947 resultados para Project planning
Resumo:
The present document has been elaborated in the context of the ERA-ARD project “The Agricultural Research for Development (ARD) dimension of the European Research Area (ERA) “. It is based on work done within Task 3.2 to identify a set of common or compatible methodologies for ARD planning, monitoring and evaluation and impact assessment. This set should serve as a guide for the management of joint ARD activities that are presently developed within the framework of the ERA-ARD project.
Resumo:
Most commercial project management software packages include planning methods to devise schedules for resource-constrained projects. As it is proprietary information of the software vendors which planning methods are implemented, the question arises how the software packages differ in quality with respect to their resource-allocation capabilities. We experimentally evaluate the resource-allocation capabilities of eight recent software packages by using 1,560 instances with 30, 60, and 120 activities of the well-known PSPLIB library. In some of the analyzed packages, the user may influence the resource allocation by means of multi-level priority rules, whereas in other packages, only few options can be chosen. We study the impact of various complexity parameters and priority rules on the project duration obtained by the software packages. The results indicate that the resource-allocation capabilities of these packages differ significantly. In general, the relative gap between the packages gets larger with increasing resource scarcity and with increasing number of activities. Moreover, the selection of the priority rule has a considerable impact on the project duration. Surprisingly, when selecting a priority rule in the packages where it is possible, both the mean and the variance of the project duration are in general worse than for the packages which do not offer the selection of a priority rule.
Resumo:
El Territorio hoy es visto como una totalidad organizada que no puede ser pensada separando cada uno de los elementos que la componen; cada uno de ellos es definido por su relación con los otros elementos. Así, un pensamiento que integra diferentes disciplinas y saberes comienza a manejar una realidad que lejos está de definir certezas inamovibles, y comienza a vislumbrar horizontes estratégicos. La adaptación a la no linealidad de las relaciones que se dan sobre el territorio, y la diferencia de velocidades en las que actúan los distintos actores, nos exige hacer de la flexibilidad una característica esencial de la metodología de planificación estratégica. La multi-causalidad de los fenómenos que estructuran el territorio nos obliga a construir criterios cualitativos, entendiendo que nos es imposible la medición de estas cadenas causales y su reconstrucción completa en el tiempo; sin dejar por ello de edificar un marco profundo de acción y transformación que responda a una realidad cierta y veraz. Los fenómenos producidos sobre el territorio nunca actúan de manera aislada, lo que implica una responsabilidad a la hora de comprender las sinergias y la restricción que afectan los resultados de los procesos desatados. La presente ponencia corresponde a la Segunda Fase del proceso de identificación estratégica de los proyectos Plan Estratégico Territorial (PET) que se inició en el año 2005; dicho Plan es llevada a cabo por la Subsecretaría de Planificación Territorial del Ministerio de Planificación Federal y fue abordado sobre la base de tres pretensiones: institucionalizar el ejercicio del pensamiento estratégico, fortalecer la metodología de trabajo transdisciplinaria y multisectorial, y diseñar un sistema de ponderación de proyectos estratégicos de infraestructura, tanto a nivel provincial como nacional, con una fuerte base cualitativa. Este proceso dio como resultado una cartera ponderada de proyectos de infraestructura conjuntamente con una metodología que permitió consolidar los equipos provinciales de planificación, tanto en su relación con los decisores políticos como con los actores de los múltiples sectores del gobierno, y en estos resultados consolidar y reforzar una cultura del pensamiento estratégico sobre el territorio
Resumo:
El Territorio hoy es visto como una totalidad organizada que no puede ser pensada separando cada uno de los elementos que la componen; cada uno de ellos es definido por su relación con los otros elementos. Así, un pensamiento que integra diferentes disciplinas y saberes comienza a manejar una realidad que lejos está de definir certezas inamovibles, y comienza a vislumbrar horizontes estratégicos. La adaptación a la no linealidad de las relaciones que se dan sobre el territorio, y la diferencia de velocidades en las que actúan los distintos actores, nos exige hacer de la flexibilidad una característica esencial de la metodología de planificación estratégica. La multi-causalidad de los fenómenos que estructuran el territorio nos obliga a construir criterios cualitativos, entendiendo que nos es imposible la medición de estas cadenas causales y su reconstrucción completa en el tiempo; sin dejar por ello de edificar un marco profundo de acción y transformación que responda a una realidad cierta y veraz. Los fenómenos producidos sobre el territorio nunca actúan de manera aislada, lo que implica una responsabilidad a la hora de comprender las sinergias y la restricción que afectan los resultados de los procesos desatados. La presente ponencia corresponde a la Segunda Fase del proceso de identificación estratégica de los proyectos Plan Estratégico Territorial (PET) que se inició en el año 2005; dicho Plan es llevada a cabo por la Subsecretaría de Planificación Territorial del Ministerio de Planificación Federal y fue abordado sobre la base de tres pretensiones: institucionalizar el ejercicio del pensamiento estratégico, fortalecer la metodología de trabajo transdisciplinaria y multisectorial, y diseñar un sistema de ponderación de proyectos estratégicos de infraestructura, tanto a nivel provincial como nacional, con una fuerte base cualitativa. Este proceso dio como resultado una cartera ponderada de proyectos de infraestructura conjuntamente con una metodología que permitió consolidar los equipos provinciales de planificación, tanto en su relación con los decisores políticos como con los actores de los múltiples sectores del gobierno, y en estos resultados consolidar y reforzar una cultura del pensamiento estratégico sobre el territorio
