995 resultados para pruning time
Resumo:
Real‐time kinematic (RTK) GPS techniques have been extensively developed for applications including surveying, structural monitoring, and machine automation. Limitations of the existing RTK techniques that hinder their applications for geodynamics purposes are twofold: (1) the achievable RTK accuracy is on the level of a few centimeters and the uncertainty of vertical component is 1.5–2 times worse than those of horizontal components and (2) the RTK position uncertainty grows in proportional to the base‐torover distances. The key limiting factor behind the problems is the significant effect of residual tropospheric errors on the positioning solutions, especially on the highly correlated height component. This paper develops the geometry‐specified troposphere decorrelation strategy to achieve the subcentimeter kinematic positioning accuracy in all three components. The key is to set up a relative zenith tropospheric delay (RZTD) parameter to absorb the residual tropospheric effects and to solve the established model as an ill‐posed problem using the regularization method. In order to compute a reasonable regularization parameter to obtain an optimal regularized solution, the covariance matrix of positional parameters estimated without the RZTD parameter, which is characterized by observation geometry, is used to replace the quadratic matrix of their “true” values. As a result, the regularization parameter is adaptively computed with variation of observation geometry. The experiment results show that new method can efficiently alleviate the model’s ill condition and stabilize the solution from a single data epoch. Compared to the results from the conventional least squares method, the new method can improve the longrange RTK solution precision from several centimeters to the subcentimeter in all components. More significantly, the precision of the height component is even higher. Several geosciences applications that require subcentimeter real‐time solutions can largely benefit from the proposed approach, such as monitoring of earthquakes and large dams in real‐time, high‐precision GPS leveling and refinement of the vertical datum. In addition, the high‐resolution RZTD solutions can contribute to effective recovery of tropospheric slant path delays in order to establish a 4‐D troposphere tomography.
Resumo:
Provisional supervision (PS) is Hong Kong’s proposed new corporate rescue procedure. In essence, it is a procedure for the preparation by a professional, usually an accountant or a solicitor, of a proposal for a voluntary arrangement, supported by a moratorium. There should be little court involvement in the process and it is anticipated that the costs and delays of the process would be less than alternate, currently available procedures. This article will retrace some of the key events and issues arising from the numerous policy and legislative debates about PS in Hong Kong. At present the Hong Kong government is in the midst of drafting a new Bill on corporate rescue procedure to be introduced to the HKSAR Legislative Council. This will be the third attempt. Setting aside the controversies and the content of this new effort by the Hong Kong administration, the Global Financial Crisis in 2008 has signalled to the international policy and business community, free markets alone cannot be an effective regulatory mechanism. Having legal safeguards and clear rules to regulate procedures and conduct of market participants are imperative to avoid future financial meltdowns.
Resumo:
The city of Scottsdale Arizona implemented the first fixed photo Speed Enforcement camera demonstration Program (SEP) on a US freeway in 2006. A comprehensive before-and-after analysis of the impact of the SEP on safety revealed significant reductions in crash frequency and severity, which indicates that the SEP is a promising countermeasure for improving safety. However, there is often a trade off between safety and mobility when safety investments are considered. As a result, identifying safety countermeasures that both improve safety and reduce Travel Time Variability (TTV) is a desirable goal for traffic safety engineers. This paper reports on the analysis of the mobility impacts of the SEP by simulating the traffic network with and without the SEP, calibrated to real world conditions. The simulation results show that the SEP decreased the TTV: the risk of unreliable travel was at least 23% higher in the ‘without SEP’ scenario than in the ‘with SEP’ scenario. In addition, the total Travel Time Savings (TTS) from the SEP was estimated to be at least ‘569 vehicle-hours/year.’ Consequently, the SEP is an efficient countermeasure not only for reducing crashes but also for improving mobility through TTS and reduced TTV.
Resumo:
This paper presents a method of voice activity detection (VAD) for high noise scenarios, using a noise robust voiced speech detection feature. The developed method is based on the fusion of two systems. The first system utilises the maximum peak of the normalised time-domain autocorrelation function (MaxPeak). The second zone system uses a novel combination of cross-correlation and zero-crossing rate of the normalised autocorrelation to approximate a measure of signal pitch and periodicity (CrossCorr) that is hypothesised to be noise robust. The score outputs by the two systems are then merged using weighted sum fusion to create the proposed autocorrelation zero-crossing rate (AZR) VAD. Accuracy of AZR was compared to state of the art and standardised VAD methods and was shown to outperform the best performing system with an average relative improvement of 24.8% in half-total error rate (HTER) on the QUT-NOISE-TIMIT database created using real recordings from high-noise environments.
Resumo:
We assess the performance of an exponential integrator for advancing stiff, semidiscrete formulations of the unsaturated Richards equation in time. The scheme is of second order and explicit in nature but requires the action of the matrix function φ(A) where φ(z) = [exp(z) - 1]/z on a suitability defined vector v at each time step. When the matrix A is large and sparse, φ(A)v can be approximated by Krylov subspace methods that require only matrix-vector products with A. We prove that despite the use of this approximation the scheme remains second order. Furthermore, we provide a practical variable-stepsize implementation of the integrator by deriving an estimate of the local error that requires only a single additional function evaluation. Numerical experiments performed on two-dimensional test problems demonstrate that this implementation outperforms second-order, variable-stepsize implementations of the backward differentiation formulae.
