961 resultados para plans gouvernementaux
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
In Brazil, a policy on citizen participation and consultation in urban intervention programs, in particular in the development of master plans, was first introduced into the Federal Constitution in 1988. This article presents an historical reconstitution of Master Plans in Bauru – State of São Paulo – Brazil. The 1968, 1988 and 2005/2006 consultation methods are analyzed using established criteria. The degree of community participation in the processes is estimated by drawing on a typology based on the level of involvement by residents. The effects of participation caused by changes in political regime, technical planning vision, legal support to consultation, recognition of community importance and knowledge acquired during the process are highlighted and discussed.
Resumo:
In the next decades, aging farmers in the United States will make decisions that affect almost 1 billion acres of land. The future of this land will become more uncertain as farm transfer becomes more difficult, potentially changing the structure of agriculture through farm consolidation, changes in farm ownership and management, or taking land out of production. The Great Plains Population and Environment Project interviewed farmers and their spouses between 1997 and 1999. Farm Family Survey participants were ambiguous about their plans to leave farming, transfer land to others, and even long-term land use, largely due to concerns about the continued economic viability of farming. Participants living far from metropolitan areas expected to sell or rent to other farmers, while those near residential real-estate markets expected to sell to developers. Delays in planning for retirement and succession were common, further threatening the success of intergenerational transitions.
Resumo:
Cooperatives differ from other businesses in that they are owned by their patrons and net margins are distributed to patrons on the basis of use instead of capital investment. For financing, cooperatives often rely on allocated equities from retained patronage refunds. Retained patronage refunds are noncash allocations of net margins reinvested in a cooperative by patrons. Under an ideal program of equity formation, equity is held by patrons in proportion to patronage. Each patron’s share of financing the cooperative is equal to the share of benefits received. Equities of former patrons are retired as active patrons take on more of the responsibility of financing the organization.
Resumo:
Plans and instructions for building a “Two-chamber Rocket Box” bat-house to accommodate large numbers (>200) of bats. See further: http://www.batcon.org/educatorsK/pdfs/fof_bathouse.pdf
Resumo:
The aim of this paper is to analyze the determining factors for the pricing of handsets sold with service plans, using the hedonic price method. This was undertaken by building a database comprising 48 handset models, under nine different service plans, over a period of 53 weeks in 2008, and resulted in 27 different attributes and a total number of nearly 300,000 data registers. The results suggest that the value of monthly subscriptions and calling minutes are important to explain the prices of handsets. Furthermore, both the physical volume and number of megapixels of a camera had an effect on the prices. The bigger the handset, the cheaper it becomes, and the more megapixels a camera phone has, the more expensive it becomes. Additionally, it was found that in 2008 Brazilian phone companies were subsidizing enabled data connection handsets.
Resumo:
The aim of this paper is to analyze the determining factors for the pricing of handsets sold with service plans, using the hedonic price method. This was undertaken by building a database comprising 48 handset models, under nine different service plans, over a period of 53 weeks in 2008, and resulted in 27 different attributes and a total number of nearly 300,000 data registers. The results suggest that the value of monthly subscriptions and calling minutes are important to explain the prices of handsets. Furthermore, both the physical volume and number of megapixels of a camera had an effect on the prices. The bigger the handset, the cheaper it becomes, and the more megapixels a camera phone has, the more expensive it becomes. Additionally, it was found that in 2008 Brazilian phone companies were subsidizing enabled data connection handsets.
Resumo:
Many of developing countries are facing crisis in water management due to increasing of population, water scarcity, water contaminations and effects of world economic crisis. Water distribution systems in developing countries are facing many challenges of efficient repair and rehabilitation since the information of water network is very limited, which makes the rehabilitation assessment plans very difficult. Sufficient information with high technology in developed countries makes the assessment for rehabilitation easy. Developing countries have many difficulties to assess the water network causing system failure, deterioration of mains and bad water quality in the network due to pipe corrosion and deterioration. The limited information brought into focus the urgent need to develop economical assessment for rehabilitation of water distribution systems adapted to water utilities. Gaza Strip is subject to a first case study, suffering from severe shortage in the water supply and environmental problems and contamination of underground water resources. This research focuses on improvement of water supply network to reduce the water losses in water network based on limited database using techniques of ArcGIS and commercial water network software (WaterCAD). A new approach for rehabilitation water pipes has been presented in Gaza city case study. Integrated rehabilitation assessment model has been developed for rehabilitation water pipes including three components; hydraulic assessment model, Physical assessment model and Structural assessment model. WaterCAD model has been developed with integrated in ArcGIS to produce the hydraulic assessment model for water network. The model have been designed based on pipe condition assessment with 100 score points as a maximum points for pipe condition. As results from this model, we can indicate that 40% of water pipeline have score points less than 50 points and about 10% of total pipes length have less than 30 score points. By using this model, the rehabilitation plans for each region in Gaza city can be achieved based on available budget