997 resultados para Cost Inefficiency


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this project was to evaluate the cost-effectiveness of hand hygiene interventions in resource-limited hospital settings. Using data from north-east Thailand, the research found that such interventions are likely to be very cost-effective in intensive care unit settings as a result of reduced incidence of methicillin-resistant Staphylococcus aureus bloodstream infection alone. This study also found evidence showing that the World Health Organization's (WHO) multimodal intervention is effective and when adding either goal-setting, reward incentives, or accountability strategies to the WHO intervention, compliance could be further improved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A roll-to-roll compatible, high throughput process is reported for the production of highly conductive, transparent planar electrode comprising an interwoven network of silver nanowires and single walled carbon nanotubes imbedded into poly(3,4-ethylenedioxythiophene):polystyrene sulfonate (PEDOT:PSS). The planar electrode has a sheet resistance of between 4 and 7 Ω □−1 and a transmission of >86% between 800 and 400 nm with a figure of merit of between 344 and 400 Ω−1. The nanocomposite electrode is highly flexible and retains a low sheet resistance after bending at a radius of 5 mm for up to 500 times without loss. Organic photovoltaic devices containing the planar nanocomposite electrodes had efficiencies of ∼90% of control devices that used indium tin oxide as the transparent conducting electrode.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an unmanned aircraft system (UAS) that uses a probabilistic model for autonomous front-on environmental sensing or photography of a target. The system is based on low-cost and readily-available sensor systems in dynamic environments and with the general intent of improving the capabilities of dynamic waypoint-based navigation systems for a low-cost UAS. The behavioural dynamics of target movement for the design of a Kalman filter and Markov model-based prediction algorithm are included. Geometrical concepts and the Haversine formula are applied to the maximum likelihood case in order to make a prediction regarding a future state of a target, thus delivering a new waypoint for autonomous navigation. The results of the application to aerial filming with low-cost UAS are presented, achieving the desired goal of maintained front-on perspective without significant constraint to the route or pace of target movement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past few years, the virtual machine (VM) placement problem has been studied intensively and many algorithms for the VM placement problem have been proposed. However, those proposed VM placement algorithms have not been widely used in today's cloud data centers as they do not consider the migration cost from current VM placement to the new optimal VM placement. As a result, the gain from optimizing VM placement may be less than the loss of the migration cost from current VM placement to the new VM placement. To address this issue, this paper presents a penalty-based genetic algorithm (GA) for the VM placement problem that considers the migration cost in addition to the energy-consumption of the new VM placement and the total inter-VM traffic flow in the new VM placement. The GA has been implemented and evaluated by experiments, and the experimental results show that the GA outperforms two well known algorithms for the VM placement problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cost estimating has been acknowledged as a crucial component of construction projects. Depending on available information and project requirements, cost estimates evolve in tandem with project lifecycle stages; conceptualisation, design development, execution and facility management. The premium placed on the accuracy of cost estimates is crucial to producing project tenders and eventually in budget management. Notwithstanding the initial slow pace of its adoption, Building Information Modelling (BIM) has successfully addressed a number of challenges previously characteristic of traditional approaches in the AEC, including poor communication, the prevalence of islands of information and frequent reworks. Therefore, it is conceivable that BIM can be leveraged to address specific shortcomings of cost estimation. The impetus for leveraging BIM models for accurate cost estimation is to align budgeted and actual cost. This paper hypothesises that the accuracy of BIM-based estimation, as more efficient, process-mirrors of traditional cost estimation methods, can be enhanced by simulating traditional cost estimation factors variables. Through literature reviews and preliminary expert interviews, this paper explores the factors that could potentially lead to more accurate cost estimates for construction projects. The findings show numerous factors that affect the cost estimates ranging from project information and its characteristic, project team, clients, contractual matters, and other external influences. This paper will make a particular contribution to the early phase of BIM-based project estimation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Individuals with limb amputation fitted with