944 resultados para layout.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Manufacturing system, layout planning, facilities location problem, information, communication

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Layout of My Thesis This thesis contains three chapters in Industrial Organization that build on the work outlined above. The first two chapters combine leniency programs with multimarket contact and provide a thorough analysis of the potential effects of Amnesty Plus and Penalty Plus. The third chapter puts the whole discussion on leniency programs into perspective by examining other enforcement tools available to an antitrust authority. The main argument in that last chapter is that a specific instrument can only be as effective as the policy in which it is embedded. It is therefore important for an antitrust authority to know how it best accompanies the introduction or modification of a policy instrument that helps deterrence. INTRODUCTION Chapter 1 examines the efféct of Amnesty Plus and Penalty Plus on the incentives of firms to report cartel activities. The main question is whether the inclusion of these policies in a leniency program undermine the effectiveness of the latter by discouraging the firms to apply for amnesty. The model is static and focus on the ex post incentives of firms to desist from collusion. The results suggest that, because Amnesty Plus and Penalty Plus encourage the reporting of a second cartel after a first detection, a firm, anticipating this, may be reluctant to seek leniency and to report in the first place. However, the effect may also go in the opposite direction, and Amnesty Plus and Penalty Plus may encourage the simultaneous reporting of two cartels. Chapter 2 takes this idea further to the stage of cartel formation. This chapter provides a complete characterization of the potential anticompetitive and procompetitive effects of Amnesty Plus in a infinitely repeated game framework when the firms use their multimarket contact to harshen punishment. I suggest a clear-cut policy rule that prevents potential adverse effects and thereby show that, if policy makers follow this rule, a leniency program with Amnesty Plus performs better than one without. Chapter 3 characterizes the socially optimal enforcement effort of an antitrust authority and shows how this effort changes with the introduction or modification of specific policy instruments. The intuition is that the policy instrument may increase the marginal benefit of conducting investigations. If this effect is strong enough, a more rigorous detection policy becomes socially desirable.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aquest projecte consisteix en l’estudi, disseny i fabricació d’un amplificador de baix soroll per instrumentació, el qual es basarà en uns requisits de guany, ample de banda i de mides a complir. Un vegada vistos els requisits i fet un estudi previ de la situació, el primer pas serà realitzar el disseny principal de l’amplificador, el qual s’anirà millorant a mesura que avanci el projecte. Un cop dissenyat i avaluat el circuit amb el software ADS, el següent pas serà intentar fer un model de layout, el qual serà fabricat i analitzat, per tal d'intentar aconseguir el resultat esperat de les especificacions. Finalment, es detallaran les conclusions a les quals s’ha arribat desprès d’haver realitzat aquest projecte.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este trabajo tiene como objetivo diseñar e implementar un receptor multifrecuencia requerido para aplicaciones Galileo centradas a realizar correcciones de errores y estudios de la ionosfera. Estas características obligan a buscar alternativas respecto los receptores superheterodinos convencionales dado que para éstos los retardos de propagación entre las diferentes bandas de interés son inaceptables. Por ello, se presenta un receptor basado en la técnica de muestreo paso banda, que permite trasladar el espectro mediante el conversor ADC a través de un aliasing intencionado, eliminando así los retardos de propagación entre bandas de interés, dado que todas se albergan en un mismo canal. En este trabajo nos hemos centrado únicamente en las etapas críticas del receptor presentado, siendo éstas la etapa de filtrado y conversión digital. La etapa de filtrado requerirá filtros muy selectivos, ya que el ruido existente fuera de banda se solapará a nuestra banda de interés, degradando la SNR del sistema a medida que tenga más potencia. Esta etapa se ha realizado mediante una estructura duplexora conjuntamente con dos filtros de líneas acopladas. La etapa de conversión se ha realizado fabricando el layout de un conversor comercial, del cual se ha validado el correcto funcionamiento para la aplicación requerida.