853 resultados para pavements
Resumo:
Due to limited budgets and reduced inspection staff, state departments of transportation (DOTs) are in need of innovative approaches for providing more efficient quality assurance on concrete paving projects. The goal of this research was to investigate and test new methods that can determine pavement thickness in real time. Three methods were evaluated: laser scanning, ultrasonic sensors, and eddy current sensors. Laser scanning, which scans the surface of the base prior to paving and then scans the surface after paving, can determine the thickness at any point. Also, scanning lasers provide thorough data coverage that can be used to calculate thickness variance accurately and identify any areas where the thickness is below tolerance. Ultrasonic and eddy current sensors also have the potential to measure thickness nondestructively at discrete points and may result in an easier method of obtaining thickness. There appear to be two viable approaches for measuring concrete pavement thickness during the paving operation: laser scanning and eddy current sensors. Laser scanning has proved to be a reliable technique in terms of its ability to provide virtual core thickness with low variability. Research is still required to develop a prototype system that integrates point cloud data from two scanners. Eddy current sensors have also proved to be a suitable alternative, and are probably closer to field implementation than the laser scanning approach. As a next step for this research project, it is suggested that a pavement thickness measuring device using eddy current sensors be created, which would involve both a handheld and paver-mounted version of the device.
Resumo:
The concept of cracking and seating a portland cement concrete (pcc) pavement prior to laying an asphalt cement concrete (acc) surface in order to reduce reflection cracking has been around since the 1950s. With the advent of improved cracking equipment, this method gained renewed interest in the 1970s and 1980s. This project incorporated six test sections of which four were cracked and seated prior to being overlaid. Fremont County decided to utilize only a 0.9 m (3 ft) cracking pattern based on a 30 m (100 ft) trial test section. Pavement cracking appeared to be effective in reducing primarily longitudinal reflectance cracking, but only marginally successful in the reduction of transverse reflective cracking.
Resumo:
Experience has shown that milling machines with carbide tipped teeth have the capability of profiling most asphalt concrete (ac) and portland cement concrete (pcc) pavements. Most standard milling operations today leave a very coarse, generally objectionable surface texture. This research utilized a Cedarapids Wirtgen 1900C mill modified by adding additional teeth. There were 411 teeth at a 5 millimeter transverse spacing (standard spacing is 15 mm) on a 6 ft. 4 in. long drum. The mill was used to profile and texture the surface of one ac and two pcc pavements. One year after the milling operation there is still some noticeable change in tire noise but the general appearance is good. The milling operation with the additional teeth provides an acceptable surface texture with improved Friction Numbers when compared to a nonmilled surface.
Resumo:
Roller compacted concrete (RCC) is a zero slump portland cement concrete mixture that has been used since the early 1970's in massive concrete structures. Iowa Highway Research Board project HR-300 was established to determine if this type mix could be used to pave roads on the Iowa road system. Manatt's Inc. of Brooklyn, Iowa agreed to pave an 800 ft. x 22 ft. x 10 in. section of RCC pavement in their Ames construction yard. This report discusses the construction of the test slab and interprets test results conducted during and after construction. It was observed that RCC can be placed with conventional asphalt paving equipment. However, there are several problems with RCC paving which must be resolved before RCC can become a viable paving alternative on Iowa's roadway system.
