990 resultados para Identity Projects
Resumo:
It is now widely accepted that first year students benefit from pedagogies which mediate and support their transitions to university, and assist them to develop an adaptive student identity. We present an initiative which takes an alternative and additional approach to this way of viewing the first year experience. Based on research into creative industries career trajectories, this initiative focuses on the establishment of nascent career identity and professional self-concept amongst 600 first semester Bachelor of Creative Industries (BCI) students at QUT. The BCI is offered as a three year undergraduate program involving self-selection of majors, minors and electives, and also as a four year double degree with Business and Law faculties. Students engage in a scaffolded process of initial career visioning and reflective course planning, based on their own industry and careers research, guided by industry-active academic and careers staff, and drawing upon the experiences of final year students.
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.
Resumo:
The structure of the travel, meant as cultural activity, is proposed as a key to read and design the urban or rural landscape.
Resumo:
The Italian Colonial Experience in the design of the built environment is analysed as a case study of State image promotion.
Resumo:
Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.
Resumo:
Teachers’ professional conversations regarding the qualities evidenced in student work provide opportunities to develop a shared understanding of achievement standards. This research investigates social moderation conducted in a synchronous online mode as a specific form of professional conversation. The discussion considers the different factors that influenced these conversations which included the technologic medium of the meeting. The focus of the discussion is how participation in online moderation can support teachers to develop an assessment identity as one who works within a standards-based assessment system. Qualitative data were gathered from middle school teachers from different year levels, in different curriculum areas, in diverse geographic locations, and in a range of sociocultural contexts within Queensland, Australia. Analysis of the data through a sociocultural lens of becoming suggests that participation in online moderation, while challenging for teachers, can also provide opportunities to construct and to negotiate an identity as an assessor of student work.
Resumo:
Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.
Resumo:
This report was prepared for Lat 27 Pty Ltd for the purpose of conducting a City Centre Public Realm and Active Transport Study for Urban Renewal Brisbane, Brisbane City Council. In this review, we highlight some key learnings and recommendations from innovative projects across the globe to inform public realm design and help facilitate active transport in subtropical Brisbane. Traditionally, Australian cities have been have been based on northern European models. This report is informed by the view that planners and urban designers must look beyond that paradigm to redefine and re-conceptualise our city in a different way, one that values our unique local identity and climate. In re-designing Brisbane’s public realm, therefore, design interventions and responses must celebrate our unique identity and outdoor lifestyle and address the subtropical climate's reality of life in warm humid summers and cool dry winters. The current period of rapid urban change, and the imperative to adapt to climate change, together offer an opportunity to prioritise and integrate design features that provide shade and shelter from sun and summer rain, open and permeable urban environments that facilitate cooling air movement, and connections to water and nature, so that the urban built form co-exists within an inviting, functional and memorable natural landscape. To inform this transformation, this review provides insight into international experiences and best practices. To date, although there is much practice-based knowledge, academic studies outlining learnings and recommendations from case studies (especially in a subtropical context) remain rare. Thus, a range of sources (industry reports, websites, journal articles and books) have been utilised.
Resumo:
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
"Defrauding land titles systems impacts upon us all. Those who deal in land include ordinary citizens, big business, small business, governments, not-for-profit organisation, deceased estates...Fraud here touches almost everybody." the thesis presented in this paper is that the current and disparate steps taken by jurisdictions to alleviate land fraud associated with identity-based crimes are inadequate. The centrepiece of the analysis is the consideration of two scenarios that have recently occurred. One is the typical scenario where a spouse forges the partner's signature to obtain a mortgage from a financial institution. The second is atypical. It involves a sophisticated overseas fraud duping many stakeholders involved in the conveyancing process. After outlining these scenarios, we will examine how identity verification requirements of the United Kingdom, Ontario, the Australian states, and New Zealand would have been applied to these two frauds. Our conclusion is that even though some jurisdictions may have prevented the frauds from occurring, the current requirements are inadequate. We use the lessons learnt to propose what we consider core principles for identity verification in land transactions.
Resumo:
The development of the Australian Curriculum has reignited a debate about the role of Australian literature in the contexts of curricula and classrooms. A review of the mechanisms for promoting Australian literature including literary prizes, databases, surveys and texts included for study in senior English classrooms in New South Wales and Victoria provides a background for considering the purpose of Australian texts and the role of literature teachers in shaping students’ engagement with literature.
Resumo:
The work by graduate teachers in this volume represent intentional design of learning experiences using technology for Early Childhood settings. They were given a two-part design task: a sequence of lessons organised around a themed project; and the collection of resources to support such activities. The project had to be constructive in nature where the children built objects and representations that were meaningful to them. The excellent works presented here offer a range of approaches that would be suitable in a variety of contexts. Because they are reasoned, these projects offer flexibility in implementation along with confidence that they would be effective.
Resumo:
The World Wide Web constitutes one of the most important inventions of the late 20th century: it has changed culture, society, business, communication, politics, and many other fields of human endeavour, not least also by providing a more user-friendly pathway of access to its major underlying technology, the Internet itself. Key phases in its development can be charted, especially by how it has been used to present and share information – and here, the personal or professional, private or official homepage stands in as a useful representation of wider Web trends overall. From hand-coded beginnings through several successive stages of experimentation and standardisation, to the shifting balance between personal sites and social networks, the homepage demonstrates how the Web itself, and its place in our lives, have changed.