987 resultados para Authority Control procedures
Resumo:
Sample preparation procedures for AMS measurements of 129I and 127I in environmental materials and some methodological aspects of quality assurance are discussed. Measurements from analyses of some pre-nuclear soil and thyroid gland samples and of a systematic investigation of natural waters in Lower Saxony, Germany, are described. Although the up-to-now lowest 129I/127I ratios in soils and thyroid glands were observed, they are still suspect to contamination since they are significantly higher than the pre-nuclear equilibrium ratio in the marine hydrosphere. A survey on all available 129I/127I isotopic ratios in precipitation shows a dramatic increase until the middle of the 1980s and a stabilization since 1987 at high isotopic ratios of about (3.6–8.3)×10−7. In surface waters, ratios of (57–380)×10−10 are measured while shallow ground waters show with ratios of (1.3–200)×10−10 significantly lower values with a much larger spread. The data for 129I in soils and in precipitation are used to estimate pre-nuclear and modern 129I deposition densities.
Resumo:
El tema del control del aparato a través del cual actúa el Estado, también llamado administración estatal, adquiere gran relevancia debido a la evolución del concepto del control, que ya no se restringe a la simple detección de errores y corrección de desviaciones del pasado, sino que aparece como un valioso auxiliar de la toma de decisiones capaz de reorientar acciones y metas hacia lo que es mejor para las organizaciones y sus integrantes. En tal sentido, verificar la exactitud con que se cumplen las decisiones de gobierno, evitar desviaciones, redefinir metas a alcanzar y cursos de acción a transitar, hacen del control una función importante que es necesario estudiar, comprender, explicitar. El trabajo indaga en los sistemas y modalidades del control público en la Nación, precisando las características de la administración estatal y de los órganos encargados de su control.
Resumo:
Knowing the size of the terms to which program variables are bound at run-time in logic programs is required in a class of optimizations which includes granularity control and recursion elimination. Such size is difficult to even approximate at compile time and is thus generally computed at run-time by using (possibly predeñned) predicates which traverse the terms involved. We propose a technique which has the potential of performing this computation much more efficiently. The technique is based on ñnding program procedures which are called before those in which knowledge regarding term sizes is needed and which traverse the terms whose size is to be determined, and transforming such procedures so that they compute term sizes "on the fly". We present a systematic way of determining whether a given program can be transformed in order to compute a given term size at a given program point without additional term traversal. Also, if several such transformations are possible our approach allows ñnding minimal transformations under certain criteria. We also discuss the advantages and applications of our technique (specifically in the task of granularity control) and present some performance results.
Resumo:
Strict technical quality assurance procedures are essential for PV plant bankability. When large-scale PV plants are concerned, this is typically accomplished in three consecutive phases: an energy yield forecast, that is performed at the beginning of the project and is typically accomplished by means of a simulation exercise performed with dedicated software; a reception test campaign, that is performed at the end of the commissioning and consists of a set of tests for determining the efficiency and the reliability of the PV plant devices; and a performance analysis of the first years of operation, that consists in comparing the real energy production with the one calculated from the recorded operating conditions and taking into account the maintenance records. In the last six years, IES-UPM has offered both indoor and on-site quality control campaigns for more than 60 PV plants, with an accumulated power of more than 300 MW, in close contact with Engineering, Procurement and Construction Contractors and financial entities. This paper presents the lessons learned from such experience.
Resumo:
Este proyecto consiste en el estudio y dimensionado inicial del sistema de potencia de un satélite de observación, que sirva de ayuda a otros sistemas de mayor precisión a la hora de detectar posibles terremotos y actividad volcánica mediante el análisis de señales electromagnéticas presentes en la ionosfera. Para ello el satélite incorpora, entre otros elementos sensores eléctricos, un analizador de plasma, y un detector de partículas. Con esta instrumentación se pretenden detectar los cambios que se producen en el campo electromagnético terrestre como consecuencia del movimiento de las placas tectónicas, y descubrir así las posibles anomalías que preceden a un seísmo. Para no sobrepasar el presupuesto con el que se ha ideado el proyecto se utilizarán sistemas que permitan la lectura de datos de la forma más simple, pudiendo ocurrir que los datos recogidos no se transmitan al control de Tierra en tiempo real, impidiendo a los científicos analizar los datos recogidos hasta unos días después, de ahí que este satélite experimental deba emplearse, en principio, como apoyo a programas de detención de terremotos más sofisticados y con mayores medios técnicos. Evidentemente, con este sistema también se podrán recoger datos tras los seísmos y examinarlos posteriormente. La órbita del satélite será una órbita LEO (Low Earth Orbit) de una altitud aproximada de 670 Km, estimándose el tiempo de vida del satélite en 5 años. Intentando emplear la mayor parte de los recursos económicos en el equipamiento científico, la estructura será la más simple posible, esto es, un paralelepípedo de dimensiones compactas con un peso aproximado de 185 kg, contando con paneles solares desplegables y en su interior con baterías que proporcionarán potencia al satélite durante la fase de lanzamiento y en momentos concretos.