Resumo:
This research was initiated in 1991 as a part of a whitetopping project to study the effectiveness of various techniques to enhance bond strength between a new portland cement concrete (PCC) overlay and an existing asphalt cement concrete (ACC) pavement surface. A 1,676 m (5,500 ft) section of county road R16 in Dallas County was divided into 12 test sections. The various techniques used to enhance bond were power brooming, power brooming with air blast, milling, cement and water grout, and emulsion tack coat. Also, two sections were planed to a uniform cross-section, two pavement thicknesses were placed, and two different concrete mix proportions were used. Bond strength was perceived to be the key to determining an appropriate design procedure for whitetopping. If adequate bond is achieved, a bonded PCC overlay technique can be used for design. Otherwise, an unbonded overlay procedure may be more appropriate. Conclusions are as follows: (1) Bond Strength Differences - Milling increased bond strength versus no milling. Tack coat showed increased bond strength versus no tack coat. Planing, Air Blast and Grouting did not provide noticeable improvements in bond strength; nor did different PCC types or thicknesses affect bond strength significantly. (2) Structure - Structural measurements correlated strongly with the wide variation in pavement thicknesses. They did not provide enough information to determine the strength of bonding or the level of support being provided by the ACC layer. Longitudinal cracking correlated with PCC thicknesses and with planing. (3) Bond Over Time - The bond between PCC and ACC layers is degrading over time in the outside wheel path in all of the sections except tack coat (section 12). The bond strength in the section with tack coat was lower than the others, but remained relatively steady.
Resumo:
The use of non-metallic load transfer and reinforcement devices for concrete highway pavements is a possible alternative to avoid corrosion problems related to the current practice of steel materials. Laboratory and field testing of highway pavement dowel bars, made of both steel and fiber composite materials, and fiber composite tie rods were carried out in this research investigation. Fatigue, static, and dynamic testing was performed on full-scale concrete pavement slabs which were supported by a simulated subgrade and which included a single transverse joint. The bahavior of the full-scale specimens with both steel and fiber composite dowels placed in the test joints was monitored during several million load cycles which simulated truck traffic at a transverse joint. Static bond tests were conducted on fiber composite tie rods to determine the required embedment length. These tests took the form of bending tests which included curvature and shear in the embedment zone and pullout tests which subjected the test specimen to axial tension only. Fiber composite dowel bars were placed at two transverse joints during construction of a new concrete highway pavement in order to evaluate their performance under actual field conditions. Fiber composite tie rods were also placed in the longitudinal joint between the two fiber composite doweled transverse joints.
Resumo:
The Benkelman Beam structural test of flexible pavements was replaced in 1976 by dynamic deflection testing with a model 400 Road Rater. The Road Rater is used to determine structural ratings of flexible pavements. New pavement construction in Iowa has decreased with a corresponding increase of restoration and rehabilitation. A method to determine structural ratings of layered systems and rigid pavements is needed to properly design overlay thickness. The objective of this research was to evaluate the feasibility of using the Road Rater to determine support values of layered systems and rigid pavements. This evaluation was accomplished by correlating the Road Rater with the Federal Highway Administration (FHWA) Thumper, a dynamic deflection testing device. Data were obtained with the Road Rater and Thumper at 411 individual test locations on 39 different structural sections ranging from 10" of PCC pavement and 25" of asphalt pavement to a newly graveled unpaved roadway. A high correlation between a 9000 pound Thumper deflection and the 1185 pound Road Rater deflection was obtained. A Road Rater modification has been completed to provide 2000 pound load inputs. The basin, defined by four sensors spaced at 1 foot intervals, resulting from the 2000 pound loading is being used to develop a graph for determining relative subgrade strengths. Road Rater deflections on rigid pavements are sufficient to support the potential for this technique.
Resumo:
The objective of this project was to determine if any of several cutback and emulsified asphalt plant mixed and road mixed overlays had the ability to resist thermal cracking at low temperatures without inducing shoving and/or ruttinq at high temperatures. A 2.6 mile section of Osceola County road A-34 and a 7.0 mile section of A-46 were divided into 14 test sections of various lengths. After six years, results show an MC-3000 asphalt cutback cold mix can reduce the amount of reflective cracking when compared to an AC-5 hot mix. This can be done without inducing high temperature related problems. Cold road mixing can be effective in reducing cracking on low volume roads. However, more experience is required if the full benefits of road mixing are to be realized.