and condition of pipes. The second case study is Kuala Lumpur Case from semi-developed countries, which has been used to develop an approach to improve the water network under crucial conditions using, advanced statistical and GIS techniques. Kuala Lumpur (KL) has water losses about 40% and high failure rate, which make severe problem. This case can represent cases in South Asia countries. Kuala Lumpur faced big challenges to reduce the water losses in water network during last 5 years. One of these challenges is high deterioration of asbestos cement (AC) pipes. They need to replace more than 6500 km of AC pipes, which need a huge budget to be achieved. Asbestos cement is subject to deterioration due to various chemical processes that either leach out the cement material or penetrate the concrete to form products that weaken the cement matrix. This case presents an approach for geo-statistical model for modelling pipe failures in a water distribution network. Database of Syabas Company (Kuala Lumpur water company) has been used in developing the model. The statistical models have been calibrated, verified and used to predict failures for both networks and individual pipes. The mathematical formulation developed for failure frequency in Kuala Lumpur was based on different pipeline characteristics, reflecting several factors such as pipe diameter, length, pressure and failure history. Generalized linear model have been applied to predict pipe failures based on District Meter Zone (DMZ) and individual pipe levels. Based on Kuala Lumpur case study, several outputs and implications have been achieved. Correlations between spatial and temporal intervals of pipe failures also have been done using ArcGIS software. Water Pipe Assessment Model (WPAM) has been developed using the analysis of historical pipe failure in Kuala Lumpur which prioritizing the pipe rehabilitation candidates based on ranking system. Frankfurt Water Network in Germany is the third main case study. This case makes an overview for Survival analysis and neural network methods used in water network. Rehabilitation strategies of water pipes have been developed for Frankfurt water network in cooperation with Mainova (Frankfurt Water Company). This thesis also presents a methodology of technical condition assessment of plastic pipes based on simple analysis. This thesis aims to make contribution to improve the prediction of pipe failures in water networks using Geographic Information System (GIS) and Decision Support System (DSS). The output from the technical condition assessment model can be used to estimate future budget needs for rehabilitation and to define pipes with high priority for replacement based on poor condition. rn
Resumo:
Esperienza di sviluppo di business plan aziendale
Resumo:
La radioterapia è una tecnica molto impiegata per la cura del cancro. Attualmente la somministrazione avviene principalmente attraverso la intensity modulated radiotherapy (IMRT, sovrapposizione di campi ad intensità modulata), un cui sviluppo recente è la volumetric modulated arc therapy (VMAT, irradiazione continua lungo un arco ininterrotto). La generazione di piani richiede esperienza ed abilità: un dosimetrista seleziona cost functions ed obiettivi ed un TPS ottimizza la disposizione dei segmenti ad intensità modulata. Se il medico giudica il risultato non soddisfacente, il processo riparte da capo (trial-and-error). Una alternativa è la generazione automatica di piani. Erasmus-iCycle, software prodotto presso ErasmusMC (Rotterdam, The Netherlands), è un algoritmo di ottimizzazione multicriteriale di piani radioterapici per ottimizzazione di intensità basato su una wish list. L'output consiste di piani Pareto-ottimali ad intensità modulata. La generazione automatica garantisce maggiore coerenza e qualità più elevata con tempi di lavoro ridotti. Nello studio, una procedura di generazione automatica di piani con modalità VMAT è stata sviluppata e valutata per carcinoma polmonare. Una wish list è stata generata attraverso una procedura iterativa su un gruppo ristretto di pazienti con la collaborazione di fisici medici ed oncologi e poi validata su un gruppo più ampio di pazienti. Nella grande maggioranza dei casi, i piani automatici sono stati giudicati dagli oncologi migliori rispetto ai rispettivi piani IMRT clinici generati manualmente. Solo in pochi casi una rapida calibrazione manuale specifica per il paziente si è resa necessaria per soddisfare tutti i requisiti clinici. Per un sottogruppo di pazienti si è mostrato che la qualità dei piani VMAT automatici era equivalente o superiore rispetto ai piani VMAT generati manualmente da un dosimetrista esperto. Complessivamente, si è dimostrata la possibilità di generare piani radioterapici VMAT ad alta qualità automaticamente, con interazione umana minima. L'introduzione clinica della procedura automatica presso ErasmusMC è iniziata (ottobre 2015).
Resumo:
Planning in realistic domains typically involves reasoning under uncertainty, operating under time and resource constraints, and finding the optimal subset of goals to work on. Creating optimal plans that consider all of these features is a computationally complex, challenging problem. This dissertation develops an AO* search based planner named CPOAO* (Concurrent, Probabilistic, Over-subscription AO*) which incorporates durative actions, time and resource constraints, concurrent execution, over-subscribed goals, and probabilistic actions. To handle concurrent actions, action combinations rather than individual actions are taken as plan steps. Plan optimization is explored by adding two novel aspects to plans. First, parallel steps that serve the same goal are used to increase the plan’s probability of success. Traditionally, only parallel steps that serve different goals are used to reduce plan execution time. Second, actions that are executing but are no longer useful can be terminated to save resources and time. Conventional planners assume that all actions that were started will be carried out to completion. To reduce the size of the search space, several domain independent heuristic functions and pruning techniques were developed. The key ideas are to exploit dominance relations for candidate action sets and to develop relaxed planning graphs to estimate the expected rewards of states. This thesis contributes (1) an AO* based planner to generate parallel plans, (2) domain independent heuristics to increase planner efficiency, and (3) the ability to execute redundant actions and to terminate useless actions to increase plan efficiency.