as publication and publicity chair of the workshop, and Carola Aiello and the consulting agency Consulta Umbria for the organization of this successful event.
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.
Resumo:
Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.
Resumo:
The Queensland University of Technology (QUT) in Brisbane, Australia, is involved in a number of projects funded by the Australian National Data Service (ANDS). Currently, QUT is working on a project (Metadata Stores Project) that uses open source VIVO software to aid in the storage and management of metadata relating to data sets created/managed by the QUT research community. The registry (called QUT Research Data Finder) will support the sharing and reuse of research datasets, within and external to QUT. QUT uses VIVO for both the display and the editing of research metadata.
Resumo:
Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.
Resumo:
In recent years, ecological thinking has been applied to a range of social, cultural and aesthetic systems, including performing arts as a living system of policy makers, producers, organisations, artists and audiences. Ecological thinking is systems-based thinking which allows us to see the performing arts as a complex and protean ecosystem; to explain how elements in this system act and interact; and to evaluate its effects on Australia’s social fabric over time. According to Gallasch, ecological thinking is “what we desperately need for the arts.” It enables us to “defeat the fragmentary and utilitarian view of the arts that dominates, to make connections, to establish overviews of the arts that can be shared and debated” (Gallasch NP). John Baylis took up these issues in "Mapping Queensland Theatre" (2009), an Arts Queensland-funded survey designed to map practices in Brisbane and in Queensland more broadly, and to provide a platform to support future policy-making. In this paper, we propose a new approach to mapping Brisbane’s and Queensland’s theatre that extends Baylis’ ‘value chain’ into a ‘value ecology’ that provides a more textured picture of players, patterns, relationships and activity levels in local performing arts.
Resumo:
This paper describes a capacity building process undertaken within the HIV/AIDS prevention project of the Adventist Development and Relief Agency (ADRA) in the Solomon Islands. ADRA HIV/AIDS has recently reoriented its project structure, moving beyond its awareness raising approach to incorporate health promotion frameworks, theories, strategies and assumptions. These have been used to inform project practice in project planning, delivery and evaluation. This paper shares what has worked and not worked in the capacity building process, including a project evaluation of the initial HIV/AIDS awareness raising project and the application of a number of capacity building strategies, including utilising a volunteer Australian Youth Ambassador for Development (AYAD) funded by the Australian Agency for International Development (AusAID). Existing and new projects are outlined. The underlying theme is that any capacity building exercise must include structural support (e.g. management, national frameworks) to ensure the incorporation of new initiatives and approaches. With time this enables ownership by counterparts and external partnerships to develop. The presence of an AYAD volunteer has been an effective strategy to achieve this. Reflections from the evaluators, the AYAD volunteer and the HIV/AIDS team are included.
Resumo:
STUDY QUESTION: What is the self-reported use of in vitro fertilization (IVF) and ovulation induction (OI) in comparison with insurance claims by Australian women aged 28–36 years? SUMMARY ANSWER: The self-reported use of IVF is quite likely to be valid; however, the use of OI is less well reported. WHAT IS KNOWN AND WHAT THIS PAPER ADDS: Population-based research often relies on the self-reported use of IVF and OI because access to medical records can be difficult and the data need to include sufficient personal identifying information for linkage to other data sources. There have been few attempts to explore the reliability of the self-reported use of IVF and OI using the linkage to medical insurance claims for either treatment. STUDY DESIGN: This prospective, population-based, longitudinal study included the cohort of women born during 1973–1978 and participating in the Australian Longitudinal Study on Women's Health (ALSWH) (n = 14247). From 1996 to 2009, participants were surveyed up to five times. PARTICIPANTS AND SETTING: Participants self-reported their use of IVF or OI in two mailed surveys when aged 28–33 and 31–36 years (n = 7280), respectively. This study links self-report survey responses and claims for treatment or medication from the universal national health insurance scheme (i.e. Medicare Australia). MAIN RESULTS AND THE ROLE OF CHANCE: Comparisons between self-reports and claims data were undertaken for all women consenting to the linkage (n = 3375). The self-reported use of IVF was compared with claims for OI for IVF (Kappa, K = 0.83), oocyte collection (K = 0.82), sperm preparation (K = 0.83), intracytoplasmic sperm injection (K = 0.40), fresh embryo transfers (K = 0.82), frozen embryo transfers (K = 0.64) and OI for IVF medication (K = 0.17). The self-reported use of OI was compared with ovulation monitoring (K = 0.52) and OI medication (K = 0.71). BIAS, CONFOUNDING AND OTHER REASONS FOR CAUTION: There is a possibility of selection bias due to the inclusion criteria for participants in this study: (1) completion of the last two surveys in a series of five and (2) consent to the linkage of their responses with Medicare data. GENERALIZABILITY TO OTHER POPULATIONS: The results are relevant to questionnaire-based research studies with infertile women in developed countries. STUDY FUNDING/COMPETING INTEREST(S): ALSWH is funded by the Australian Government Department of Health and Ageing. This research is funded by a National Health and Medical Research Council Centre of Research Excellence grant.
