891 resultados para Project management -- Computer programs -- TFC
Resumo:
The purpose of Project ASSIST is to provide computer training to individuals who are blind, visually-impaired or deaf-blind. Our training materials address all levels of users, from beginners to advanced users. We have tutorials, keyboard guides and diagrams, and course packets. These materials can be used by individuals who want to learn popular computer programs on their own and by professional trainers for their organization's computer training program. We also offer instructor-led training through our ASSIST Online distance learning program.
Resumo:
Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.
Resumo:
This project is focused on the implant of a software, based in the integral management of a company, as OpenERP is.
Resumo:
Underbody plows can be very useful tools in winter maintenance, especially when compacted snow or hard ice must be removed from the roadway. By the application of significant down-force, and the use of an appropriate cutting edge angle, compacted snow and ice can be removed very effectively by such plows, with much greater efficiency than any other tool under those circumstances. However, the successful operation of an underbody plow requires considerable skill. If too little down pressure is applied to the plow, then it will not cut the ice or compacted snow. However, if too much force is applied, then either the cutting edge may gouge the road surface, causing significant damage often to both the road surface and the plow, or the plow may ride up on the cutting edge so that it is no longer controllable by the operator. Spinning of the truck in such situations is easily accomplished. Further, excessive down force will result in rapid wear of the cutting edge. Given this need for a high level of operator skill, the operation of an underbody plow is a candidate for automation. In order to successfully automate the operation of an underbody plow, a control system must be developed that follows a set of rules that represent appropriate operation of such a plow. These rules have been developed, based upon earlier work in which operational underbody plows were instrumented to determine the loading upon them (both vertical and horizontal) and the angle at which the blade was operating.These rules have been successfully coded into two different computer programs, both using the MatLab® software. In the first program, various load and angle inputs are analyzed to determine when, whether, and how they violate the rules of operation. This program is essentially deterministic in nature. In the second program, the Simulink® package in the MatLab® software system was used to implement these rules using fuzzy logic. Fuzzy logic essentially replaces a fixed and constant rule with one that varies in such a way as to improve operational control. The development of the fuzzy logic in this simulation was achieved simply by using appropriate routines in the computer software, rather than being developed directly. The results of the computer testing and simulation indicate that a fully automated, computer controlled underbody plow is indeed possible. The issue of whether the next steps toward full automation should be taken (and by whom) has also been considered, and the possibility of some sort of joint venture between a Department of Transportation and a vendor has been suggested.
Resumo:
Dans certaines portions des agglomérations (poches de pauvreté de centre-ville, couronnes suburbaines dégradées, espaces périurbains sans aménité), un cumul entre des inégalités sociales (pauvreté, chômage, etc.) et environnementales (exposition au bruit, aux risques industriels, etc.) peut être observé. La persistance de ces inégalités croisées dans le temps indique une tendance de fond : la capacité d'accéder à un cadre de vie de qualité n'est pas équitablement partagée parmi les individus. Ce constat interroge : comment se créent ces inégalités ? Comment infléchir cette tendance et faire la ville plus juste ?¦Apporter des réponses à cette problématique nécessite d'identifier les facteurs de causalités qui entrent en jeu dans le système de (re)production des inégalités urbaines. Le fonctionnement des marchés foncier et immobilier, la « tyrannie des petites décisions » et les politiques publiques à incidence spatiale sont principalement impliqués. Ces dernières, agissant sur tous les éléments du système, sont placées au coeur de ce travail. On va ainsi s'intéresser précisément à la manière dont les collectivités publiques pilotent la production de la ville contemporaine, en portant l'attention sur la maîtrise publique d'ouvrage (MPO) des grands projets urbains.¦Poser la question de la justice dans la fabrique de la ville implique également de questionner les référentiels normatifs de l'action publique : à quelle conception de la justice celle-ci doit- elle obéir? Quatre perspectives (radicale, substantialiste, procédurale et intégrative) sont caractérisées, chacune se traduisant par des principes d'action différenciés. Une méthodologie hybride - empruntant à la sociologie des organisations et à l'analyse des politiques publiques - vient clore le volet théorique, proposant par un détour métaphorique d'appréhender le projet urbain comme une pièce de théâtre dont le déroulement dépend du jeu d'acteurs.