Resumo:
In total, 782 Escherichia coli strains originating from various host sources have been analyzed in this study by using a highly discriminatory single-nucleotide polymorphism (SNP) approach. A set of eight SNPs, with a discrimination value (Simpson's index of diversity [D]) of 0.96, was determined using the Minimum SNPs software, based on sequences of housekeeping genes from the E. coli multilocus sequence typing (MLST) database. Allele-specific real-time PCR was used to screen 114 E. coli isolates from various fecal sources in Southeast Queensland (SEQ). The combined analysis of both the MLST database and SEQ E. coli isolates using eight high-D SNPs resolved the isolates into 74 SNP profiles. The data obtained suggest that SNP typing is a promising approach for the discrimination of host-specific groups and allows for the identification of human-specific E. coli in environmental samples. However, a more diverse E. coli collection is required to determine animal- and environment-specific E. coli SNP profiles due to the abundance of human E. coli strains (56%) in the MLST database.
Resumo:
As AITPM National President, I was invited by Queensland’s Premier, Hon. Anna Bligh MP, as an audience guest to People’s Question Time on Wednesday 24 March 2010, which focused on ‘The Challenges and Opportunities of Population Growth in Queensland’. On the panel were: Premier and Minister for the Arts, Anna Bligh; Minister for Climate Change and Sustainability, Kate Jones; Minister for Infrastructure and Planning, Stirling Hinchliffe; Michael Rayner – Growth Management Summit Advisory Panel, Principal Director, Cox Rayner Architects; and Greg Hallam – Executive Director, Local Government Association of Queensland. The moderator for this session was Law Academic Erin O’Brien, of Queensland University of Technology.
Resumo:
The common approach to estimate bus dwell time at a BRT station is to apply the traditional dwell time methodology derived for suburban bus stops. In spite of being sensitive to boarding and alighting passenger numbers and to some extent towards fare collection media, these traditional dwell time models do not account for the platform crowding. Moreover, they fall short in accounting for the effects of passenger/s walking along a relatively longer BRT platform. Using the experience from Brisbane busway (BRT) stations, a new variable, Bus Lost Time (LT), is introduced in traditional dwell time model. The bus lost time variable captures the impact of passenger walking and platform crowding on bus dwell time. These are two characteristics which differentiate a BRT station from a bus stop. This paper reports the development of a methodology to estimate bus lost time experienced by buses at a BRT platform. Results were compared with the Transit Capacity and Quality of Servce Manual (TCQSM) approach of dwell time and station capacity estimation. When the bus lost time was used in dwell time calculations it was found that the BRT station platform capacity reduced by 10.1%.
Resumo:
The common approach to estimate bus dwell time at a BRT station platform is to apply the traditional dwell time methodology derived for suburban bus stops. Current dwell time models are sensitive towards bus type, fare collection policy along with the number of boarding and alighting passengers. However, they fall short in accounting for the effects of passenger/s walking on a relatively longer BRT station platform. Analysis presented in this paper shows that the average walking time of a passenger at BRT platform is 10 times more than that of bus stop. The requirement of walking to the bus entry door at the BRT station platform may lead to the bus experiencing a higher dwell time. This paper presents a theory for a BRT network which explains the loss of station capacity during peak period operation. It also highlights shortcomings of present available bus dwell time models suggested for the analysis of BRT operation.
Resumo:
Background: The 2003 Bureau of Labor Statistics American Time Use Survey (ATUS) contains 438 distinct primary activity variables that can be analyzed with regard to how time is spent by Americans. The Compendium of Physical Activities is used to code physical activities derived from various surveys, logs, diaries, etc to facilitate comparison of coded intensity levels across studies. ------ ----- Methods: This paper describes the methods, challenges, and rationale for linking Compendium estimates of physical activity intensity (METs, metabolic equivalents) with all activities reported in the 2003 ATUS. ----- ----- Results: The assigned ATUS intensity levels are not intended to compute the energy costs of physical activity in individuals. Instead, they are intended to be used to identify time spent in activities broadly classified by type and intensity. This function will complement public health surveillance systems and aid in policy and health-promotion activities. For example, at least one of the future projects of this process is the descriptive epidemiology of time spent in common physical activity intensity categories. ----- ----- Conclusions: The process of metabolic coding of the ATUS by linking it with the Compendium of Physical Activities can make important contributions to our understanding of Americans’ time spent in health-related physical activity.
Resumo:
Where airports were once the sole responsibility of their governments, liberalisation of economies has seen administrative interests in airport spaces divested increasingly towards market led authority. Extant literature suggests that actions in decision spaces can be described under broad idealised forms of governance. However in looking at a sample of 18 different airports it is apparent that these classic models are insufficient to appreciate the contextual complexity of each case. Issues of institutional arrangements, privatisation, and management focus are reviewed against existing governance modes to produce a model for informing privatisation decisions, based on the contextual needs of the individual airport and region. Expanding governance modes to include emergent airport arrangements both contribute to the existing literature, and provides a framework to assist policy makers and those charged with the operation of airports to design effective governance models. In progressing this framework, contributions are made to government decision makers for the development of new, or review of existing strategies for privatisation, while the private sector can identify the intent and expectations of privatisation initiatives to make better informed decisions.
Resumo:
Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.
Resumo:
This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.
Resumo:
This current report, It’s About Time: Investing in Transportation to Keep Texas Economically Competitive, updates the February 2009 report by providing an enhanced analysis of the current state of the Texas transportation system, determining the household costs of under-investing in the system and identifying potential revenue options for funding the system. However, the general conclusion has not changed. There are tremendous needs and high costs associated with “doing nothing new.”