Resumo:
La emisión de polvo por efecto del viento desde depósitos de residuos mineros o industriales y el paso de vehículos en vías no pavimentadas, es un problema que afecta las actividades productivas; el ambiente y la salud de las personas que permanecen en el área contaminada. En Chile, en los últimos años la sensibilidad social y las exigencias ambientales han aumentado, así como la oferta de diferentes supresores y tecnologías de aplicación. Se han revisado las causas que provocan emisión de polvo y las tecnologías disponibles en Chile para la supresión de polvo, además de las metodologías y normativa para evaluar el desempeño de los materiales tratados con diferentes supresores. En algunos casos no es posible comparar propiedades de desempeño, como durabilidad, dosis a aplicar y frecuencia de las aplicaciones, entre otros aspectos. Los procedimientos descritos en la norma NCh3266-2012 permiten evaluar la erosión eólica en depósitos de residuos, sitios eriazos y caminos no pavimentados, entre otros, junto con evaluar el desempeño de diferentes tipos de supresores de polvo a partir de datos objetivos comparables. Esto permite seleccionar el supresor más adecuado, mejorar la eficiencia de los tratamientos, optimizar los costos y mejorar los procesos productivos. Palabras clave: Erosión-eólica, supresor de polvo, residuos-mineros, caminos-no pavimentados. Dust emissions by wind effect from mining deposits or industrial waste and passing vehicles on unpaved roads, is a problem that affects the productive activities; the environment and the health of those who remain in the contaminated area. The social sensitivity and environmental requirements on this issue in Chile have increased, as well as offering different suppressors and application technologies. Have been reviewed the causes of dust emission and technologies available in Chile for dust suppression, plus methodologies and standards for assessing the performance of the treated materials with different suppressors. In some cases it is not possible to compare performance properties such as durability, application dose and frequency of applications, among others aspects. The procedures described in the NCh 3266-2012 standard allows the assessment of wind erosion in waste deposits, vacant lots and unpaved roads, among others, along with evaluating the performance of different types of dust suppressants from comparable objective data. This allows selecting the most suitable suppressor, improve efficiency of treatments, optimize costs and improve production processes. Keywords: Wind-erosion, dust-suppressor, mining-waste, unpavedroads
Resumo:
A solution for the problem of reusability of software system for batch production systems is proposed. It is based on ISA S88 standard that prescribes the abstraction of elements in the manufacturing system that is equipment, processes and procedures abstraction, required to make a product batch. An easy to apply data scheme, compatible with the standard, is developed for management of production information. In addition to flexibility provided by the S88 standard, software system reusability requires a solution supporting manufacturing equipment reconfigurability. Toward this end a coupling mechanism is developed. A software tool, including these solutions, was developed and validated at laboratory level, using product manufacturing information of an actual plant.
Resumo:
Peer reviewed
Resumo:
Acknowledgments This research was funded by NERC Grants NE/J01396X/1; NE/E006434/1 to XL. Y. M. was funded by a Marie Curie FP7-PEOPLE-2011-IEF 300288. We profusely thank the Scottish Mink Initiative, staff, funders and multiple mink volunteers for the continued effort, samples and enthusiasm. The Scottish Water Vole Conservation Project was funded by The Tubney Charitable trust, Scottish Natural Heritage, the Cairngorms National Park Authority and the People’s Trust for Endangered Species. We also thank the Associate Editor and two anonymous referees for their thoughtful reviews.