¦Cette méthodologie est utilisée dans le volet empirique de la recherche, qui consiste en une analyse de la MPO d'un projet urbain en cours dans la première couronne de l'agglomération lyonnaise : le Carré de Soie. Trois grands objectifs sont poursuivis : descriptif (reconstruire le scénario), analytique (évaluer la nature de la pièce : conte de fée, tragédie ou match d'improvisation ?) et prescriptif (tirer la morale de l'histoire). La description de la MPO montre le déploiement successif de quatre stratégies de pilotage, dont les implications sur les temporalités, le contenu du projet (programmes, morphologies) et les financements publics vont être déterminantes. Sur la base de l'analyse, plusieurs recommandations peuvent être formulées - importance de l'anticipation et de l'articulation entre planification et stratégie foncière notamment - pour permettre à la sphère publique de dominer le jeu et d'assurer la production de justice par le projet urbain (réalisation puis entretien des équipements et espaces publics, financement de logements de qualité à destination d'un large éventail de populations, etc.). Plus généralement, un décalage problématique peut être souligné entre les territoires stratégiques pour le développement de l'agglomération et les capacités de portage limitées des communes concernées. Ce déficit plaide pour le renforcement des capacités d'investissement de la structure intercommunale.¦La seule logique du marché (foncier, immobilier) mène à la polarisation sociale et à la production d'inégalités urbaines. Faire la ville juste nécessite une forte volonté des collectivités publiques, laquelle doit se traduire aussi bien dans l'ambition affichée - une juste hiérarchisation des priorités dans le développement urbain - que dans son opérationnalisation - une juste maîtrise publique d'ouvrage des projets urbains.¦Inner-city neighborhoods, poor outskirts, and peri-urban spaces with no amenities usually suffer from social and environmental inequalities, such as poverty, unemployment, and exposure to noise and industrial hazards. The observed persistence of these inequalities over time points to an underlying trend - namely, that access to proper living conditions is fundamentally unequal, thus eliciting the question of how such inequalities are effected and how this trend can be reversed so as to build a more equitable city.¦Providing answers to such questions requires that the causal factors at play within the system of (re)production of urban inequalities be identified. Real estate markets, "micromotives and macrobehavior", and public policies that bear on space are mostly involved. The latter are central in that they act on all the elements of the system. This thesis therefore focuses on the way public authorities shape the production of contemporary cities, by studying the public project ownership of major urban projects.¦The study of justice within the urban fabric also implies that the normative frames of reference of public action be questioned: what conception of justice should public action refer to? This thesis examines four perspectives (radical, substantialist, procedural, and integrative) each of which results in different principles of action. This theoretical part is concluded by a hybrid methodology that draws from sociology of organizations and public policy analysis and that suggests that the urban project may be understood as a play, whose outcome hinges on the actors' acting.¦This methodology is applied to the empirical analysis of the public project ownership of an ongoing urban project in the Lyon first-ring suburbs: the Carré de Soie. Three main objectives are pursued: descriptive (reconstructing the scenario), analytical (assessing the nature of the play - fairy tale, tragedy or improvisation match), and prescriptive (drawing the moral of the story). The description of the public project ownership shows the successive deployment of four control strategies, whose implications on deadlines, project content (programs, morphologies), and public funding are significant. Building on the analysis, several recommendations can be made to allow the public sphere to control the process and ensure the urban project produces equity (most notably, anticipation and articulation of planning and real- estate strategy, as well as provision and maintenance of equipment and public spaces, funding of quality housing for a wide range of populations, etc.). More generally, a gap can be highlighted between those territories that are strategic to the development of the agglomeration and the limited resources of the municipalities involved. This deficit calls for strengthening the investment abilities of the intermunicipal structure.¦By itself, the real-estate market logic brings about social polarization and urban inequalities. Building an equitable city requires a strong will on the part of public authorities, a will that must be reflected both in the stated ambition - setting priorities of urban development equitably - and in its implementation managing urban public projects fairly.