Resumo:
El Territorio hoy es visto como una totalidad organizada que no puede ser pensada separando cada uno de los elementos que la componen; cada uno de ellos es definido por su relación con los otros elementos. Así, un pensamiento que integra diferentes disciplinas y saberes comienza a manejar una realidad que lejos está de definir certezas inamovibles, y comienza a vislumbrar horizontes estratégicos. La adaptación a la no linealidad de las relaciones que se dan sobre el territorio, y la diferencia de velocidades en las que actúan los distintos actores, nos exige hacer de la flexibilidad una característica esencial de la metodología de planificación estratégica. La multi-causalidad de los fenómenos que estructuran el territorio nos obliga a construir criterios cualitativos, entendiendo que nos es imposible la medición de estas cadenas causales y su reconstrucción completa en el tiempo; sin dejar por ello de edificar un marco profundo de acción y transformación que responda a una realidad cierta y veraz. Los fenómenos producidos sobre el territorio nunca actúan de manera aislada, lo que implica una responsabilidad a la hora de comprender las sinergias y la restricción que afectan los resultados de los procesos desatados. La presente ponencia corresponde a la Segunda Fase del proceso de identificación estratégica de los proyectos Plan Estratégico Territorial (PET) que se inició en el año 2005; dicho Plan es llevada a cabo por la Subsecretaría de Planificación Territorial del Ministerio de Planificación Federal y fue abordado sobre la base de tres pretensiones: institucionalizar el ejercicio del pensamiento estratégico, fortalecer la metodología de trabajo transdisciplinaria y multisectorial, y diseñar un sistema de ponderación de proyectos estratégicos de infraestructura, tanto a nivel provincial como nacional, con una fuerte base cualitativa. Este proceso dio como resultado una cartera ponderada de proyectos de infraestructura conjuntamente con una metodología que permitió consolidar los equipos provinciales de planificación, tanto en su relación con los decisores políticos como con los actores de los múltiples sectores del gobierno, y en estos resultados consolidar y reforzar una cultura del pensamiento estratégico sobre el territorio
Resumo:
TSEP-RLI was a technical cooperation project jointly conducted by GOP thru DA-Agricultural Training Institute (ATI) and GOJ thru JICA aimed at institutionalizing the training program for Rural Life Improvement (RLI) at the (ATI). As expected, farmers, fisherfolk, women, youth and extension agents were provided with efficient and effective training services from ATI leading to the improvement of quality of life in the rural areas through efforts of human resource development. The ATI- Bohol was chosen as the model center where participatory trials and various activities of the project were undertaken for five years. These activities were participatory surveys and data collection of on-farm and off-farm productive activities; planning workshop for RLI; feedbacking of survey results and action plans to the community and the Local Government Units (LGUs), and signing of Memorandum of Agreement between the Project and participating LGUs. The above activities were done to facilitate the planning and development of most effective and necessary rural life improvement activities, to confirm the willingness of the people to support and participate and to formalize the partnership between the Project and the LGUs. Since the concept of rural life covers a vast range of activities, a consensus had been reached that the total aspects of rural life be grasped in three spheres, namely, Production & Livelihood (P/L), Rural Living Condition (RLC) and Community Environment (C/E). The RLI for Ubi (Yam) Growers was one of the pilot activities undertaken in two pilot barangays and the target beneficiaries were members of the Rural Improvement Club (RIC- a group of organized women) with the LGU of the Municipality of Corella as the implementing partner. During the planning workshop, the barangay residents articulated their desire to promote production and processing of ubi (sphere on P/L - as the entry point), lack of nutritious food was one of the identified problem (sphere on RLC- expansion point) and environmental degradation such as deforestation, and soil erosion was another problem articulated by the community people (sphere on C/E- expansion point). Major activities that were undertaken namely, Ubi cooking contest, cooking/processing seminar, training courses on entrepreneurial development, ubi production and storage technology, packaging and product design, human resource development and simplified bookkeeping motivated the beneficiaries as well as developed and enhanced their skills & capabilities while strengthening their associations. Their participation to the 5 ubi festivals and other related activities had brought some impacts on their economic and rural life improvement activities. The seven principles of TSEP-RLI include the participatory process, holistic approach, dialogical approach, bottom -up training needs assessment, demand-driven approach, cost sharing approach and collaborative implementation with other agencies including LGUs and the community.
