998 resultados para Sugar Creek Watershed (Crawford County, Ill.)
Resumo:
v.12:no.2(1956)
Resumo:
v.12:no.4(1956)
Resumo:
v.12:no.1(1956)
Resumo:
v.12:no.3(1956)
Resumo:
n.s. no.30(1995)
Resumo:
38
Resumo:
BACKGROUND: Hypoglycaemia is a poor prognostic indicator in severe malaria. Intravenous infusions are rarely feasible in rural areas. The efficacy of sublingual sugar (SLS) was assessed in a pilot randomized controlled trial among hypoglycaemic children with severe malaria in Mali. METHODS: Of 151 patients with presumed severe malaria, 23 children with blood glucose concentrations < 60 mg/dl (< 3.3 mmol/l) were assigned randomly to receive either intravenous 10% glucose (IVG; n = 9) or sublingual sugar (SLS; n = 14). In SLS, a teaspoon of sugar, moistened with a few drops of water, was gently placed under the tongue every 20 minutes. The child was put in the recovery position. Blood glucose concentration (BGC) was measured every 5-10 minutes for the first hour. All children were treated for malaria with intramuscular artemether. The primary outcome measure was treatment response, defined as reaching a BGC of >or= 3.3 mmol/l (60 mg/dl) within 40 minutes after admission. Secondary outcome measures were early treatment response at 20 minutes, relapse (early and late), maximal BGC gain (CGmax), and treatment delay. RESULTS: There was no significant difference between the groups in the primary outcome measure. Treatment response occurred in 71% and 67% for SLS and IVG, respectively. Among the responders, relapses occurred in 30% on SLS at 40 minutes and in 17% on IVG at 20 minutes. There was one fatality in each group. Treatment failures in the SLS group were related to children with clenched teeth or swallowing the sugar, whereas in the IVG group, they were due to unavoidable delays in beginning an infusion (median time 17.5 min (range 3-40).Among SLS, the BGC increase was rapid among the nine patients who really kept the sugar sublingually. All but one increased their BGC by 10 minutes with a mean gain of 44 mg/dl (95%CI: 20.5-63.4). CONCLUSION: Sublingual sugar appears to be a child-friendly, well-tolerated and effective promising method of raising blood glucose in severely ill children. More frequent repeated doses are needed to prevent relapse. Children should be monitored for early swallowing which leads to delayed absorption, and in this case another dose of sugar should be given. Sublingual sugar could be proposed as an immediate "first aid" measure while awaiting intravenous glucose. In many cases it may avert the need for intravenous glucose.
Resumo:
This is an exploratory research, with a quantitative approach, developed with the objective of analyzing the work and of life situations that can offer risks to the workers' health involved in the manual and automated cut of the sugar cane. The sample was composed by 39 sugar cane cutters and 16 operators of harvesters. The data collection occurred during the months of July and August of 2006, by the technique of direct observation of work situations and workers' homes and through interviews semi-structured. The interviews were recorded and later transcribed. Data were analyzed according to Social Ecological Theory. It was observed that the workers deal with multiple health risk situations, predominantly to the risks of occurrence of respiratory, musculoskeletal and psychological problems and work-related accidents due to the work activities. The interaction of individual, social and environmental factors can determine the workers' tendency to falling ill.
Resumo:
Rock Creek Lake is at risk. The centerpiece of Rock Creek State Park in Jasper County, Rock Creek Lake offers visitors a range of recreational opportunities, including the second busiest campground in Iowa and great fishing. However, many different factors are threatening the lake. Action is being taken to improve the lake for today’s visitors and to preserve the lake for future generations. GIS mapping is helping to make those improvements possible.
Resumo:
While the quality of water in Brushy Creek Lake is currently adequate, a number of factors in the watershed (the surrounding area that drains into the lake) could put that water quality at risk. Sediment from the large watershed could fill in the lake and affect water clarity. Nutrients, like nitrogen and phosphorus, could cause algae blooms and other problems. Without preventative measures, potential manure and chemical spills could harm aquatic life in the lake. Using conservation farming practices and building structures like wetlands will work to maintain and even improve the lake’s water quality. Taking steps now to implement these critical practices will help prevent water quality problems, preserving water quality for future generations.
Resumo:
At one time, Clear Creek lived up to its name. Originally set among the prairie and oak savannah of the Iowa River valley, legend has it that early settler and Johnson County sheriff Samuel Trowbridge gave the creek its name because of its pristine waters. However, the stream’s natural protections began to weaken as more settlers moved into Iowa. Over time, the prairie disappeared, livestock trampled streambanks, the creek was dredged and straightened, wetlands were drained and urban areas began to take their toll.
Resumo:
Audit report on a special investigation of the Bear Creek Narcotics Task Force for the period July 1, 2003 through November 30, 2006
Resumo:
Stream degradation due to steep stream gradients and large deposits of loess soil is a serious problem in western Iowa. One solution to this problem is to construct grade stabilization structures at critical points along the length of the stream. Iowa Highway Research Board project HR-236, "Pottawattamie County Evaluation of Control Structures for Stabilizing Degrading Stream Channels", was initiated in order to study the effectiveness of such structures in preventing stream degradation. This report describes the construction and 4-year performance of a gabion drop structure constructed along Keg Creek during the winter of 1982-83.
Resumo:
Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.
Resumo:
The Buena Vista SWCD is submitting this WIRB request on behalf of both Buena Vista and Pocahontas SWCDs. The two SWCDs are working jointly on a project that includes three existing Mississippi River Basin Imitative (MRBI) project areas in the North Raccoon River Watershed. The total project area is 280,654 crop acres. The MRBI project involves installing conservation practices through the EQIP program. Funding from MRBI will support costs of practice design, layout and checkout, however, there is no funding to market and sell the program and practices to landowners and producers in the project area. Both soil and water districts are financially supporting work currently being done to encourage signup for the approved practices. To effectively implement the MRBI project it is imperative that marketing and promotion through group meetings and one-on one contacts is completed. Funding from WIRB will allow the existing employee to spend the needed time on these promotional activities in both Buena Vista and Pocahontas County. Through this WIRB request these two SWCDs districts plan to apply over $800,000 worth of conservation practices that is funded through the MRBI program. The return from this investment of WIRB dollars is large. This is an opportunity to support a large amount of conservation work in the North Raccoon River Watershed, which, is also an important water source for the city Des Moines and provides recreational activities from Des Moines up to BY and Pocahontas Counties.