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Triatoma brasiliensis is considered one of the most important Chagas disease vectors being a widespread species in semiarid areas of northeastern Brazil. The species displays distinct chromatic patterns of the cuticle in different localities. Four populations were analyzed in this study: 1-Caicó, Rio Grande do Norte, it will be called the brasiliensis population; 2-Espinosa, Minas Gerais, the melanica population; 3-Petrolina, Pernambuco, the macromelasoma population, and 4-Juazeiro, Bahia, the darker one in overall cuticle coloration, the Juazeiro population. In order to differentiate the four populations of T. brasiliensis, a comparative morphological analysis of external genital structures and of eggs were carried out. The analysis of the male genital structures evidenced minor individual structural variations that did not correlate with chromatic differences or the geographical origins, emphasizing the importance of examining sufficiently large and representative samples before using minor genital variations for taxonomic diagnosis. By scanning electron microscopy of the egg exochorion, each chromatic population presented a distinct ornamentation pattern. The melanica population differed mainly from the other populations studied since it had about 40.6%, 69.6% and 76.6% more perforations, on each cell exochorion, than the brasiliensis, the Juazeiro and the macromelasoma populations respectively. In the melanica population the perforation layout is also peculiar, with densely distributed perforations over all the egg surface. Morphometric measures of the eggs showed statistically significant differences: the macromelasoma population presented the longest length (2.43 mm) while the shortest was recorded in the brasiliensis population (2.29 mm).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

L'arrivée des aventures de Tintin dans la presse illustrée helvétique ne se fera pas sans heurts. Au-delà de l'habituelle réappropriation nationale du héros belge, d'importants réaménagements sont pratiqués par l'hebdomadaire catholique genevois L'Écho Illustré, et ce surtout pendant les années 1930. En analysant cette réadaptation, cet article tente de questionner le rapport à l'image distrayante d'un magazine confessionnel qui souhaiterait y voir figurer une portée éducative et morale. D'autre part, le contexte de la presse suisse pendant cette période est encore relativement peu enclin à accueillir la publication de bandes dessinées. Il s'agit donc d'observer de quelle manière ce nouveau média s'intègre dans un support déjà bien établi comme la presse illustrée de la Suisse de l'Entre-deux-guerres. The way Tintin becomes part of the Swiss illustrated press is at least eventful. Beside the usual re-nationalization of the Belgian hero, the catholic weekly magazine from Geneva, L'Écho Illustré, realizes important changes in the comics layout, mostly through the Thirties. By analyzing these readjustments, we would like to explore the link between a confessional magazine and entertaining images, considering that this kind of press would like these images to achieve an additional educative and moral goal. Moreover, the Swiss press's context studied here is still relatively unresponsive to publish comics. The aim of this paper is finally to observe how a new media is integrated into an already well-established framework such as the illustrated press in Switzerland during the inter-war years.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ant queens that attempt to disperse and found new colonies independently face high mortality risks. The exposure of queens to soil entomopathogens during claustral colony founding may be particularly harmful, as founding queens lack the protection conferred by mature colonies. Here, we tested the hypotheses that founding queens (I) detect and avoid nest sites that are contaminated by fungal pathogens, and (II) tend to associate with other queens to benefit from social immunity when nest sites are contaminated. Surprisingly, in nest choice assays, young Formica selysi BONDROIT, 1918 queens had an initial preference for nest sites contaminated by two common soil entomopathogenic fungi, Beauveria bassiana and Metarhizium brunneum. Founding queens showed a similar preference for the related but non-entomopathogenic fungus Fusarium graminearum. In contrast, founding queens had no significant preference for the more distantly related nonentomopathogenic fungus Petromyces alliaceus, nor for heat-killed spores of B. bassiana. Finally, founding queens did not increase the rate of queen association in presence of B. bassiana. The surprising preference of founding queens for nest sites contaminated by live entomopathogenic fungi suggests that parasites manipulate their hosts or that the presence of specific fungi is a cue associated with suitable nesting sites.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This brand new market briefing adds to the growing national debate on the future of dementia care services, making use of a unique and extensive L&B survey (2008) of over 6,000 care homes in the UK which provide care for people with dementia. It builds on the findings of the Alzheimer’s Society’s Dementia UK report (2007) and the national strategy for dementia Living Well with Dementia (2009) to identify market opportunities and provide essential guidance and information with regard to planning and developing new and existing services.Key issues, facts and figures highlighted in the report include:Dementia care is a multi-billion pound market in the UK and this market is set to grow considerably.��Dementia care in care homes dominates the sector in terms of current market value.