Resumo:
Introduction: Therapeutic drug monitoring (TDM) aims at optimizing treatment by individualizing dosage regimen based on measurement of blood concentrations. Maintaining concentrations within a target range requires pharmacokinetic and clinical capabilities. Bayesian calculation represents a gold standard in TDM approach but requires computing assistance. In the last decades computer programs have been developed to assist clinicians in this assignment. The aim of this benchmarking was to assess and compare computer tools designed to support TDM clinical activities.¦Method: Literature and Internet search was performed to identify software. All programs were tested on common personal computer. Each program was scored against a standardized grid covering pharmacokinetic relevance, user-friendliness, computing aspects, interfacing, and storage. A weighting factor was applied to each criterion of the grid to consider its relative importance. To assess the robustness of the software, six representative clinical vignettes were also processed through all of them.¦Results: 12 software tools were identified, tested and ranked. It represents a comprehensive review of the available software's characteristics. Numbers of drugs handled vary widely and 8 programs offer the ability to the user to add its own drug model. 10 computer programs are able to compute Bayesian dosage adaptation based on a blood concentration (a posteriori adjustment) while 9 are also able to suggest a priori dosage regimen (prior to any blood concentration measurement), based on individual patient covariates, such as age, gender, weight. Among those applying Bayesian analysis, one uses the non-parametric approach. The top 2 software emerging from this benchmark are MwPharm and TCIWorks. Other programs evaluated have also a good potential but are less sophisticated (e.g. in terms of storage or report generation) or less user-friendly.¦Conclusion: Whereas 2 integrated programs are at the top of the ranked listed, such complex tools would possibly not fit all institutions, and each software tool must be regarded with respect to individual needs of hospitals or clinicians. Interest in computing tool to support therapeutic monitoring is still growing. Although developers put efforts into it the last years, there is still room for improvement, especially in terms of institutional information system interfacing, user-friendliness, capacity of data storage and report generation.
Resumo:
Provides instructions for using the computer program which was developed under the research project, "The Economics of Reducing the County Road System: Three Case Studies In Iowa". This program operates on an IBP personal computer with 300K storage. A fixed disk is required with at least 3 megabytes of storage. The computer must be equipped with DOS version 3.0; the programs are written in Fortran. The user's manual describes all data requirements including network preparation, trip information, cost for maintenance, reconstruction, etc. Program operation instructions are presented, as well as sample solution output and a listing of the computer programs.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This appendix is divided into three sections. The first section contains abstracts of each of the eight computer programs in the system, instructions for keypunching the three input documents, and computer operating instructions pertaining to each program. The second section contains system flowcharts for the entire system as well as program flowcharts for each program. The last section contains PL/l program listings of each program.
Resumo:
Descripción, análisis y planificación del desarrollo de una extranet.
Resumo:
Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.
Resumo:
This report describes the first phase in a project to develop an electronic reference library (ERL) to help Iowa transportation officials efficiently access information in critical and heavily used documents. These documents include Standard Specifications for Bridge and Highway Construction (hereinafter called Standard Specifications), design manuals, standard drawings, the Construction Manual, and Material Instruction Memoranda (hereinafter called Material IMs). Additional items that could be included to enhance the ERL include phone books, letting dates, Internet links, computer programs distributed by the Iowa Department of Transportation (DOT), and local specifications, such as the Urban Standard Specifications of Public Improvements. All cross-references should be hyper linked, and a search engine should be provided. Revisions noted in the General Supplemental Specifications (hereinafter called the Supplemental Specifications) should be incorporated into the text of the Standard Specifications. The Standard Specifications should refer to related sections of other documents, and there should be reciprocal hyper links in those other documents. These features would speed research on critical issues and save staff time. A master plan and a pilot version were both developed in this first phase of the ERL.
