1000 resultados para Project Gnome.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Attracting quality teachers to rural areas is an ongoing international concern. Teacher education institutions have been criticised for contributing to this problem by failing to raise an awareness of teaching in rural areas in their teacher education programs. This study investigates preservice teachers’ perceptions towards teaching in rural areas after participating in a rural experience through the Over the Hill project. A self-selected group of second and third year preservice teachers from a regional campus of an urban Queensland university participated in a six-day rural experience, which included being billeted with local families, attending local community events and observing and teaching in rural primary and secondary schools. Data collected from the preservice teachers before and after the rural teaching experience were analysed to reveal positive perceptions towards teaching and living in rural communities. The findings revealed that even a brief immersion into rural schooling communities can positively influence preservice teachers’ attitudes towards seeking rural teaching placements. These findings have implications for the ways in which teacher education institutions can promote rural teaching opportunities in their teacher education programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the growing significance of services in most developed economies, there is an increased interest in the role of service innovation in service firm competitive strategy. Despite growing literature on service innovation, it remains fragmented reflecting the need for a model that captures key antecedents driving the service innovation-based competitive advantage process. Building on extant literature and using thirteen in-depth interviews with CEOs of project-oriented service firms, this paper presents a model of innovation-based competitive advantage. The emergent model suggests that entrepreneurial service firms pursuing innovation carefully select and use dynamic capabilities that enable them to achieve greater innovation and sustained competitive advantage. Our findings indicate that firms purposefully use create, extend and modify processes to build and nurture key dynamic capabilities. The paper presents a set of theoretical propositions to guide future research. Implications for theory and practice are discussed. Finally, directions for future research are outlined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been an abundance of education reform recommendations for teaching and teacher education as a result of national and international reviews. A major criticism in education is the lack of connection between theory and practice (or praxis), that is, how the learning at university informs practical applications for teaching in the classroom. This paper presents the Teacher Education Done Differently (TEDD) project, funded by the Department of Education, Employment and Workplace Relations (DEEWR). It outlines how it has re-structured its offering of coursework in a Bachelor of Education (BEd) held at an Australian university campus to embrace praxis. Establishing partnerships was crucial to the development of this project. TEDD initially gathered a reference group of educators, which included university staff, school executives, and other key stakeholders, who formed an Advisory Group and Steering Committee. These groups formed a collective vision for TEDD and aimed to motivate others, foster team work, and create leadership roles that would benefit all stakeholders. The paper presents how university units changed to include a stronger praxis development for preservice teachers. Preservice teachers take their learning into schools within lead-up programs such as Ed Start for practicum I, III, and IV; Science in Schools, and Studies of Society and its Environment (SOSE). Findings showed that opportunities for undertaking additional real-world experiences were perceived to assist the preservice teachers’ praxis development. Additional school-based experiences as lead-up days for field experiences and as avenues for exploring the teaching of specific subject areas presented as an opportunity for enhancing education for all.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ICT degrees in most Australian universities have a sequence of up to three programming subjects, or units. BABELnot is an ALTC-funded project that will document the academic standards associated with those three subjects in the six participating universities and, if possible, at other universities. This will necessitate the development of a rich framework for describing the learning goals associated with programming. It will also be necessary to benchmark exam questions that are mapped onto this framework. As part of the project, workshops are planned for ACE 2012, ICER 2012 and ACE 2013, to elicit feedback from the broader Australasian computing education community, and to disseminate the project’s findings. The purpose of this paper is to introduce the project to that broader Australasian computing education community and to invite their active participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is a formative evaluation of the operations of the DEEWR funded Stronger Smarter Learning Community (SSLC) project from September 2009 to July 2011. It is undertaken by an independent team of researchers from Queensland University of Technology, the University of Newcastle and Harvard University. It reports on findings from: documentary analysis; qualitative case studies of SSLC Hub schools; descriptive, multivariate and multilevel analysis of survey data from school leaders and teachers from SSLC Hub and Affiliate schools and from a control group of non-SSLC schools; and multilevel analysis of school-level data on SSLC Hubs, Affiliates and ACARA like-schools. Key findings from this work are that: • SSLC school leaders and teachers are reporting progress in changing school ethos around issues of: recognition of Indigenous identity, Indigenous leadership, innovative approaches to staffing and school models, Indigenous community engagement