��The use of dementia home care – though significantly smaller than the equivalent market in care homes – is set to rise markedly in the future.A significant proportion of residents for whom dementia is a known cause of admission are receiving care in settings which are not dedicated to dementia care.The new national dementia strategy for England, Living Well with Dementia should provide the strongest impetus yet for growth in the market for specialist dementia care.Growing awareness surrounding inappropriate use of anti-psychotic drugs on people with dementia in care homes may have a major operational impact on some homes if controls are increased and could substantially increase costs.Despite evidence of increasing dementia specialisation, there are, as yet, no organisations to emerge with full service dementia expertise and integrated care pathways.The supply of dedicated dementia services varies dramatically by region and locality, reflecting local and regional priorities and commissioning strategies.The design and layout of care homes for people with dementia is key and there is an increasing consensus around what constitutes best practice and ‘dementia friendly design’ .Care home fees for dementia are generally higher than fees for frail elderly residents.The report is essential reading for senior executives and managers within any organisation committed to, or considering involvement in, the dementia care sector, including for-profit, 'third sector' and public sector agencies.For further information, please contact:��Market ReportsTel.��020 7833 9123 orEmail��info@laingbuisson.co.uk��Download Full Brochure including Order Form��Download Contents and Tables�� Featured item on home page:��no��

Relevância:

10.00% 10.00%

Publicador:

Resumo:

És ben sabut que les úniques etapes del cicle de vida del programari que necessàriament s'han d'especificar són les de recollida de requisits i l'anàlisi o l'especificació del programari. La resta (disseny, implementació i prova) es pot generar d'una manera més o menys automàtica a partir de l'anàlisi. En aquest PFC hem volgut estudiar la viabilitat de la construcció automàtica de codi SQL a partir de diagrames de classes d'anàlisi UML. S'ha estès l'eina de modelatge UML Poseidon amb un connector, de manera que amb una interfície molt simple es pot obtenir molt ràpidament l'esquema bàsic d'una base de dades, incloent-hi les taules, les seves columnes, claus rimàries i foranes, i també els disparadors (i les claus úniques) necessaris per a garantir les restriccions de cardinalitat de les associacions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Résumé: Le présent ouvrage propose une histoire de l'Erétrie moderne, de la redécouverte du site antique au projet urbanistique de 1834 pour une ville nouvelle destinée à accueillir les réfugiés de l'île de Psara - anéantie en 1824 par les Ottomans - et au développement urbain d'Erétrie/Nea Psara au XIXe et au XXe siècles. Le nom d'Erétrie englobe trois couches historiques distinctes: la cité antique, la ville néoclassique, dessinée par l'architecte allemand Eduard Schaubert (1804-1860), et le village moderne, issu de son projet. Chacune de ces strates - vestiges antiques, tissu urbain néoclassique et constructions plus récentes - est perceptible au sein de cet ensemble urbain et se trouve en relation constante avec les autres. L'exposé des recherches archéologiques - depuis la redécouverte du site antique par Ciriaco de' Pizzicolli d'Ancona (Cyriaque d'Ancône) en 1436 déjà, puis de manière systématique par des voyageurs-archéologues dès le XIXe siècle - comble une lacune dans l'historiographie de la cité antique. Cette approche met également en lumière la relation étroite entre archéologie et urbanisme au XIXe siècle. Si l'exploration de la Grèce avait été jusqu'à son indépendance en 1827 essentiellement le fait des archéologues, des historiens et des philologues, après cette date, des géologues, des ingénieurs et des topographes travaillant pour le développement économique du jeune Etat se mirent également à parcourir le pays, le regard tourné non plus seulement vers l'Antiquité, mais aussi vers l'avenir. L'histoire de la redécouverte d'Erétrie permet ainsi d'éclairer divers aspects liés à la gestation de l'Etat grec. Le projet conçu en 1834 par Ecluard Schaubert de ville néoclassique superposée aux ruines de la cité antique d'Erétrie s'inscrit dans un réseau de créations de villes nouvelles et de modernisations de villes existantes par le nouvel Etat grec, qui cherchait à fonder sa légitimité et son identité, après la domination ottomane, sur les valeurs idéales (ou idéalisées) de l'Antiquité classique. Dans le projet de développement urbain d'Erétrie, la relation étroite entre archéologie et urbanisme et, par conséquent, la référence à l'Antiquité sont évidentes: Eduard Schaubert commença par tracer sur son plan toutes les ruines antiques, dressant ainsi l'état des connaissances archéologiques du site. Sur cette base, l'architecte conçut la ville néoclassique en y incluant les principales ruines, qui devaient servir de repères visuels et qui concrétisaient ainsi le lien idéologique de la monarchie absolue avec l'Antiquité. A Erétrie, deux perspectives principales reliaient le port à l'acropole et l'Ecole navale au théâtre antique. L'intégration de ruines antiques dans un projet urbanistique avait été réalisée par Stamatios Kleanthes et Eduard Schaubert en 1831-1832 dans le plan de l'Athènes moderne, avant que celle-ci n'ait été promue capitale de la Grèce. Les deux architectes ont ainsi anticipé le caractère idéal d'Athènes dans le processus de gestation de l'Etat grec. L'importance de ce plan et de celui qu'ifs ont établi sur le même modèle pour le Pirée a été reconnue par les