845 resultados para key management
Resumo:
Sustaining soil fertility is essential to the prosperity of many households in the mid-hills of Nepal, but there are concerns that the breakdown of the traditional linkages between forest, livestock, and cropping systems is adversely affecting fertility. This study used triangulated data from surveys of households, discussion groups, and key informants in 16 wards in eastern and western Nepal to determine the existing practices for soil fertility management, the extent of such practices, and the perception of the direction of changes in soil fertility. The two principal practices for maintaining soil fertility were the application of farmyard manure (FYM) and of chemical fertilizer (mainly urea and diammonium phosphate). Green manuring, in-situ manuring, slicing terrace risers, and burning plant residues are rarely practiced. FYM usage was variable with more generally applied to khet land (average 6053 kg fresh weight manure ha(-1)) than to bari land (average 4185 kg fresh weight manure ha-1) with manure from goats and poultry preferred above that from cows and buffaloes. Almost all households (98%) apply urea to khet land and 87% to bari land, with 45% applying diammonium phosphate to both types of land. Application rates and timings of applications varied considerably both within and between wards suggesting poor knowledge transfer between the research and farming communities. The benefits of chemical fertilizers in terms of ease of application and transportation in comparison with FYM, were perceived to outweigh the widely reported detrimental hardening of soil associated with their continued usage. Among key informants, FYM applied in conjunction with chemical fertilizer was the most popular amendment, with FYM alone preferred more than chemical fertilizer alone - probably because of the latter's long-term detrimental effects. Key informant and householder surveys differed in their perception of fertility changes in the last decade probably because of differences in age and site-specific knowledge. All key informants felt that fertility had declined but among households, only about 40% perceived a decline with the remainder about evenly divided between no change and an increase. Householders with small landholdings (< 0.5 ha) were more likely to perceive increasing soil fertility while those with larger landholdings (> 2 ha) were more likely to perceive declining fertility. Perceived changes in soil fertility were not related to food self-sufficiency. The reasons for the slow spread of new technologies within wards and the poor understanding of optimal use of chemical fertilizers in conjunction with improved quality FYM may repay further investigation in terms of sustaining soil fertility in this region.
Resumo:
This paper describes an assessment of the nitrogen and phosphorus dynamics of the River Kennet in the south east of England. The Kennet catchment (1200 km(2)) is a predominantly groundwater fed river impacted by agricultural and sewage sources of nutrient (nitrogen and phosphorus) pollution. The results from a suite of simulation models are integrated to assess the key spatial and temporal variations in the nitrogen (N) and phosphorus (P) chemistry, and the influence of changes in phosphorous inputs from a Sewage Treatment Works on the macrophyte and epiphyte growth patterns. The models used are the Export Co-efficient model, the Integrated Nitrogen in Catchments model, and a new model of in-stream phosphorus and macrophyte dynamics: the 'Kennet' model. The paper concludes with a discussion on the present state of knowledge regarding the water quality functioning, future research needs regarding environmental modelling and the use of models as management tools for large, nutrient impacted riverine systems. (C) 2003 IMACS. Published by Elsevier B.V. All rights reserved.
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.
Resumo:
The shamba system involves farmers tending tree saplings on state-owned forest land in return for being permitted to intercrop perennial food crops until canopy closure. At one time the system was used throughout all state-owned forest lands in Kenya, accounting for a large proportion of some 160,000 ha. The system should theoretically be mutually beneficial to both local people and the government. However the system has had a chequered past in Kenya due to widespread malpractice and associated environmental degradation. It was last banned in 2003 but in early 2008 field trials were initiated for its reintroduction. This study aimed to: assess the benefits and limitations of the shamba system in Kenya; assess the main influences on the extent to which the limitations and benefits are realised and; consider the management and policy requirements for the system's successful and sustainable operation. Information was obtained from 133 questionnaires using mainly open ended questions and six participatory workshops carried out in forest-adjacent communities on the western slopes of Mount Kenya in Nyeri district. In addition interviews were conducted with key informants from communities and organisations. There was strong desire amongst local people for the system's reintroduction given that it had provided significant food, income and employment. Local perceptions of the failings of the system included firstly mismanagement by government or forest authorities and secondly abuse of the system by shamba farmers and outsiders. Improvements local people considered necessary for the shamba system to work included more accountability and transparency in administration and better rules with respect to plot allocation and stewardship. Ninety-seven percent of respondents said they would like to be more involved in management of the forest and 80% that they were willing to pay for the use of a plot. The study concludes that the structural framework laid down by the 2005 Forests Act, which includes provision for the reimplementation of the shamba system under the new plantation establishment and livelihood improvement scheme (PELIS) [It should be noted that whilst the shamba system was re-branded in 2008 under the acronym PELIS, for the sake of simplicity the authors continue to refer to the 'shamba system' and 'shamba farmers' throughout this paper.], is weakened because insufficient power is likely to be devolved to local people, casting them merely as 'forest users' and the shamba system as a 'forest user right'. In so doing the system's potential to both facilitate and embody the participation of local people in forest management is limited and the long-term sustainability of the new system is questionable. Suggested instruments to address this include some degree of sharing of profits from forest timber, performance related guarantees for farmers to gain a new plot and use of joint committees consisting of local people and the forest authorities for long term management of forests.