Resumo:
Integral abutment bridges are constructed without an expansion joint in the superstructure of the bridge; therefore, the bridge girders, deck, abutment diaphragms, and abutments are monolithically constructed. The abutment piles in an integral abutment bridge are vertically orientated, and they are embedded into the pile cap. When this type of a bridge experiences thermal expansion or contraction, horizontal displacements are induced at the top of the abutment piles. The flexibility of the abutment piles eliminates the need to provide an expansion joint at the inside face to the abutments: Integral abutment bridge construction has been used in Iowa and other states for many years. This research is evaluating the performance of integral abutment bridges by investigating thermally induced displacements, strains, and temperatures in two Iowa bridges. Each bridge has a skewed alignment, contains five prestressed concrete girders that support a 30-ft wide roadway for three spans, and involves a water crossing. The bridges will be monitored for about two years. For each bridge, an instrumentation package includes measurement devices and hardware and software support systems. The measurement devices are displacement transducers, strain gages, and thermocouples. The hardware and software systems include a data-logger; multiplexers; directline telephone service and computer terminal modem; direct-line electrical power; lap-top computer; and an assortment of computer programs for monitoring, transmitting, and management of the data. Instrumentation has been installed on a bridge located in Guthrie County, and similar instrumentation is currently being installed on a bridge located in Story County. Preliminary test results for the bridge located in Guthrie County have revealed that temperature changes of the bridge deck and girders induce both longitudinal and transverse displacements of the abutments and significant flexural strains in the abutment piles. For an average temperature range of 73° F for the superstructure concrete in the bridge located in Guthrie County, the change in the bridge length was about 1 118 in. and the maximum, strong-axis, flexural-strain range for one of the abutment piles was about 400 micro-strains, which corresponds to a stress range of about 11,600 psi.
Resumo:
Työn päätavoitteena oli tuoda esiin tärkeimmät julkistamisprosessin tehokkuuteen vaikuttavat tekijät. Tutkimuksessa tarkasteltiin aihetta julkistamisprojektien vetäjän näkökulmasta. Kirjallinen selvitys kattaa keskeisimmät ohjelmistoprosessin, palvelun laadun sekä projektihallinnan teoriat. Kokeellisena aineistona käytettiin asiakkailta ja myynnin sekä käyttöönoton organisaatioilta tullutta palautetta ja asiantuntijahaastatteluita. Case-tuotteena tarkasteltiin suuren kansainvälisen yrityksen jälleenmyymää leikkaussalihallinnan ohjelmistoa. Tärkeimpiä julkistamisprosessin tehokkuuteen vaikuttavia tekijöitä ovat tiekartan ja julkistamispakettien sisällön hallinta, projektin aikataulujen pitäminen, rehellinen ja nopea kommunikaatio myyntikanavaan ja asiakkaille, sekä hyvin toteutettu testaus. Työssä käydään läpi esimerkkistrategioita kehittymiseen näillä alueilla.
Resumo:
Tämän diplomityön tavoitteena on kuvata tiedonkulkua projektiliiketoimintaa harjoittavassa yrityksessä sekä analysoida kuvausta määrittäen mahdolliset kehityskohdat. Työssätuotetut kuvaukset ja kehityskohtien määrittäminen toimivat pohjana yrityksen kehittäessä projektien hallintaansa tulevaisuudessa. Työssä valitaan tietojohtamisen näkökulma sopivaksi lähestymistavaksi yrityksen toiminnananalysointiin. Haastatteluin kerätyn tutkimusmateriaalin perusteella luodaan prosessikuvaukset jotka mallintavat tietovirtoja yrityksen projektien aikana tapahtuvien prosessien välillä. Kuvausta peilataan tietämyksen luomisen sekä projektien tietojohtamisen teoriaan ja määritetään kehityskohteita. Kehityskohteiden määrittämisen lisäksi ehdotetaan mahdollisia toimenpiteitä tiedon ja tietämyksen hallinnan kehittämiseksi. Kokemusten ja opittujen asioiden sekäpalautteen kerääminen projektien aikana sekä niiden jälkeen havaittiin tärkeimmäksi kehityskohdaksi. Näiden keräämisen voidaan todeta vaativan järjestelmällisyyttä jotta projektien onnistumiset sekä niissä saavutetut parannukset voidaan toistaa jatkossa ja virheet sekä epäonnistumiset sitä vastoin välttää.