historiens de l'urbanisme. En revanche, le plan d'Erétrie, qui suit pourtant les mêmes principes, n'a été que partiellement étudié. Cette monographie montre que le projet d'Erétrie était le plus abouti des trois, qui tous se caractérisent par un système de routes rayonnant depuis le siège du gouvernement (résidences royales à Athènes et au Pirée, mairie à Erétrie). Cet éventail de rues ou u patte d'oie» embrasse à Athènes l'acropole et au Pirée fa baie du port, alors qu'a Erétrie il est double, axé en raison de la topographie sur l'acropole et sur Pa baie du port. Cette double patte d'oie crée ainsi le lien idéologique avec l'Antiquité et témoigne, par son ouverture sur le port, de l'essor économique souhaité par le gouvernement. Le plan d'Erétrie représente de manière exemplaire l'urbanisme programmatique de la Grèce sous Othon ler (1832-1862). L'ouvrage s'intéresse ensuite à la réalisation du projet de Schaubert, dont la mise en oeuvre n'a pas répondu aux attentes du Gouvernement. Le faible développement d'Erétrie s'explique principalement par le surdimensionnement du projet, des finances publiques modestes, la malaria endémique et une politique économique inadaptée aux traditions commerciales des Psariotes. Les lenteurs dans la réalisation du projet et même des régressions au cours du XIXe siècle et au début du XXe siècle, puis l'urbanisation accélérée d'Erétrie à partir des années 1960, ont eu pour conséquence que les historiens de l'urbanisme et les urbanistes ont sous-estimé, voire ignoré la valeur historique de ce concept Cependant, l'exécution du projet néoclassique s'est poursuivie de manière continue et des références au plan de Schaubert peuvent être observées dans l'aménagement récent de la localité aujourd'hui encore. Ainsi, des arbres ont été plantés dans les années 1960 le long de l'enceinte urbaine antique, à l'emplacement où Schaubert avait prévu la création d'une promenade arborée. Au centre d'Erétrie, là où l'agora principale aurait dû être aménagée, une grande place publique servant au marché hebdomadaire a été créée. Dans le quartier oriental, une petite église dédiée à la Pan hagia Paravouniotissa a été construite en 2001 sur la parcelle où Schaubert en avait prévue une. D'importants éléments des projets de Schaubert, qui ne sont actuellement plus guère perceptibles à Athènes et au Pirée, le sont toujours à Erétrie. Les espaces verts, par exemple, occupent une place importante dans le domaine privé: malgré la densification du tissu urbain, des parcelles caractéristiques contiennent encore des maisons isolées d'un ou de deux niveaux côté rue, avec un grand jardin à l'arrière, séparé des parcelles voisines par un mur en pierre ou en brique crue. Erétrie mérite donc une reconnaissance plus considérable dans l'histoire de l'urbanisme, puisqu'elle contribue à faire mieux comprendre les projets de ses deux villes soeurs. L'étude du projet urbanistique est complétée par une approche typologique des constructions néoclassiques d'Erétrie qui souligne encore la valeur historique de cet ensemble. Comme la plupart des édifices sont, menacés de démolition, à l'exception d'un petit nombre d'entre eux qui bénéficient d'un bon entretien, un inventaire photographique des constructions d'Erétrie datant du XIXe et du début du XXe siècle a été constitué entre 1994 et 2005, complété par des photographies anciennes. Il en ressort que les formes et les techniques de construction sont représentatives de l'architecture privée à l'époque de la création de l'Etat. Enfin, le plan directeur d'Erétrie, réalisé en 1975-1976 par un séminaire du Département d'architecture de l'Ecole polytechnique fédérale de Zurich avec l'appui de l'Ecole suisse d'archéologie en Grèce, est publié ici intégralement pour la première fois. Le présent ouvrage rend ses lettres de noblesse à un ensemble urbain néoclassique, certes modeste, mais issu d'un projet urbanistique ambitieux, témoin significatif du programme politique du nouvel Etat grec. SUMMARY Translated by William Eisler This book gives an account of the history of modern Eretria. It encompasses the rediscovery of the ancient city, the 1834 urban plan for the new town designed to accommodate the refugees from the island of Psara - destroyed by the Ottomans in 1824 - and also the urban development of Eretria/Nea Psara in the 19th and 20th centuries. The name Eretria carries a rich heritage: the ancient city, the neoclassical town designed by the Germen architect Eduard Schaubert (1804-1860), and the modern village. These three distinct historical layers ancient ruins, neoclassical plan and more recent constructions - can be seen within this urban area and are interlinked with each other. The account of the archeological investigations fills a gap in the historiography of the ancient city. This started with the early rediscovery of the ancient site by Ciriaco de'Pizzicolli d'Ancona in 1436, and was followed by systematic research by travellers/ archeologists from the 19th century onward. Furthermore, this shows the close relationship between archeology and urbanism in the 19th century. The exploration of Greece prier te its independence in 1827 was mainly red by archeologists, historians and philologists. Subsequently, geologists, engineers and topographers working for the young state's economic development travelled across the country, with their attention focused not only on Antiquity but are on the future. The