784 resultados para top management teams
Resumo:
Green teams are frequently considered in the state-of-the-art literature as an essential factor for companies aiming to implement and improve environmental management approaches and practices. However, most of the available literature on green teams is conceptual and theoretical by nature. Therefore, the main purpose of this article is to evaluate the main characteristics of green teams in Brazilian companies and to analyse the relationships between green teams and the maturity level of environmental management in those companies. Based on a conceptual background on corporate environmental management and green teams, a research was done in two complementary phases: a survey of 94 companies with ISO 14001 certification; and a multiple case study of four industrial companies. Survey results suggest that 82% of the studied companies have cross-functional green teams, i.e. involving various companies' departments; and 65% have functional green teams, i.e. individual department teams. The results of the case study suggest that the use of green teams is an instrument to the greening of companies with ISO 14001 in Brazil. The company with the most proactive and advanced environmental management is the same company which uses green teams more intensely. Green teams are especially necessary for implementing more technical environmental management practices, e.g. Life Cycle Assessment. Since this is one of the first studies analysing green teams, the results presented can be useful for companies and public policies aiming to implementation of environmental initiatives. © 2012 Elsevier Ltd. All rights reserved.
Resumo:
This paper reports a learning experience related to the acquisition of project management competences. Students from three different universities and backgrounds, cooperate in a common project that drives the learning-teaching process. Previous related works on this initiative have already evaluated the goodness of this multidisciplinary, project-based learning approach in the context of a new educative paradigm. Yet the innovative experience has allowed the authors to define a rubric in order to measure specific competences in project management. The study shows the rubric’s main aspects as well as competence acquisition evaluation alternatives, based in the metrics defined. Key indicators and specific reports obtained from data base fields in the web tool will support this work. As a result, new competences can be assessed, such ones like teamwork, problem solving, communication and leadership. Final goal is to provide an overall competence map to the students at the same time they improve their skills.
Resumo:
Background: Despite the existence of ample literature dealing, on the one hand, with the integration of innovations within health systems and team learning, and, on the other hand, with different aspects of the detection and management of intimate partner violence (IPV) within healthcare facilities, research that explores how health innovations that go beyond biomedical issues—such as IPV management—get integrated into health systems, and that focuses on healthcare teams’ learning processes is, to the best of our knowledge, very scarce if not absent. This realist evaluation protocol aims to ascertain: why, how, and under what circumstances primary healthcare teams engage (if at all) in a learning process to integrate IPV management in their practices; and why, how, and under what circumstances team learning processes lead to the development of organizational culture and values regarding IPV management, and the delivery of IPV management services. Methods: This study will be conducted in Spain using a multiple-case study design. Data will be collected from selected cases (primary healthcare teams) through different methods: individual and group interviews, routinely collected statistical data, documentary review, and observation. Cases will be purposively selected in order to enable testing the initial middle-range theory (MRT). After in-depth exploration of a limited number of cases, additional cases will be chosen for their ability to contribute to refining the emerging MRT to explain how primary healthcare learn to integrate intimate partner violence management. Discussion: Evaluations of health sector responses to IPV are scarce, and even fewer focus on why, how, and when the healthcare services integrate IPV management. There is a consensus that healthcare professionals and healthcare teams play a key role in this integration, and that training is important in order to realize changes. However, little is known about team learning of IPV management, both in terms of how to trigger such learning and how team learning is connected with changes in organizational culture and values, and in service delivery. This realist evaluation protocol aims to contribute to this knowledge by conducting this project in a country, Spain, where great endeavours have been made towards the integration of IPV management within the health system.
Resumo:
It is argued in this study that current investigations of the role of conflict in shared leadership teams and, thus, teams in which all members have the opportunity to participate in its decision-making process are insufficient as they have focused on the downsides of these conflicts. This study demonstrates that task conflict is beneficial in that it can have positive effects on innovation in teams. It shows that particularly in shared leadership management consultant teams task conflict can stimulate innovation. Therefore, this research investigates the relationships among shared leadership, conflict and innovation. The research develops and empirically tests a conceptual model which demonstrates the relationships between these concepts and for which the inclusion of multiple research methods was essential. The sequential explanatory approach included a combination of quantitative and qualitative methods, the order of which can be adapted for other domains of application. The conceptual model was first tested with a sample of 329 management consultants. This was followed by 25, in-depth, face-to-face interviews conducted with individual survey respondents. In addition, weekly meetings of a management consultant team in action were video recorded over several months. This allowed for an in-depth explanation of the findings from the survey by providing an understanding of the underlying processes. The inclusion of observational methods provided a validating role and explained how and why conflicts contributed to the development of team innovation, through the analysis of subtleties and fleeting disagreements in a real-life management consultant team. The results deliver an assessment of the theoretical model and demonstrate that task conflict can allow for additional innovation in management consultant teams operating under a shared leadership structure. A practical model and guidelines for management consultant teams wanting to enhance their innovatory capacities are provided. In addition, a novel-user methodology which includes video observations is developed, with recommendations and steps aiding researchers aiming to employ a similar combination of methods. An original contribution to knowledge is made regarding the positive effects that task conflict can have towards innovation in shared leadership teams. Collaboration and trust are identified as important mediators between shared leadership and task conflict and significant regarding the development of innovation. The effectiveness of shared leadership in reducing negative relationship conflict and the benefits of both shared leadership and task conflict in enhancing innovation are demonstrated.