conventional socket-suspended prostheses often experience socket-related discomfort leading to a significant decrease in quality of life. Bone-anchored prostheses are increasingly acknowledged as viable alternative method of attachment of artificial limb. In this case, the prosthesis is attached directly to the residual skeleton through a percutaneous fixation. To date, a few osseointegration fixations are commercially available. Several devices are at different stages of development particularly in Europe and the US. [1-15] Clearly, surgical procedures are currently blooming worldwide. Indeed, Australia and Queensland, in particular, have one of the fastest growing populations. Previous studies involving either screw-type implants or press-fit fixations for bone-anchorage have focused on biomechanics aspects as well as the clinical benefits and safety of the procedure. In principle, bone-anchored prostheses should eliminate lifetime expenses associated with sockets and, consequently, potentially alleviate the financial burden of amputation for governmental organizations. Unfortunately, publications focusing on cost-effectiveness are sparse. In fact, only one study published by Haggstrom et al (2012), reported that “despite significantly fewer visits for prosthetic service the annual mean costs for osseointegrated prostheses were comparable with socket-suspended prostheses”. Consequently, governmental organizations such as Queensland Artificial Limb Services (QALS) are facing a number of challenges while adjusting financial assistance schemes that should be fair and equitable to their clients fitted with bone-anchored prostheses. Clearly, more scientific evidence extracted from governmental databases is needed to further consolidate the analyses of financial burden associated with both methods of attachment (i.e., conventional sockets prostheses, bone-anchored prostheses). The purpose of the presentation will be to share the current outcomes of a cost-analysis study lead by QALS. The specific objectives will be: • To outline methodological avenues to assess the cost-effectiveness of bone-anchored prostheses compared to conventional sockets prostheses, • To highlight the potential obstacles and limitations in cost-effectiveness analyses of bone-anchored prostheses, • To present cohort results of a cost-effectiveness (QALY vs cost) including the determination of fair Incremental cost-effectiveness Ratios (ICER) as well as cost-benefit analysis focusing on the comparing costs and key outcome indicators (e.g., QTFA, TUG, 6MWT, activities of daily living) over QALS funding cycles for both methods of attachment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND The workgroup of Traffic Psychology is concerned with the social, behavioral, and perceptual aspects that are associated with use and non-use of bicycle helmets, in their various forms and under various cycling conditions. OBJECTIVES The objectives of WG2 are to (1) share current knowledge among the people already working in the field, (2) suggest new ideas for research on and evaluation of the design of bicycle helmets, and (3) discuss options for funding of such research within the individual frameworks of the participants. Areas for research include 3.1. The patterns of use of helmets among different users: children, adults, and sports enthusiasts. 3.2. The use of helmets in different environments: rural roads, urban streets, and bike trails. 3.3. Concerns bicyclists have relative to their safety and convenience and the perceived impact of using helmets on comfort and convenience. 3.4. The benefit of helmets for enhancing visibility, and how variations in helmet design and colors affect daytime, nighttime, and dusktime visibility. 3.5. The role of helmets in the acceptance of city-wide pickup-and-drop-off bicycles. 3.6. The impact of helmets on visual search behaviour of bicyclists.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

RFID is an important technology that can be used to create the ubiquitous society. But an RFID system uses open radio frequency signal to transfer information and this leads to pose many serious threats to its privacy and security. In general, the computing and storage resources in an RFID tag are very limited and this makes it difficult to solve its secure and private problems, especially for low-cost RFID tags. In order to ensure the security and privacy of low-cost RFID systems we propose a lightweight authentication protocol based on Hash function. This protocol can ensure forward security and prevent information leakage, location tracing, eavesdropping, replay attack and spoofing. This protocol completes the strong authentication of the reader to the tag by twice authenticating and it only transfers part information of the encrypted tag’s identifier for each session so it is difficult for an adversary to intercept the whole identifier of a tag. This protocol is simple and it takes less computing and storage resources, it is very suitable to some low-cost RFID systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Alterations in energy expenditure during activity post head injury has not been investigated due primarily to the difficulty of measurement. Objective: The aim of this study was to compare energy expenditure during activity and body composition