history of Eretria's rediscovery gives new insights on various aspects related to the development of the Greek state. In 1834, Eduard Schaubert's project, planning a neoclassical town built upon the ancient Eretria, took place alongside the development of other new cities and the modernization of existing ones du ring the Ottoman domination. By doing so, the new Greek state wanted to build its legitimacy and identity, based upon the ideal (or idealized) values of Classical Antiquity. In the urban development of Eretria, the close connection between archeology and urbanism, and the reference to Antiquity, are obvious. Eduard Schaubert began by tracing on his plan ail of the ancient ruins, thus showing the knowledge of the archeological site at that time. On this basis, the architect planned the neoclassical town, incorporating the principal ruins which were to serve as visual references embodying the ideological link between Antiquity and King Otto's absolute monarchy. In Eretria, two principal visual axes linked the port to the acropolis and the Naval School to the ancient theatre. The integration of ancient ruins in an urban project had already been achieved by Stamatios Kleanthes and Eduard Schaubert in 1831-1832 in their plan for modern Athens, before it became the capital of Greece. The two architects had therefore anticipated the ideal character of Athens at the beginning of the Greek state. The importance of this plan and that of Piraeus (designed along the same model) has long been recognized by urban historians. By contrast, the plan of Eretria based open the same principles has been only partly studied. This book explains clearly that the Eretria project was the most elaborate. The three cities are characterized by a system of roads radiating from the seat of government (the royal residences in Athens and Piraeus, the town hall in Eretria). This fan-like arrangement of streets includes the Acropolis in Athens and the harbour in Piraeus, whereas in Eretria it is twofold, orientated towards the acropolis and the harbour on account of the topography. This double fan-like arrangement shows the ideological link with Antiquity and, with its opening onto the harbour, the government's desire for economic development. The plan of Eretria is a typical ex- ample of the programmatic urbanism of Greece under Otto I (1832-1862). The book discusses the completion of Schaubert's project, which was not fully carried out as expected by the government. The poor development of Eretria can be explained primarily by the excessive scale of the project, the modest public finances, the endemic malaria and an economic policy unsuitable to the commercial traditions of the Psariotes. Delays, even regressions in the implementation of the project in the course of the 19th and the beginning of the 20th centuries, followed by the growing urbanization of Eretria starting in the 1960's, led urban historians and town planners to underestimate or even to ignore the historical value of this concept. Nevertheless, the neoclassical project was carried out steadfastly, and references to the Schaubert plan can still be seen in the modern layout of the town. Trees were planted in the 1960's all along the circumference of the ancient city, where Schaubert had planned a tree-lined promenade. A big public square serving as a weekly market place was created in the centre of Eretria, where the principal agora had been originally planned. In 2001 a small church dedicated to the Panhagia Paravouniotissa was built on a plot of land in the eastern district, where this had been intended by Schaubert. Important elements of Schaubert's projects, which are barely perceptible in modern-day Athens and Piraeus, remain visible in Eretria. Green areas, for example, occupy a significant place within the private properties. In spite of the urban densification, characteristic plots still include isolated houses of one or two stories facing the street, with large gardens in the rear, separated from neighbours by stone or mudbrick walls. Eretria therefore deserves a more prominent position in the history of urbanism, as it contributes to a better understanding of ifs two sister cities. The study of the urban project is enriched by a typological approach to the neoclassical constructions of Eretria, underlining once again the historical value of this heritage. Since only a small number of the buildings have benefited from good maintenance and the greater part is threatened with demolition, a photographic inventory of the constructions of Eretria dating from the 19tIt and early 20th centuries was produced between 1994 and 2005, supplemented by old photographs. This documentation clearly shows that the forms and techniques of construction are characteristic of private architecture at the beginning of modern Greece. Finally, the master plan of Eretria drafted in 1975-1976 by a seminar of the Department of Architecture of the Swiss Federal Institute of Technology, Zurich, with the support of the Swiss School of Archeology in Greece, is published here in full for the first time. This book gives credit to a neoclassical urban heritage which, although modest in scale, derives from an ambitious project that embodies the political programme of the new Greek state. ΠΕΡΙΛΗΨΗ Μετάβραση Ελενή Δημητρακοπούλου Η παρούσα εργασία προτείνει μια. ιστορία της σύγχρονης πόλης της Ερέτριας, ξεκινώντας από την αποκάλύψη του