Resumo:
Major South-East Asian city-regions have experienced considerable physical, economic and social transformations during the past three decades. The rapid pace of globalisation and economic restructuring has resulted in these city-regions receiving the full impact of urbanisation pressures. In an attempt to ease these pressures, city-regions such as Bangkok, Seoul, Tokyo, Taipei, Hong Kong, Singapore and Kuala Lumpur have advocate growth management approaches giving particular interest to urban sustainability. These approaches promote efforts to achieve the triple bottom line sustainability by balancing economic and social development, and environmental protection, and putting more emphasis on compact and optimum development of urban forms. This paper evaluates the case of two South-East Asian city-regions, Kuala Lumpur and Hong Kong, and assesses their experiences in managing their urban forms whilst promoting sustainable patterns of urban development. The findings show that sustainable urban development initiatives employing a top down approach has yielded encouraging results in these case study city-regions. However the need for a more concerted effort towards the overall sustainability agenda still remains vital.
Resumo:
The purpose of this study is to demonstrate the appropriateness of “Japanese Manufacturing Management” (JMM) strategies in the Asian, ASEAN and Australasian automotive sectors. Secondly, the study assessed JMM as a prompt, effective and efficient global manufacturing management practice for automotive manufacturing companies to learn; benchmark for best practice; acquire product and process innovation, and enhance their capabilities and capacities. In this study, the philosophies, systems and tools that have been adopted in various automotive manufacturing assembly plants and their tier 1 suppliers in the three Regions were examined. A number of top to middle managers in these companies were located in Thailand, Indonesia, Malaysia, Singapore, Philippines, Viet Nam, and Australia and were interviewed by using a qualitative methodology. The results confirmed that the six pillars of JMM (culture change, quality at shop floor, consensus, incremental continual improvement, benchmarking, and backward-forward integration) are key enablers to success in adopting JMM in both automotive and other manufacturing sectors in the three Regions. The analysis and on-site interviews identified a number of recommendations that were validated by the automotive manufacturing company’s managers as the most functional JMM strategies.
Resumo:
The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
A recent Australian survey of beginning teachers indicates that issue of classroom management continues to be a key concern for early career educators (Australian Education Union, 2007). This finding is supported by the wider literature that identifies managing the classroom, particularly managing behaviour within the classroom, as critical issues for early career teachers (Arends, 2006; Charles, 2004; Groundwater-Smith, Ewing & Le Cornu, 2007). In fact, struggling to manage student behaviour and maintain positive relationships with students are among the top reasons for teachers leaving the teaching profession (Charles, 2004). So, how does a teacher effectively organise and manage up to thirty students learning and behaviour at any one time? The issue of classroom management is a persistent one for all teachers, but is particularly daunting for new teachers. Historically, classrooms were established on strong hierarchical structures that relied heavily on teacher control and authority. However, more recent approaches to managing the classroom are proactive and more collaborative. That is not to say that there exists a single management recipe, far from it. Beginning teachers must view possible approaches to managing the classroom in light of their own beliefs about teaching and learning, their current classroom practice and variables from the context in which they are teaching.
Resumo:
From the perspective of network, a project team’s social capital consists of conduits network, and resource exchange network. Prior research intensively studies the effect of the structure of conduits network on the team’s performance, assuming knowledge transfer is the causal mechanism linking conduits network to performance. This paper attempts to explore the interrelations between conduits network and knowledge network, and further distinguish the different influence between various conduit networks, and hypothesizes that a project team’s knowledge network mediates the effect of various conduit networks on the team’s performance. This research can enrich our knowledge of disparate influence of the various conduit networks on knowledge transfer, and imply some management practices to enhance the organization’s social capital, and hence improve the organization’s performance.
Resumo:
Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.
Resumo:
The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.
Resumo:
The importance of agriculture in many countries has tended to reduce as their economies move from a resource base to a manufacturing industry base. Although the level of agricultural production in first world countries has increased over the past two decades, this increase has generally been at a less significant rate compared to other sectors of the economies. Despite this increase in secondary and high technology industries, developed countries have continued to encourage and support their agricultural industries. This support has been through both tariffs and price support. Following pressure from developing economies, particularly through the World Trade Organisation (WTO), GATT Uruguay round and the Cairns Group developed countries are now in various stages of winding back or de-coupling agricultural support within their economies. A major concern of farmers in protected agricultural markets is the impact of a free market trade in agricultural commodities on farm incomes, profitability and land values. This paper will analyse both the capital and income performance of the NSW rural land market over the period 1990-1999. This analysis will be based on several rural land use classifications and will compare the total return from rural properties based on the farm income generated by both the average farmer and those farmers considered to be in the top 20% of the various land use areas. The analysis will provide a comprehensive overview of rural production in a free trade economy.