Resumo:
Research project HR-231, "Special Surface Preparation Prior to Bituminous Overlay", was initiated in 1982 to study the effectiveness of three different crack fillers in extending pavement life. In particular, this project was designed to determine if any of the fillers could substantially reduce the rate of subsurface deterioration and general deterioration of an asphalt pavement at crack locations. This project also sought to determine the effects of the various crack filling procedures on different thicknesses of bituminous overlays. The three fillers, a fly ash slurry, an emulsion, and a rubberized asphalt mixture, were used along with a control section with no crack filler material on a 2.5 mile section of Cerro Gordo Trunk Route S-25 south of the town of Thornton. This report discusses the construction and performance of each filler material and makes recommendations concerning future use of any of the materials used.
Resumo:
The Iowa Department of Transportation (DOT) is continually improving the pavement management program and striving to reduce maintenance needs. Through a 1979 pavement management study, the Iowa DOT became a participant in a five state Federal Highway Administration (FHWA) study of "Transverse Cracking of Asphalt Pavements". There were numerous conclusions and recommendations but no agreement as to the major factors contributing to transverse cracking or methods of preventing or reducing the occurrence of transverse cracking. The project did focus attention on the problem and generated ideas for research. This project is one of two state funded research projects that were a direct result of the FHWA project. Iowa DOT personnel had been monitoring temperature susceptibility of asphalt cements by the Norman McLeod Modified Penetration Index. Even though there are many variables from one asphalt mix to another, the trend seemed to indicate that the frequency of transverse cracking was highly dependent on the temperature susceptibility. Research project HR-217 "Reducing the Adverse Effects of Transverse Cracking" was initiated to verify the concept. A final report has been published after a four-year evaluation. The crack frequency with the high temperature susceptible asphalt cement was substantially greater than for the low temperature susceptible asphalt cement. An increased asphalt cement content in the asphalt treated base also reduced the crack frequency. This research on prevention of transverse cracking with fabric supports the following conclusions: 1. Engineering fabric does not prevent transverse cracking of asphalt cement concrete. 2. Engineering fabric may retard the occurrence of transverse cracking. 3. Engineering fabric does not contribute significantly to the structural capability of an asphalt concrete pavement.
Resumo:
In view of the energy, environmental, and economic advantages of the foamed asphalt process using local aggregates in cold mixes and the promising results from Research Project HR-212, a 4.2-mile section of county road in Muscatine County was built with foamed asphalt and local aggregates during August-September 1983. Extensive laboratory evaluation was carried out on five plant mixes representing foamed mixes used in the nine test sections, a laboratory prepared foamed mix, and a laboratory prepared hot mix similar to Plant Mix 1. The foamed mixes were compacted, cured under 15 curing conditions and tested for bulk specific gravity, Marshall stability at 77° F and at 140° F, cured moisture content, resilient modulus and effects of moisture damage due to freeze-thaw cycles, water soaking, and vacuum saturation. In addition, four sets of 83 core samples were taken at 1 to 15 months and tested for moisture content, specific gravity, Marshall stability, and resilient modulus. In summary, the test road has performed satisfactorily for almost two years. The few early construction problems encountered were to be expected for experimental projects dealing with new materials and technologies. Overall results to date are encouraging and foamed asphalt mixes have proved to have the potential as a viable base material in areas where marginal aggregates are available. It is hoped and expected that performance evaluation of the test sections will be continued and that more foamed asphalt trial projects will be constructed and monitored so that experiences and findings from this project can be verified and mix design criteria can be gradually established. For future foamed asphalt projects it is recommended that anti-stripping additives, such as hydrated lime, be added in view of the potential moisture susceptibility of foamed mixes observed in the laboratory evaluation.