αρχαιολογικού χώρου, περνώντας από την σύνταξη, το 1834, του ρυμοτομικού σχεδίου για μια νέα. πόλη που σκοπό είχε να υποδεχθεί τούς πρόσφυγες από τα Ψαρά. - που καταστράφηκαν ολοσχερώς το 1824 από τούς Οθωμανούς - και εξετάζοντας τέλος την πολεοδομική εξέλιξη της Ερέτριας/Νέων Ψαρών κατά τον 19° και τον 20° αι. Πίσω από το όνομα της Ερέτριας κρύβονται τρία διαφορετικά. ιστορικά στρώματα,: η αρχαία πόλη, η νεοκλασική πόλη πού σχεδιάστηκε από τον γερμανό αρχιτε κτονα "Εντοναρντ Σάουμπερτ (1804-1860) και η σύγχρονη πόλη που κτίστηκε πάνω στά. σχέδια του τελευταίού. Κάθε ένα από αυτά τα στρώματα - αρχαία κατάλοιπα. νεοκλασικός πολεοδομικός ιστός και νεώτερα κτίσματα - γίνεται αντιληπτό στο πλαίσιο αυτού του πολεοδομικού συνόλου και βρίσκεται σε άμεση σχέση με τα άλλα δύο. Ηπαρονσίαση των αρχαιολογικών ερευνών, που ξεκινούν το 1436 με την αποκάλυψη τον αρχαιολογικού χώρού από τον Ciriaco de' Pizzicolli d'Ancona (Κυριάκος ο Αγκωνίτης) και συνεχίζονται συστηματικά. από περιηγητές_αρχαιολόγούς κατά το 19° αι., καλύπτει ένα κενό στην ιστοριογραφία της έρεύνας της αρχαίας πύλης. Η προσέγγιση αυτή φωτίζει επίσης τη στενή σχέσημεταξύαρχαιολογίας και πολεοδομίας κατά τον 190 αι. Αν η εξερεύνηση της Ελλάδος, ως την ανεξαρτησία της το 1827, ήταν έργο κνρϊως αρχαιολόγων, ιστορικών και φιλολόγων, μετά από αυτήν την χρονολογία., γεωλόγοι, μηχανικοί και τοπογράφοι που εργάζονταν για την οικονομική ανάπτυξη τον νεοσύστατου Ελληνικού Κράτούς, άρχισαν επίσης να περιτρέχονν όλη την χώρα., με το βλέμμα. στραμμένο όχι μόνο προς την Αρχαιότητα, αλλά και προς το μέλλον. Η ιστορία της αποκάλυψης της Ερέτριας φωτίζει έτσι και διάφορες όψεις που συνδέονται με την γένεση του Ελληνικού Κράτους. Το 1834, υ 'Εντοναρντ Σάουμπερτ εκπόνησε το σχέδιο μιας νεοκλασικής πόλης που Θα επικαθόταν στα; ερείπια. της αρχαίας Ερέτριας?το έργο εντάσσεται στο δίκτυο δημιουργίας νέων πόλεων και εκσυγχρονισμού των υπαρχυυσών από το νεοσύστατο Ελληνικό Κράτος. το οποίο, μετά την Οθωμανική κυριαρχία, επεδίωκε να Θεμελιώσει την νομιμότητα και την ταυτότητά του πάνω στις ιδανικές ή εξιδανικευμένες αξίες της κλασικής αρχαιότητας. Στο σχέδιο της πολεοδομικής ανάπτυξης της Ερέτριας, η στενή σχέση μεταξύ αρχαιολογίας και πολεοδομίας και, κατ επέκταση. οι σαφείς αναφορές στην Αρχαιότητα. είναι εμφανείς: ο Εντοναρντ Σάουμπερτ άρχισε σχεδιάζοντας στο τοπογραφικό τον όλα τα αρχαία. ερείπια, καταγράφοντας έτσι τις τότε αρχαιολογικές γνώσεις για, το χώρο. Σε αυτή τη βάση, ο αρχιτέκτονας συνέλαβε την νεοκλασική πόλη εντάσσοντας σε αυτήν τα κυριότερα αρχαία μνημεία, τα οποία χρησίμευαν ως οπτικά σημεία αναφοράς, ενώ συγχρόνως υλοποιούσαν την ιδεολογική σχέση της απόλύτης μοναρχίας με την Αρχαιότητα. Στην Ερέτρια, δυο βασικοί άξονες συνέδεαν το λιμάνι με την Ακρόπολη και τη Ναυτική Σχολή με το Αρχαίο Θέατρο. Η ένταξη αρχαίων ερειπίων σε ένα πολεοδομικό σχέδιο είχε ήδη πραγματοποιηθεί από τούς Σταμάτιο Κλεάνθη και'Εντουαρντ Σάουμπερτ στα 1831-1832, στον σχεδιασμό της νέας Αθήνας, πριν αυτή ανακηρυχθεί σε πρωτεύουσα. της Ελλάδος. Οι δυο αρχιτέκτονες προεξόφλησαν έτσι τον συμβολικό χαρακτήρα της Αθήνας στην διαδικασία. γένεσης του Ελληνικού Κράτούς, Η σημασία αυτού τον σχεδίου καθώς και εκείνου που συνέταξαν, πάνω στο ίδιο πνεύμα, για τον Πειραιά έχει αναγνωριστεί από τους σύγχρονούς πολεοδόμους. Αντίθετα, το σχέδιο της Ερέτριας, παρ όλο που ακολούθεί τις ίδιες αρχές, μελετήθηκε πολύ λίγο. Η παρούσα μονογραφία δείχνει ότι το σχέδιο της Ερέτριας ήταν το πιο ολοκληρωμένο από τα τρία. Βασικό χαρακτηριστικό των σχεδίων αυτών είναι ένα σύστημα οδών που αναπτύσσονται ακτινωτά από το κέντρο εξουσίας (βασιλική κατοικία στην Αθήνα και τον Πειραιά, δημαρχείο στην Ερέτρια). Αυτή η ακτινωτή διάταξη των οδών συμπεριλαμβάνει στην Αθήνα την Ακρόπολη και στον Πειραιά το λιμάνι, ενώ στην Ερέτρια είναι αμφίροπη, προσανατολισμένη, λόγω της τοπογραφίας, προς την ακρόπολη αλλά και προς τον όρμο του λιμανιού. Αυτή η διπλή ακτινωτή διάταξη από τη μια δημιούργεί τον ιδεολογικό δεσμό ιιε την Αρχαιότητα, ενώ από την άλλη τονίζει, με το άνοιγμά της προς το λιμάνι, την οικονομική άνθηση της πόλης που επιθυμούσε η κεντρική εξουσία. Τα σχέδιο της Ερέτριας αποτελεί αντιπροσωπευτικό δείγμα της προγραμματικής πολεοδομίας της Ελλάδος κατά τα, χρόνια της Βασιλείας του "Οθωνος (1832-1862). Η υλοποίηση του σχεδίου του Σάουμπερτ δεν ανταποκρίθηκε στις προσδοκίες της κυβέρνησης. Η μικρή ανάπτύξη της Ερέτριας οφείλεται κυρίως στούς ανεδαφικούς, μεγαλεπί βολονς στόχους του σχεδίού, στα μέτρια δημόσια οικονομικά, στην ενδημική ελονοσία λόγω των υφισταμένων ελών καθώς και σε μια, οικονομική πολιτική που ήταν ξένη στις εμπορικές παραδόσεις των Ψαριανών. Οι αργοί ρυθμοί της πραγματοποίησης του σχεδίού και μάλιστα κάποιες περικοπές τον κατά τη διάρκεια τον 19°ν και στις αρχές του 2θ αι., και στη συνέχεια η ταχεία πολεοδομική εξέλιξη της Ερέτριας από τη δεκαετία του 1960, είχαν σαν συνέπεια να υποτιμηθεί ή κατ να αγνοηθεί η ιστορική αξία του πολεοδομικού σχεδίου από τους ιστορικούς της πολεοδομίας. Ωστόσο, η εκτέλεση τον νεοκλασικού σχεδίου ακολουθήθηκε με συνέπεια, ενώ αναφορές στο σχέδιο του Σάουμπερτ μπορούν να παρατηρηθούν, ακόμα. και σήμερα. στις νεώτερες διευθετήσεις τον χώρου. Ετσι, στη δεκαετία του 1960, κατά μήκος του αρχαίού τείχούς της πόλης φυτεύθηκαν δέντρα, στη Θέση όπού ο Σάουμπερτ είχε προβλέψει τη δημιουργία ενός δεντροφυτεμένου περιπάτου. Στο κέντρο της Ερέτριας, εκεί όπου Θα έπρεπε να διαμορφωθεί η κύρια αγορά της πόλης, δημιουργήθηκε μια