and high expectations leadership; • Many Stronger Smarter messages are reportedly having better uptake in schools with high percentages of Indigenous students; • There are no major or consistent patterns of differences between SSLC and non-SSLC schools in teacher and school leader self-reports of curriculum and pedagogy practices; and • There is no evidence to date that SSLC Hubs and Affiliates have increased attendance or increased achievement gains compared to ACARA like-schools. Twenty-one months is relatively early in this school reform project. Hence the major focus of subsequent reports will be on the documentation of comparative longitudinal gains in achievement tests and improved attendance. The 2011 and 2012 research also will model the relationships between change in school ethos/climate, changed Indigenous community relations, improved curriculum/pedagogy, and gains in Indigenous student achievement, attendance and outcomes. The key challenge for SSLC and the Stronger Smarter approach will be whether it can systematically generate change and reform in curriculum and pedagogy practices that can be empirically linked to improved student outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The success of many knowledge-intensive industries depends on creative projects that lie at the heart of their logic of production. The temporality of such projects, however, is an issue that is insufficiently understood. To address this, we study the perceived time frame of teams that work on creative projects and its effects on project dynamics. An experiment with 267 managers assigned to creative project teams with varying time frames demonstrates that compared to creative project teams with a relatively longer time frame, project teams with a shorter time frame focus more on the immediate present, are less immersed in their task, and utilize a more heuristic mode of information processing. Furthermore, we find that time frame moderates the negative effect of team conflict on team cohesion. These results are consistent with our theory that the temporary nature of creative projects shapes different time frames among project participants, and that it is this time frame that is an important predictor of task and team processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rats are superior to the most advanced robots when it comes to creating and exploiting spatial representations. A wild rat can have a foraging range of hundreds of meters, possibly kilometers, and yet the rodent can unerringly return to its home after each foraging mission, and return to profitable foraging locations at a later date (Davis, et al., 1948). The rat runs through undergrowth and pipes with few distal landmarks, along paths where the visual, textural, and olfactory appearance constantly change (Hardy and Taylor, 1980; Recht, 1988). Despite these challenges the rat builds, maintains, and exploits internal representations of large areas of the real world throughout its two to three year lifetime. While algorithms exist that allow robots to build maps, the questions of how to maintain those maps and how to handle change in appearance over time remain open. The robotic approach to map building has been dominated by algorithms that optimise the geometry of the map based on measurements of distances to features. In a robotic approach, measurements of distance to features are taken with range-measuring devices such as laser range finders or ultrasound sensors, and in some cases estimates of depth from visual information. The features are incorporated into the map based on previous readings of other features in view and estimates of self-motion. The algorithms explicitly model the uncertainty in measurements of range and the measurement of self-motion, and use probability theory to find optimal solutions for the geometric configuration of the map features (Dissanayake, et al., 2001; Thrun and Leonard, 2008). Some of the results from the application of these algorithms have been impressive, ranging from three-dimensional maps of large urban strucutures (Thrun and Montemerlo, 2006) to natural environments (Montemerlo, et al., 2003).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we develop a conceptual model to explore the perceived complementary congruence between complex project leaders and the demands of the complex project environment to understand how leaders’ affective and behavioural performance at work might be impacted by this fit. We propose that complex project leaders high in emotional intelligence and cognitive flexibility should report a higher level of fit between themselves and the complex project environment. This abilities-demands measure of fit should then relate to affective and behavioural performance outcomes, such that leaders who perceive a higher level of fit should establish and maintain more effective, higher quality project stakeholder relationships than leaders who perceive a lower level of fit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, an ‘ecological’ lens is applied to an independent living project aiming to provide ‘homes for life’ for adult children with disabilities. The qualities of the project as ecological praxis are highlighted along with the implications for an open-ended enquiry into ecologies for and of the interior. In terms of the ecological concern for intimate modes of being, interior design is shown to be well placed through its association with environments in which people spend most of their life and through powerful concepts such as ‘interiority’ and ‘home’ which link to fundamental existential notions of ‘self ’ and ‘identity’. However, despite the interior being a significant generative force, this has not happened to the exclusion of other disciplines. Ignoring territorial urges to claim areas and concepts as one’s own, the paper describes how the project has actively encouraged design disciplines to trespass in each other’s territories. Ecologies for and of the interior, while recognising the need for discipline emphasis, also demand an integrated and collective approach through what is in effect transdisciplinary practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’