of children following acquired brain injury (ABI) with data from a group of normal controls. Design: Energy expenditure was measured using the Cosmed K4b2 in a group of 15 children with ABI and a group of 67 normal children during rest and when walking and running. Mean number of steps taken per 3 min run was also recorded and body composition was measured. Results: The energy expended during walking was not significantly different between both groups. A significant difference was found between the two groups in the energy expended during running and also for the number of steps taken as children with ABI took significantly less steps than the normal controls during a 3 min run. Conclusions: Children with ABI exert more energy per activity than healthy controls when controlled for velocity or distance. However, they expend less energy to walk and run when they are free to choose their own desirable, comfortable pace than normal controls. © 2003 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective. To assess the cost-effectiveness of bone density screening programmes for osteoporosis. Study design. Using published and locally available data regarding fracture rates and treatment costs, the overall costs per fracture prevented, cost per quality of life year (QALY) saved and cost per year of life gained were estimated for different bone density screening and osteoporosis treatment programmes. Main outcome measures. Cost per fracture prevented, cost per QALY saved, and cost per year of life gained. Results. In women over the age of 50 years, the costs per fracture prevented of treating all women with hormone replacement therapy, or treating only if osteoporosis is demonstrated on bone density screening were £32,594 or £23,867 respectively. For alendronate therapy for the same groups, the costs were £171,067 and £14,067 respectively. Once the background rate of treatment with alendronate reaches 18%, bone density screening becomes cost-saving. Costs estimates per QALY saved ranged from £1,514 to £39,076 for osteoporosis treatment with alendronate following bone density screening. Conclusions. For relatively expensive medications such as alendronate, treatment programmes with prior bone density screening are far more cost effective than those without, and in some circumstances become cost-saving. Costs per QALY of life saved and per year of life gained for osteoporosis treatment with prior bone density screening compare favourably with treatment of hypertension and hypercholesterolemia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Estimating the economic burden of injuries is important for setting priorities, allocating scarce health resources and planning cost-effective prevention activities. As a metric of burden, costs account for multiple injury consequences—death, severity, disability, body region, nature of injury—in a single unit of measurement. In a 1989 landmark report to the US Congress, Rice et al1 estimated the lifetime costs of injuries in the USA in 1985. By 2000, the epidemiology and burden of injuries had changed enough that the US Congress mandated an update, resulting in a book on the incidence and economic burden of injury in the USA.2 To make these findings more accessible to the larger realm of scientists and practitioners and to provide a template for conducting the same economic burden analyses in other countries and settings, a summary3 was published in Injury Prevention. Corso et al reported that, between 1985 and 2000, injury rates declined roughly 15%. The estimated lifetime cost of these injuries declined 20%, totalling US$406 billion, including US$80 billion in medical costs and US$326 billion in lost productivity. While incidence reflects problem size, the relative burden of injury is better expressed using costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to examine the changes of energy cost during a high-heeled continuous jogging.Thirteen healthy female volunteers jointed in this study with heel height of the shoes varied from 1, 4.5 and 7 cm, respectively. Each subjects jogged on the treadmill with K4b2 portable gas analysis system. The results of this study showed that ventilnation, relative oxygen consumption and energy expenditure increased with the increase of heel height and these values shows significantly larger when the heel height reached to 7 cm. Present study suggest that wearing high heel shoes jogging could directly increase energy consumption, causing neuromuscular fatigue.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nahhas, Wolfe, and Chen (2002, Biometrics 58, 964-971) considered optimal set size for ranked set sampling (RSS) with fixed operational costs. This framework can be very useful in practice to determine whether RSS is beneficial and to obtain the optimal set size that minimizes the variance of the population estimator for a fixed total cost. In this article, we propose a scheme of general RSS in which more than one observation can be taken from each ranked set. This is shown to be more cost-effective in some cases when the cost of ranking is not so small. We demonstrate using the example in Nahhas, Wolfe, and Chen (2002, Biometrics 58, 964-971), by taking two or more observations from one set even with the optimal set size from the RSS design can be more beneficial.