μεγάλη δημόσια πλατεία όπου γίνεται η εβδομαδιαία λαϊκή αγορά. Στην ανατολική συνοικία, χτίστηκε, το 2001, μια μικρή εκκλησία αφιερωμένη στην Παναγία, την Παραβοννιώτισσα, στο οικόπεδο όπου ο Σάουμπερτ είχε προβλέψει μια εκκλησία. Σημαντικά στοιχεία των σχεδίων του Σάουμπερτ, που δεν γίνονται πια καθόλου αντιληπτά στην ΑΘήνα και στον Πειραιά, μπορούν να παρατηρηθούν στην Ερέτρια. Το πράσινο, για παράδειγμα, καταλαμβάνει σημαντική Θέση τον ιδιωτικού χώρου: παρά την πύκνωση τον πολεοδομικού ιστού, χαρακτηριστικά είναι τα οικόπεδα που περιέχούν ακόμα μεμονωμένα σπίτια, μονώροφα ή διώροφα, επί προσώπου οδού, με ένα μεγάλο κήπο στο πίσω μέρος, που χωρίζονται από τα, γειτονικά οικόπεδα με ένα μαντρότοιχο πέτρινο ή από ωμές πλίνθους. Η Ερέτρια οφείλει λοιπόν να λάβει τη Θέση που της αξίζει στην ιστορία της Νεοελληνικής πολεοδομίας, εφόσον συμβάλλει στην καλύτερη κατανόηση των σχεδίων των δυο αυτών αδελφών πόλεων. Η μελέτη τον πολεοδομικού σχεδίού συμπληρώνεται από μια τυπολογική προσέγγιση των νεοκλασικών κτηρίων της Ερέτριας, η οποία υπογραμμίζει ακόμα περισσότερο την ιστορική αξία του συνόλου αυτού. Καθώς τα περισσότερα κτήρια απειλούνται με κατεδάφιση, με εξαίρεση λίγα από αυτά που είχαν την τύχη να συντηρούνται σωστά, μεταξύ 1994 και 2005, καταρτίστηκε ένα φωτογραφικό αρχείο των κτιρίων της Ερέτριας που χρονολογούνται στο 19° και στις αρχές τον 200υ αι., συμπληρωμένο και από παλιές φωτογραφίες. Από αυτό προκύπτει ότι οι μορφές κατ οι τεχνικές δομήσεως είναι αντιπροσωπευτικές της ιδιωτικής αρχιτεκτονικής κατά την εποχή της σύστασης τον Ελληνικού Κράτους. Τέλος, το γενικό ρυθμιστικό σχέδιο της Ερέτριας, που εκπονήθηκε στα 1975-1976 από μελετητική ομάδατης σχολής Αρχιτεκτόνων του Ομοσπονδιακού Πολυτεχνείου της Ζυρίχης, με την υποστήριξη της Ελβετικής Αρχαιολογικής Σχολής στην Ελλάδα., δημοσιεύεται εδώ για πρώτη φορά στην πλήρη μορφή του. Η παρούσα εργασία, αφορά ένα νεοκλασικό πολεοδομικό σύνολο, ταπεινό ίσως, αλλά αποτέλεσμα ενός φιλόδοξου πολεοδομικού σχεδιασμού, ο οποίος αποτελεί σημαντικό μάρτυρα του πολιτικού προγράμματος τον νεοσύστατού Ελληνικού Κράτους.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tässä opinnäytetyössä oli tavoitteena teräsrakenteiden ja putkiston suunnittelu ja hankinta sekä niiden asennuksen valvonta Kemira Kemwater Service Oy:n ja Nordic Aluminiumin Oyj:n vedenkäsittelylaitokseen. Uusien teräsrakenteiden ja putkistojen suunnittelussa tuli hyödyntää olemassa olevia rakenteita, jos se oli mahdollista. Teräsrakenteisiin kuuluivat hoitotaso ja keräyssuppilo. Valmiin hoitotason päälle asennettiin suotopuristin, josta putoava kiintoaine ohjataan keräyssuppilon avulla ruuvikuljettimelle, joka siirtää kiintoaineen siirtolavoille. Hoitotasolta käytetään ja huolletaan suotopuristinta sekä putkistoa. Materiaaleina käytettiin Fe37B ja ruostumatonta terästä. Teräsrakenteiden HEB-palkit valittiin laskettujen taipumien perusteella. HEB-palkkien taipumien minimoimiseksi lisättiin vinotukija. Hoitotason suunnittelussa hyödynnettiin olemassa olevia HEB-palkkeja. Hoitotason elementteinä käytettiin teräksestä valmistettuja kuumasinkittyjä ritilöitä. Hoitotason kahteen jalkaan mallinnettiin säätövarat, jotta hoitotason toinen pää saadaan samaan korkoon kiinteästi olevaan päähän nähden. Jalkojen säätö toteutettiin kahdella M20 x 120- ruuvilla per jalka. Putkisto layout mallinnettiin PI-kaavion mukaiseksi ja siinä oli venttiilit mallinnettuna. Työpiirustuksien valmistuttua suoritettiin tarjouskyselyt urakoitsijoille. Teräsrakenteet ja putkiston asensivat kaksi eri urakoitsijaa. Asennusvalvoja oli paikalla lähes koko asennusajan vastaamassa työturvallisuudesta ja asennuksen sujuvuudesta. Urakoiden valmistuttua teräsrakenteille ja putkistolle suoritettiin luovutustarkastukset. Projekti pysyi aikataulussa ja kustannusarviossa suunnittelun sekä valvonnan osalta.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tämä insinöörityö on tehty ABB OY:n Pitäjänmäen tehtaalle ja käsittelee HX-roottorivalmistuksen uuden layoutin suunnittelua. Työssä tarkastellaan läpimenoajan lyhentämistä ja kapasiteetin nostoa sekä varastointia ja materiaalivirtauksia. Työn pääpaino on kuitenkin uuden tuotanto-layoutin suunnittelussa. Suunnittelu aloitettiin projektin tunnusluvuista. Lisäksi ratkaisuista keskusteltiin osaston työntekijöiden kanssa. Työn tuloksena syntyi kolme layout-vaihtoehtoa. Layout-suunnitelmassa keskeneräinen tuotanto pyritään saamaan mahdollisimman pieneksi ja karsimaan takaisinpäin suuntautuvaa työskentelyä. Just-in-time-periaatteen mukainen ohjaus parantaa osastolla tarvittavien materiaalien hallintaa. Lisäksi tavaroiden setittäminen vähentää hyllytilan tarvetta ja helpottaa siisteyden ylläpitoa. Asetettuihin tavoitteisiin pääseminen edellyttää uusia konehankintoja.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objetivou-se descrever processo de desenvolvimento da cartilha virtual sobre autoexame ocular para pessoas com HIV/aids. A proposta metodológica seguiu as cinco etapas preconizadas por Falkembach: análise e planejamento, modelagem, implementação, avaliação e distribuição. A adequação da versão impressa para virtual requereu a construção de um vídeo tutorial, agregação de fotos ilustrativas para visualização de possíveis alterações oculares e ferramenta de interatividade com demonstração do resultado do exame ao usuário. Na avaliação inicial do material, foram diagnosticadas falhas no layout. Assim, comandos foram recolocados, unificados, dispostos em local de fácil visualização e foi feita a adequação da linguagem. Considera-se possível promover aproximação do usuário com métodos de prevenção na área da saúde ocular por meio de cartilha virtual, contribuindo para desenvolvimento de habilidades e divulgação do autoexame.