993 resultados para organization of work


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis investigated the modulation of dynamic contractile function and energetics of work by posttetanic potentiation (PTP). Mechanical experiments were conducted in vitro using software-controlled protocols to stimulate/determine contractile function during ramp shortening, and muscles were frozen during parallel incubations for biochemical analysis. The central feature of this research was the comparison of fast hindlimb muscles from wildtype and skeletal myosin light chain kinase knockout (skMLCK-/-) mice that does not express the primary mechanism for PTP: myosin regulatory light chain (RLC) phosphorylation. In contrast to smooth/cardiac muscles where RLC phosphorylation is indispensable, its precise physiological role in skeletal muscle is unclear. It was initially determined that tetanic potentiation was shortening speed dependent, and this sensitivity of the PTP mechanism to muscle shortening extended the stimulation frequency domain over which PTP was manifest. Thus, the physiological utility of RLC phosphorylation to augment contractile function in vivo may be more extensive than previously considered. Subsequent experiments studied the contraction-type dependence for PTP and demonstrated that the enhancement of contractile function was dependent on force level. Surprisingly, in the absence of RLC phosphorylation, skMLCK-/- muscles exhibited significant concentric PTP; consequently, up to ~50% of the dynamic PTP response in wildtype muscle may be attributed to an alternate mechanism. When the interaction of PTP and the catchlike property (CLP) was examined, we determined that unlike the acute augmentation of peak force by the CLP, RLC phosphorylation produced a longer-lasting enhancement of force and work in the potentiated state. Nevertheless, despite the apparent interference between these mechanisms, both offer physiological utility and may be complementary in achieving optimal contractile function in vivo. Finally, when the energetic implications of PTP were explored, we determined that during a brief period of repetitive concentric activation, total work performed was ~60% greater in wildtype vs. skMLCK-/- muscles but there was no genotype difference in High-Energy Phosphate Consumption or Economy (i.e. HEPC: work). In summary, this thesis provides novel insight into the modulatory effects of PTP and RLC phosphorylation, and through the observation of alternative mechanisms for PTP we further develop our understanding of the history-dependence of fast skeletal muscle function.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and Thorold Railway estimate of work done to date with an approximation of probable damage sustained by suspending the track, Aug. 22, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Aug. 31, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month of August, 1854, signed by S.D. Woodruff, Sept. 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Sept. 30, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Sept. 1854, signed by S.D. Woodruff, Oct. 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Oct. 31, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Oct. 1854, signed by S.D. Woodruff, Nov. 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month ending Dec. 1, 1854, signed by S.D. Woodruff, Jan. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Jan. 1855, signed by S.D. Woodruff, Feb. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the months of Feb. and March, 1855, signed by S.D. Woodruff, Apr. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Scrap of paper that has been burned almost completely. Only the header of the document is intact. It is an estimate of work done by Messrs. Brown and McDonell, contractors on sections 1, 2 and 3 ending at St. Catharines for the months of April and May 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month of June 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of June 1855, signed by S.D. Woodruff, Jul. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Sept. 1855, signed by S.D. Woodruff, Oct. 1855.