Resumo:
The countermanding paradigm was designed to investigate the ability to cancel a prepotent response when a stop signal is presented and allows estimation of the stop signal response time (SSRT), an otherwise unobservable behaviour. Humans exhibit adaptive control of behaviour in the countermanding task, proactively lengthening response time (RT) in expectation of stopping and reactively lengthening RT following stop trials or errors. Human performance changes throughout the lifespan, with longer RT, SSRT and greater emphasis on post-error slowing reported for older compared to younger adults. Inhibition in the task has generally been improved by drugs that increase extracellular norepinephrine. The current thesis examined a novel choice response countermanding task in rats to explore whether rodent countermanding performance is a suitable model for the study of adaptive control of behaviour, lifespan changes in behavioural control and the role of neurotransmitters in these behaviours. Rats reactively adjusted RT in the countermanding task, shortening RT after consecutive correct go trials and lengthening RT following non-cancelled, but not cancelled stop trials, in sessions with a 10 s, but not a 1 s post-error timeout interval. Rats proactively lengthened RT in countermanding task sessions compared to go trial-only sessions. Together, these findings suggest that rats strategically lengthened RT in the countermanding task to improve accuracy and avoid longer, unrewarded timeout intervals. Next, rats exhibited longer RT and relatively conserved post-error slowing, but no significant change in SSRT when tested at 12, compared to 7 months of age, suggesting that rats exhibit changes in countermanding task performance with aging similar to those observed in humans. Finally, acute administration of yohimbine (1.25, 2.5 mg/kg) and d-amphetamine (0.25, 0.5 mg/kg), which putatively increase extracellular norepinephrine and dopamine respectively, resulted in RT shortening, baseline-dependent effects on SSRT, and attenuated adaptive RT adjustments in rats in the case of d-amphetamine. These findings suggest that dopamine and norepinephrine encouraged motivated, reward-seeking behaviour and supported inhibitory control in an inverted-U-like fashion. Taken together, these observations validate the rat countermanding task for further study of the neural correlates and neurotransmitters mediating adaptive control of behaviour and lifespan changes in behavioural control.
Resumo:
The Development Permit System has been introduce with minimal directives for establishing a decision making process. This is in opposition to the long established process for minor variances and suggests that the Development Permit System does not necessarily incorporate all of Ontario’s fundamental planning principles. From this concept, the study aimed to identify how minor variances are incorporated into the Development Permit System. In order to examine this topic, the research was based around the following research questions: • How are ‘minor variance’ applications processed within the DPS? • To what extent do the four tests of a minor variance influence the outcomes of lower level applications in the DPS approval process? A case study approach was used for this research. The single-case design employed both qualitative and quantitative research methods including a review of academic literature, court cases, and official documents, as well as a content analysis of Class 1, 1A, and 2 Development Permit application files from the Town of Carleton Place that were decided between 2011 and 2015. Upon the completion of the content analysis, it was found that minor variance issues were most commonly assigned to Class 1 applications. Planning staff generally met approval timelines and embraced their delegated approval authority, readily attaching conditions to applications in order to mitigate off-site impacts. While staff met the regulatory requirements of the DPS, ‘minor variance’ applications were largely decided on impact alone, demonstrating that the principles established by the four tests, the defining quality of the minor variance approval process, had not transferred to the Development Permit System. Alternatively, there was some evidence that the development community has not fully adjusted to the requirements of the new approvals process, as some applications were supported using a rationale containing the four tests. Subsequently, a set of four recommendations were offered which reflect the main themes established by the findings. The first two recommendations are directed towards the Province, the third to municipalities and the fourth to developers and planning consultants: 1) Amend Ontario Regulation 608/06 so that provisions under Section 4(3)(e) fall under Section 4(2). 2) Change the rhetoric from “combining elements of minor variances” to “replacing minor variances”. 3) Establish clear evaluation criteria. 4) Understand the evaluative criteria of the municipality in which you are working.
Resumo:
We investigated whether children’s inhibitory control is associated with their ability to produce irregular verb forms as well as learn from corrective feedback following their use of an over-regularized form. Forty-eight 3.5 to 4.5 year old children were tested on the irregular past tense and provided with adult corrective input via models of correct use or recasts of errors following ungrammatical responses. Inhibitory control was assessed with a three-item battery of tasks that required suppressing a prepotent response in favor of a non-canonical one. Results showed that inhibitory control was predictive of children’s initial production of irregular forms and not associated with their post-feedback production of irregulars. These findings show that children’s executive functioning skills may be a rate-limiting factor on their ability to produce correct forms, but might not interact with their ability to learn from input in this domain. Findings are discussed in terms of current theories of past-tense acquisition and learning from input more broadly.