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objective The article describes the steps in producing and validating an educational booklet for childbirth companions. Method Methodological study conducted in 2011 consisting of the following steps: situational assessment; establishing brochure content; content selection and referencing; drafting the text; design of illustrations; layout; consultation of specialists; consultation of target audience; amendments; proofreading; evaluation using the Flesch Reading Ease Formula. The topics portrayed the sequence of events involving support from gestation to the postpartum period. Results The concordance rate among companions was greater than or equal to 81.8% for the topics organisation, writing style, presentation and motives. The overall Content Validity Index of the booklet was 0.94. The booklet was classified as easy reading or very easy reading according to the results of the Flesch Reading Ease Formula. Conclusion The presentation and content of the manual were validated for use with the target audience by the specialists and representatives of the target audience.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Calceology is the study of recovered archaeological leather footwear and is comprised of conservation, documentation and identification of leather shoe components and shoe styles. Recovered leather shoes are complex artefacts that present technical, stylistic and personal information about the culture and people that used them. The current method in calceological research for typology and chronology is by comparison with parallel examples, though its use poses problems by an absence of basic definitions and the lack of a taxonomic hierarchy. The research findings of the primary cutting patterns, used for making all leather footwear, are integrated with the named style method and the Goubitz notation, resulting in a combined methodology as a basis for typological organisation for recovered footwear and a chronology for named shoe styles. The history of calceological research is examined in chapter two and is accompanied by a review of methodological problems as seen in the literature. Through the examination of various documentation and research techniques used during the history of calceological studies, the reasons why a standard typology and methodology failed to develop are investigated. The variety and continual invention of a new research method for each publication of a recovered leather assemblage hindered the development of a single standard methodology. Chapter three covers the initial research with the database through which the primary cutting patterns were identified and the named styles were defined. The chronological span of each named style was established through iterative cross-site sedation and named style comparisons. The technical interpretation of the primary cutting patterns' consistent use is due to constraints imposed by the leather and the forms needed to cover the foot. Basic parts of the shoe patterns and the foot are defined, plus terms provided for identifying the key points for pattern making. Chapter four presents the seventeen primary cutting patterns and their sub-types, these are divided into three main groups: six integral soled patterns, four hybrid soled patterns and seven separately soled patterns. Descriptions of the letter codes, pattern layout, construction principle, closing seam placement and list of sub-types are included in the descriptions of each primary cutting pattern. The named shoe styles and their relative chronology are presented in chapter five. Nomenclature for the named styles is based on the find location of the first published example plus the primary cutting pattern code letter. The named styles are presented in chronological order from Prehistory through to the late 16th century. Short descriptions of the named styles are given and illustrated with examples of recovered archaeological leather footwear, reconstructions of archaeological shoes and iconographical sources. Chapter six presents documentation of recovered archaeological leather using the Goubitz notation, an inventory and description of style elements and fastening methods used for defining named shoe styles, technical information about sole/upper constructions and the consequences created by the use of lasts and sewing forms for style identification and fastening placement in relation to the instep point. The chapter concludes with further technical information about the implications for researchers about shoemaking, pattern making and reconstructive archaeology. The conclusion restates the original research question of why a group of primary cutting patterns appear to have been used consistently throughout the European archaeological record. The quantitative and qualitative results from the database show the use of these patterns but it is the properties of the leather that imposes the use of the primary cutting patterns. The combined methodology of primary pattern identification, named style and artefact registration provides a framework for calceological research.