Resumo:
This document provides guidelines for fish stock assessment and fishery management using the software tools and other outputs developed by the United Kingdom's Department for International Development's Fisheries Management Science Programme (FMSP) from 1992 to 2004. It explains some key elements of the precautionary approach to fisheries management and outlines a range of alternative stock assessment approaches that can provide the information needed for such precautionary management. Four FMSP software tools, LFDA (Length Frequency Data Analysis), CEDA (Catch Effort Data Analysis), YIELD and ParFish (Participatory Fisheries Stock Assessment), are described with which intermediary parameters, performance indicators and reference points may be estimated. The document also contains examples of the assessment and management of multispecies fisheries, the use of Bayesian methodologies, the use of empirical modelling approaches for estimating yields and in analysing fishery systems, and the assessment and management of inland fisheries. It also provides a comparison of length- and age-based stock assessment methods. A CD-ROM with the FMSP software packages CEDA, LFDA, YIELD and ParFish is included.
Resumo:
The effectiveness of development assistance has come under renewed scrutiny in recent years. In an era of growing economic liberalisation, research organisations are increasingly being asked to account for the use of public funds by demonstrating achievements. However, in the natural resources (NR) research field, conventional economic assessment techniques have focused on quantifying the impact achieved rather understanding the process that delivered it. As a result, they provide limited guidance for planners and researchers charged with selecting and implementing future research. In response, “pathways” or logic models have attracted increased interest in recent years as a remedy to this shortcoming. However, as commonly applied these suffer from two key limitations in their ability to incorporate risk and assess variance from plan. The paper reports the results of a case study that used a Bayesian belief network approach to address these limitations and outlines its potential value as a tool to assist the planning, monitoring and evaluation of development-orientated research.
Resumo:
Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.
Resumo:
A proper method to assess contractor competitiveness is important both for assisting clients in the selection of proper contractors and for assisting contractors in the development of more competitive bidding strategies. Previous studies have identified various indicators for assessing contractor competitiveness, and several assessment methods have been introduced. Nevertheless, these studies are limited because they are unable to tell which indicators are more important in different market environments. This paper identifies the key competitiveness indicators �KCIs� for assessing contractor competitiveness in the Chinese construction market. An index value is used to indicate the relative significance of various competitiveness indicators based on which KCIs are identified. The data applied in this study are from a survey of the construction industry in mainland China. The research findings provide valuable information for both existing businesses and the construction professionals who plan to compete for construction works in the Chinese market. The study provides useful references for further studies that compare the KCIs used in the Chinese construction industry and those used in other construction industries.
Resumo:
Consideration of the quality, relevance and utility of research in educational leadership and management has been a growing concern of researchers, policy-makers and practitioners, but there is little agreement about its current state or priorities for development. The article reflects on the key criticisms that have been made of research in educational leadership and management in this issue, and elsewhere. It considers how we might begin to devise better ways of understanding its audiences, judging its quality and identifying priorities for the future. It argues that the research reflects its capture by those with particular interests or values, and impacts in ways which are complex and indirect. If educational leadership and management research is to be secure in its perceived value and contribution in the future, several developments are needed, including a greater emphasis on interdisciplinarity, an expansion of the range of methodologies, particularly qualtitative studies; and these shifts must be evident in training researchers as well as in the conduct of research.