Resumo:
The electric vehicle (EV) market has seen a rapid growth in the recent past. With an increase in the number of electric vehicles on road, there is an increase in the number of high capacity battery banks interfacing the grid. The battery bank of an EV, besides being the fuel tank, is also a huge energy storage unit. Presently, it is used only when the vehicle is being driven and remains idle for rest of the time, rendering it underutilized. Whereas on the other hand, there is a need of large energy storage units in the grid to filter out the fluctuations of supply and demand during a day. EVs can help bridge this gap. The EV battery bank can be used to store the excess energy from the grid to vehicle (G2V) or supply stored energy from the vehicle to grid (V2G ), when required. To let power flow happen, in both directions, a bidirectional AC-DC converter is required. This thesis concentrates on the bidirectional AC-DC converters which have a control on power flow in all four quadrants for the application of EV battery interfacing with the grid. This thesis presents a bidirectional interleaved full bridge converter topology. This helps in increasing the power processing and current handling capability of the converter which makes it suitable for the purpose of EVs. Further, the benefit of using the interleaved topology is that it increases the power density of the converter. This ensures optimization of space usage with the same power handling capacity. The proposed interleaved converter consists of two full bridges. The corresponding gate pulses of each switch, in one cell, are phase shifted by 180 degrees from those of the other cell. The proposed converter control is based on the one-cycle controller. To meet the challenge of new requirements of reactive power handling capabilities for grid connected converters, posed by the utilities, the controller is modified to make it suitable to process the reactive power. A fictitious current derived from the grid voltage is introduced in the controller, which controls the converter performance. The current references are generated using the second order generalized integrators (SOGI) and phase locked loop (PLL). A digital implementation of the proposed control ii scheme is developed and implemented using DSP hardware. The simulated and experimental results, based on the converter topology and control technique discussed here, are presented to show the performance of the proposed theory.
Resumo:
One of the most important developments in EC competition policy during 2006 was the Court of First Instance’s (CFI) Impala v. Commission judgment annulling the European Commission’s approval of the merger between the music units of Sony and Bertelsmann. It harshly criticized the Commission’s Decision because it found that the evidence relied on was not capable of substantiating the conclusion. This was the first time that a merger decision was annulled for not meeting the requisite legal standard for authorizing the merger. Consequently, the CFI raised fundamental questions about the standard of proof incumbent on the Commission in its merger review procedures. On July 10, 2008, the European Court of Justice overturned Impala, yet it did not resolve the fundamental question underlying the judicial review of the Sony BMG Decision; does the Commission have the necessary resources and expertise to meet the Community Court’s standard of proof? This paper addresses the wider implications of the Sony BMG saga for the Commission’s future handling of complex merger investigations. It argues that the Commission may have set itself an impossible precedent in the second approval of the merger. While the Commission has made a substantial attempt to meet the high standard of proof imposed by the Community Courts, it is doubtful that it will be able to jump the fence again in a similar fashion under normal procedural circumstances.
Resumo:
BACKGROUND Ventricular tachycardia (VT) refractory to antiarrhythmic drugs and standard percutaneous catheter ablation techniques portends a poor prognosis. We characterized the reasons for ablation failure and describe alternative interventional procedures in this high-risk group. METHODS AND RESULTS Sixty-seven patients with VT refractory to 4±2 antiarrhythmic drugs and 2±1 previous endocardial/epicardial catheter ablation attempts underwent transcoronary ethanol ablation, surgical epicardial window (Epi-window), or surgical cryoablation (OR-Cryo; age, 62±11 years; VT storm in 52%). Failure of endo/epicardial ablation attempts was because of VT of intramural origin (35 patients), nonendocardial origin with prohibitive epicardial access because of pericardial adhesions (16), and anatomic barriers to ablation (8). In 8 patients, VT was of nonendocardial origin with a coexisting condition also requiring cardiac surgery. Transcoronary ethanol ablation alone was attempted in 37 patients, OR-Cryo alone in 21 patients, and a combination of transcoronary ethanol ablation and OR-Cryo (5 patients), or transcoronary ethanol ablation and Epi-window (4 patients), in the remainder. Overall, alternative interventional procedures abolished ≥1 inducible VT and terminated storm in 69% and 74% of patients, respectively, although 25% of patients had at least 1 complication. By 6 months post procedures, there was a significant reduction in defibrillator shocks (from a median of 8 per month to 1; P<0.001) and antiarrhythmic drug requirement although 55% of patients had at least 1 VT recurrence, and mortality was 17%. CONCLUSIONS A collaborative strategy of alternative interventional procedures offers the possibility of achieving arrhythmia control in high-risk patients with VT that is otherwise uncontrollable with antiarrhythmic drugs and standard percutaneous catheter ablation techniques.