Resumo:
The acquisition of technical, contextual and behavioral competences is a prerequisite for sustainable development and strengthening of rural communities. Territorial display of the status of these skills helps to design the necessary learning, so its inclusion in planning processes is useful for decision making. The article discusses the application of visual representation of competences in a rural development project with Aymara women communities in Peru. The results show an improvement of transparency and dialogue, resulting in a more successful project management and strengthening of social organization.
Resumo:
The present study analyzes residential models in coastal areas with large influxes of tourism, the sustainability of their planning and its repercussion on urban values. The project seeks to establish a methodology for territorial valuation through the analysis of externalities that have influenced urban growth and its impact on the formation of residential real estate values. This will make it possible to create a map for qualitative land valuation, resulting from a combination of environmental, landscape, social and productive valuations. This in turn will establish a reference value for each of the areas in question, as well as their spatial interrelations. These values become guidelines for the study of different territorial scenarios, which help improve the sustainable territorial planning process. This is a rating scale for urban planning. The results allow us to establish how the specific characteristics of the coast are valued and how they can be incorporated into sustainable development policies.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities.
Resumo:
The 12 January 2010, an earthquake hit the city of Port-au-Prince, capital of Haiti. The earthquake reached a magnitude Mw 7.0 and the epicenter was located near the town of Léogâne, approximately 25 km west of the capital. The earthquake occurred in the boundary region separating the Caribbean plate and the North American plate. This plate boundary is dominated by left-lateral strike slip motion and compression, and accommodates about 20 mm/y slip, with the Caribbean plate moving eastward with respect to the North American plate (DeMets et al., 2000). Initially the location and focal mechanism of the earthquake seemed to involve straightforward accommodation of oblique relative motion between the Caribbean and North American plates along the Enriquillo-Plantain Garden fault system (EPGFZ), however Hayes et al., (2010) combined seismological observations, geologic field data and space geodetic measurements to show that, instead, the rupture process involved slip on multiple faults. Besides, the authors showed that remaining shallow shear strain will be released in future surface-rupturing earthquakes on the EPGFZ. In December 2010, a Spanish cooperation project financed by the Politechnical University of Madrid started with a clear objective: Evaluation of seismic hazard and risk in Haiti and its application to the seismic design, urban planning, emergency and resource management. One of the tasks of the project was devoted to vulnerability assessment of the current building stock and the estimation of seismic risk scenarios. The study was carried out by following the capacity spectrum method as implemented in the software SELENA (Molina et al., 2010). The method requires a detailed classification of the building stock in predominant building typologies (according to the materials in the structure and walls, number of stories and age of construction) and the use of the building (residential, commercial, etc.). Later, the knowledge of the soil characteristics of the city and the simulation of a scenario earthquake will provide the seismic risk scenarios (damaged buildings). The initial results of the study show that one of the highest sources of uncertainties comes from the difficulty of achieving a precise building typologies classification due to the craft construction without any regulations. Also it is observed that although the occurrence of big earthquakes usually helps to decrease the vulnerability of the cities due to the collapse of low quality buildings and the reconstruction of seismically designed buildings, in the case of Port-au-Prince the seismic risk in most of the districts remains high, showing very vulnerable areas. Therefore the local authorities have to drive their efforts towards the quality control of the new buildings, the reinforcement of the existing building stock, the establishment of seismic normatives and the development of emergency planning also through the education of the population.
Resumo:
ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. RESUMEN: La estimación rápida de costes en fases iniciales del proyecto por métodos paramétricos y referencias estadísticas es un tema bien estudiado, divulgado y aplicado en el sector de la construcción. Sin embargo, existe poca literatura técnica sobre sistemas de predimensionado de tiempos, que permitan realizar rápidamente una planificación con un grado de aproximación razonable. Este texto reúne dos aspectos ya conocidos, pero hasta ahora independientes, y una aportación propia: -La estimación del plazo final por referencias estadísticas (BCIS, 2000) - La estimación del reparto del coste total a lo largo de la ejecución mediante curvas "S" (diversos autores) La estimación de la duración de la ejecución de las actividades en función de su coste. El conjunto de estas tres técnicas, aplicadas a un proyecto, permite obtener una planificación con el suficiente grado de detalle y fiabilidad para tomar decisiones en fases iniciales del proyecto.