Resumo:
Identity issues are under-explored in construction management. We provide a brief introduction to the organization studies literature on subjectively construed identities, focusing on discourse, agency, relations of power and identity work. The construction management literature is investigated in order to examine identity concerns as they relate to construction managers centred on (1) professionalism; (2) ethics; (3) relational aspects of self-identity; (4) competence, knowledge and tools; and (5) national culture. Identity, we argue, is a key performance issue, and needs to be accounted for in explanations of the success and failure of projects. Our overriding concern is to raise identity issues in order to demonstrate their importance to researchers in construction management and to spark debate. The purpose of this work is not to provide answers or to propose prescriptive models, but to explore ideas, raise awareness and to generate questions for further programmatic research. To this end, we promote empirical work and theorizing by outlining elements of a research agenda which argues that 'identity' is a potentially generative theme for scholars in construction management.
Resumo:
1. Declines in area and quality of species-rich mesotrophic and calcareous grasslands have occurred all across Europe.While the European Union has promoted schemes to restore these grasslands, the emphasis for management has remained largely focused on plants. Here we focus on restoration of the phytophagous beetles of these grasslands. Although local management, particularly that which promotes the establishment of host plants, is key to restoration success, dispersal limitation is also likely to be an important limiting factor during the restoration of phytophagous beetle assemblages. 2. Using a 3-year multi-site experiment, we investigated how restoration success of phytophagous beetles was affected by hay-spreading management (intended to introduce target plant species), success in restoration of the plant communities and the landscape context within which restoration was attempted. 3. Restoration success of the plants was greatest where green hay spreading had been used to introduce seeds into restoration sites. Beetle restoration success increased over time, although hayspreading had no direct effect. However, restoration success of the beetles was positively correlated with restoration success of the plants. 4. Overall restoration success of the phytophagous beetles was positively correlated with the proportion of species-rich grassland in the landscape, as was the restoration success of the polyphagous beetles. Restoration success for beetles capable of flight and those showing oligophagous host plant specialism were also positively correlated with connectivity to species-rich grasslands. There was no indication that beetles not capable of flight showed greater dependence on landscape scale factors than flying species. 5. Synthesis and applications. Increasing the similarity of the plant community at restoration sites to target species-rich grasslands will promote restoration success for the phytophagous beetles. However, landscape context is also important, with restoration being approximately twice as successful in those landscapes containing high as opposed to low proportions of species-rich grassland. By targeting grassland restoration within landscapes containing high proportions of species-rich grassland, dispersal limitation problems associated with restoration for invertebrate assemblages are more likely to be overcome.
Resumo:
Purpose – Innovation in facilities management (FM) is a complex process as FM is a diverse discipline. This paper aims to use innovation trajectories to explore this complex process through the introduction of a technology innovation in two FM services of security and workspace management. It also aims to consider the discourse of individuals within their trajectory to understand their positions toward the innovation. Design/methodology/approach – A two-year case study was conducted and it was based in an in-house FM department that was part of a financial institution. The specific methods used for the paper were semi-structured interviews with key participants of the project. Critical discourse analysis was used to examine the data. Findings – Individuals who were involved in introducing the technology to the FM department were both internal and external to FM as innovation in FM does not happen in isolation to the organisation. Innovation trajectories were often intertwined or occurred simultaneously during the process of a project which sometimes resulted in conflict. Tensions within the discourse of ownership of the project were particularly apparent as this discourse had a power dimension in driving the project through to implementation. Research limitations/implications – The research is limited by being a single case study so it is not possible to generalise findings but the findings may have resonances with other organisations. Originality/value – The paper presents an original idea about how to understand innovation processes in FM services.
Resumo:
Recent research has suggested that forecast evaluation on the basis of standard statistical loss functions could prefer models which are sub-optimal when used in a practical setting. This paper explores a number of statistical models for predicting the daily volatility of several key UK financial time series. The out-of-sample forecasting performance of various linear and GARCH-type models of volatility are compared with forecasts derived from a multivariate approach. The forecasts are evaluated using traditional metrics, such as mean squared error, and also by how adequately they perform in a modern risk management setting. We find that the relative accuracies of the various methods are highly sensitive to the measure used to evaluate them. Such results have implications for any econometric time series forecasts which are subsequently employed in financial decisionmaking.