967 resultados para 2-benzo-3
Resumo:
Gestión del conocimiento
Resumo:
The Badger newspaper gets a new look in this fall issue.
Resumo:
Investigations of 2-alkyl-3-methoxypyrazines (2-isopropyl-3-methoxypyra2ine, 2- secbutyl-3-methoxypyrazine and 2-isobutyl-3-niethoxypyrazine) in ladybug species {Coleoptera: Coccinellidae) and wine samples have been conducted. Headspace sampling coupled with gas chromatography-mass spectrometry was used to determine amounts of 2-alkyl-3-methoxypyra2ines in the ladybug species. Hippodamia convergens had the highest amount of alkybnethoxypyrazines, followed by Harmoma axyridis and the least in Coccinella septempunctata. Using a solvent extraction method, the precoccinelline alkaloid was found present in Hippodamia convergens and Coccinella septempunctata but not Harmonia axyridis. Steam distillation followed by a soHd phase extraction method as a sample preparation technique, enhanced detection while the isotope dilution method afforded accurate quantitation of the alkyknethoxypyrazines in the wine samples. Both ladybug-tainted and commercial wine samples were found to contain the 2- alkyl-3-methoxypyrazines. Wine samples prepared in 2001 generally contained higher levels than the corresponding 2003 samples. Levels of the 2-alkyl-3-methoxypyrazines found in the commercial wines ranged from a minimum value of 6 ng/L to 260 ±10 ng/L. Analyses revealed that for both ladybug species and wine samples, the 2- isopropyl-3-methoxypyrazine had the highest concentration, followed by 2-isobutyl- 3-methoxypyrazine and the least being the 2-secbutyl-3-methoxypyrazine. Possible contamination of the wine samples by ladybugs is thoroughly discussed. Furthermore, attempts to remove or reduce the levels of the alkylmethoxypyrazines with molecularly imprinted polymers from wine samples are presented in detail.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Sept. 1854, signed by S.D. Woodruff, Oct. 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Oct. 31, 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Oct. 1854, signed by S.D. Woodruff, Nov. 1854.
Resumo:
Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month ending Dec. 1, 1854, signed by S.D. Woodruff, Jan. 1855.
Resumo:
Scrap of paper that has been burned almost completely. Only the header of the document is intact. It is an estimate of work done by Messrs. Brown and McDonell, contractors on sections 1, 2 and 3 ending at St. Catharines for the months of April and May 1855.