Resumo:
The objectives of this research were the collection and evaluation of the data pertaining to the importance of concrete mixing time on air content and distribution, consolidation and workability for pavement construction. American Society for Testing and Materials (ASTM) standard C 94 was used to determine the significance of the mixing time on the consistency of the mix being delivered and placed on grade. Measurements of unit weight, slump, air content, retained coarse aggregate and compressive strength were used to compare the consistency of the mix in the hauling unit at the point of mixing and at the point placement. An analysis of variance was performed on the data collected from the field tests. Results were used to establish the relationship between selected mixing time and the portland cement concrete properties tested. The results were also used to define the effect of testing location (center and side of truck, and on the grade) on the concrete properties. Compressive strength test concepts were used to analyze the hardened concrete pavement strength. Cores were obtained at various locations on each project on or between vibrator locations to evaluate the variance in each sample, between locations, and mixing times. A low-vacuum scanning electron microscope (SEM) was used to study air void parameters in the concrete cores. Combining the data from these analysis thickness measurements and ride in Iowa will provide a foundation for the formulation of a performance based matrix. Analysis of the air voids in the hardened concrete provides a description of the dispersion of the cemtitious materials (specifically flyash) and air void characteristics in the pavement. Air void characteristics measured included size, shape and distribution.
Resumo:
Most pavement contraction joint seals in Iowa, in general, have been performing in less than a satisfactory manner. The effective life of the seals, in maintaining a watertight joint, has been only from two to five years. In search of improvements, research was proposed to evaluate preformed neoprene joint seals. The performance of those seals was to be compared mainly with the hot poured rubberized asphalt sealants and cold applied silicone sealants or other sealants commonly used at the time this research began. Joint designs and methods of sawing were also investigated. All evaluations were done in new portland cement concrete (PCC) pavements. Three projects were initially selected and each included a research section of joint sealing. Some additional sites were later added for evaluation. Several joint sealants were evaluated at each research site. The various sites included high, medium and low levels of traffic. Evaluations were done over a five-year period. Neoprene joint seals provided better performance than hot or cold field formed joints.
Resumo:
A significant question is: What role does newly-formed expansive mineral growth play in the premature deterioration of concrete? These minerals (ettringite and brucite) are formed in cement paste as a result of chemical reactions involving cement and coarse/fine aggregate. Petrographic observations and SEM/EDAX analysis were conducted in order to determine chemical and mineralogical changes in the aggregate and cement paste of samples taken from Iowa concrete highways that showed premature deterioration. Mechanisms involved in deterioration were investigated. A second objective was to investigate whether deicer solutions exacerbate the formation of expansive minerals and concrete deterioration. Magnesium in deicer solutions causes the most severe paste deterioration by forming non-cementitious magnesium silicate hydrate and brucite. Chloride in deicer solutions promotes decalcification of paste and alters ettringite to chloroaluminate. Calcium magnesium acetate (CMA) and magnesium acetate (Mg-acetate) produce the most deleterious effects on concrete, with calcium acetate (Ca-acetate) being much less severe.
Resumo:
Iowa counties have tried to rehabilitate deteriorating portland cement concrete (PCC) pavements with standard overlays, placement of engineering fabric, rock, open graded bituminous mixes and cracking and seating. While these methods prolong the life of the road, the cracks in the old pavement have eventually reflected to the surface. One possible alternative for rehabilitating severely deteriorated roads and preventing reflective cracking is the rubblization process. The objective of this research project was to rehabilitate and evaluate a severely deteriorated PCC roadway using a rubblization process. A 3.0 km (1.9 mi) section of L63 in Mills County was selected for this research. The road was divided into 16 sections. A resonate frequency vibration pavement breaker was used to rubblize the existing pavement. The variables of rubblization, drainage, and ACC overlay depths of 75 mm (3 in.), 100 mm (4 in.), and 125 mm (5 in.) were evaluated. The research on rubblized concrete pavement bases support the following conclusions: (1) The rubblization process prevents reflective cracking; (2) Edge drains improved the structural rating of the rubblized roadway; (3) An ACC overlay of 125 mm (5 in.) on a rubblized base provided an excellent roadway regardless of soil and drainage conditions; (4) An ACC overlay of 75 mm (3 in.) on a rubblized base can provide a good roadway if the soil structure below the rubblized base is stable and well drained; and (5) The Road Rater structural ratings of the rubblized test sections for this project are comparable to the nonrubblized test sections.