Resumo:
Open Educational Resources (OER) are teaching, learning and research materials that have been released under an open licence that permits online access and re-use by others. The 2012 Paris OER Declaration encourages the open licensing of educational materials produced with public funds. Digital data and data sets produced as a result of scientific and non-scientific research are an increasingly important category of educational materials. This paper discusses the legal challenges presented when publicly funded research data is made available as OER, arising from intellectual property rights, confidentiality and information privacy laws, and the lack of a legal duty to ensure data quality. If these legal challenges are not understood, addressed and effectively managed, they may impede and restrict access to and re-use of research data. This paper identifies some of the legal challenges that need to be addressed and describes 10 proposed best practices which are recommended for adoption to so that publicly funded research data can be made available for access and re-use as OER.
Resumo:
This paper presents a summary of the key findings of the TTF TPACK Survey developed and administered for the Teaching the Teachers for the Future (TTF) Project implemented in 2011. The TTF Project, funded by an Australian Government ICT Innovation Fund grant, involved all 39 Australian Higher Education Institutions which provide initial teacher education. TTF data collections were undertaken at the end of Semester 1 (T1) and at the end of Semester 2 (T2) in 2011. A total of 12881 participants completed the first survey (T1) and 5809 participants completed the second survey (T2). Groups of like-named items from the T1 survey were subject to a battery of complementary data analysis techniques. The psychometric properties of the four scales: Confidence - teacher items; Usefulness - teacher items; Confidence - student items; Usefulness- student items, were confirmed both at T1 and T2. Among the key findings summarised, at the national level, the scale: Confidence to use ICT as a teacher showed measurable growth across the whole scale from T1 to T2, and the scale: Confidence to facilitate student use of ICT also showed measurable growth across the whole scale from T1 to T2. Additional key TTF TPACK Survey findings are summarised.
Resumo:
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Resumo:
Process modelling – the design and use of graphical documentations of an organisation’s business processes – is a key method to document and use information about business processes in organisational projects. Still, despite current interest in process modelling, this area of study still faces essential challenges. One of the key unanswered questions concerns the impact of process modelling in organisational practice. Process modelling initiatives call for tangible results in the form of returns on the substantial investments that organisations undertake to achieve improved processes. This study explores the impact of process model use on end-users and its contribution to organisational success. We posit that the use of conceptual models creates impact in organisational process teams. We also report on a set of case studies in which we explore tentative evidence for the development of impact of process model use. The results of this work provide a better understanding of process modelling impact from information practices and also lead to insights into how organisations should conduct process modelling initiatives in order to achieve an optimum return on their investment.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
The work by graduate teachers in this volume represent intentional design of learning experiences using technology for Early Childhood settings. They were given a two-part design task: a sequence of lessons organised around a themed project; and the collection of resources to support such activities. The project had to be constructive in nature where the children built objects and representations that were meaningful to them. The excellent works presented here offer a range of approaches that would be suitable in a variety of contexts. Because they are reasoned, these projects offer flexibility in implementation along with confidence that they would be effective.
Resumo:
Quality and equity issues as they relate to assessment practices and policy are becoming increasingly important as Australia introduces a national curriculum and achievement standards. In a context of high-stakes accountability, concerns regarding equity and quality have important implications for teachers‘ practice for the improvement of learner outcomes. This article is based on three research projects that were conducted over the past four years and were funded by the Australian Federal Government. The research focus, emergent questions, the educational contexts, and the rationale for the studies are discussed prior to the presentation of the analysis of the research findings and the implications for teachers‘ practice and policy reform.