880 resultados para End of degree project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rats learn to prefer flavors associated with postingestive effects of nutrients. The physiological signals underlying this postingestive reward are unknown. We have previously shown that rats readily learn to prefer a flavor that was consumed early in a multi-flavored meal when glucose is infused intragastrically (IG), suggesting rapid postingestive reward onset. The present experiments investigate the timing of postingestive fat reward, by providing distinctive flavors in the first and second halves of meals accompanied by IG fat infusion. Learning stronger preference for the earlier or later flavor would indicate when the rewarding postingestive effects are sensed. Rats consumed sweetened, calorically-dilute flavored solutions accompanied by IG high-fat infusion (+ sessions) or water (− sessions). Each session included an “Early” flavor for 8 min followed by a “Late” flavor for 8 min. Learned preferences were then assessed in two-bottle tests (no IG infusion) between Early(+) vs. Early(−), Late(+) vs. Late(−), Early(+) vs. Late(+), and Early(−) vs. Late(−). Rats only preferred Late(+), not Early(+), relative to their respective (−) flavors. In a second experiment rats trained with a higher fat concentration learned to prefer Early(+) but more strongly preferred Late(+). Learned preferences were evident when rats were tested deprived or recently satiated. Unlike with glucose, ingested fat appears to produce a slower-onset rewarding signal, detected later in a meal or after its termination, becoming more strongly associated with flavors towards the end of the meal. This potentially contributes to enhanced liking for dessert foods, which persists even when satiated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rats learn to prefer flavors associated with postingestive effects of nutrients. The physiological signals underlying this postingestive reward are unknown. We have previously shown that rats readily learn to prefer a flavor that was consumed early in a multi-flavored meal when glucose is infused intragastrically (IG), suggesting rapid postingestive reward onset. The present experiments investigate the timing of postingestive fat reward, by providing distinctive flavors in the first and second halves of meals accompanied by IG fat infusion. Learning stronger preference for the earlier or later flavor would indicate when the rewarding postingestive effects are sensed. Rats consumed sweetened, calorically-dilute flavored solutions accompanied by IG high-fat infusion (+ sessions) or water (- sessions). Each session included an "Early" flavor for 8min followed by a "Late" flavor for 8min. Learned preferences were then assessed in two-bottle tests (no IG infusion) between Early(+) vs. Early(-), Late(+) vs. Late(-), Early(+) vs. Late(+), and Early(-) vs. Late(-). Rats only preferred Late(+), not Early(+), relative to their respective (-) flavors. In a second experiment rats trained with a higher fat concentration learned to prefer Early(+) but more strongly preferred Late(+). Learned preferences were evident when rats were tested deprived or recently satiated. Unlike with glucose, ingested fat appears to produce a slower-onset rewarding signal, detected later in a meal or after its termination, becoming more strongly associated with flavors towards the end of the meal. This potentially contributes to enhanced liking for dessert foods, which persists even when satiated.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Like other mountain areas in the world, the Hindu Kush-Himalayan (HKH) region is particularly vulnerable to climate change. Ongoing climate change processes are projected to have a high impact on the HKH region, and accelerated warming has been reported in the Himalayas. These climate change impacts will be superimposed on a variety of other environmental and social stresses, adding to the complexity of the issues. The sustainable use of natural resources is crucial to the long-term stability of the fragile mountain ecosystems in the HKH and to sustain the socio-ecological resilience that forms the basis of sustainable livelihoods in the region. In order to be prepared for these challenges, it is important to take stock of previous research. The ‘People and Resource Dynamics Project’ (PARDYP), implemented by International Centre for Integrated Mountain Development (ICIMOD), provides a variety of participatory options for sustainable land management in the HKH region. The PARDYD project was a research for development project that operated in five middle mountain watersheds across the HKH – two in Nepal and one each in China, India, and Pakistan. The project ran from 1996 to 2006 and focused on addressing the marginalisation of mountain farmers, the use and availability of water, issues relating to land and forest degradation and declining soil fertility, the speed of regeneration of degraded land, and the ability of the natural environment to support the growing needs of the region’s increasing population. A key learning from the project was that the opinion of land users is crucial to the acceptance (and, therefore, successful application) of new technologies and approaches. A major challenge at the end of every project is to promote knowledge sharing and encourage the cross-fertilization of ideas (e.g., in the case of PARDYP, with other middle mountain inhabitants and practitioners in the region) and to share lessons learned with a wider audience. This paper will highlight how the PARDYP findings, including ways of addressing soil fertility and water scarcity, have been mainstreamed in the HKH region through capacity building (international, regional, and national training courses), networking, and the provision of backstopping services. In addition, in view of the challenges in watershed management in the HKH connected to environmental change, the lessons learned from the PARDYP are now being used by ICMOD to define and package climate change proof technology options to address climate change adaptation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a Rare Earth Elements (REE) record determined on the EPICA ice core drilled at Dronning Maud Land (EDML) in the Atlantic sector of the East Antarctic Plateau. The record covers the transition from the last glacial stage (LGS) to the early Holocene (26 600–7500 yr BP) at decadal to centennial resolution. Additionally, samples from potential source areas (PSAs) for Antarctic dust were analyzed for their REE characteristics. The dust provenance is discussed by comparing the REE fingerprints in the ice core and the PSA samples. We find a shift in variability in REE composition at ~15 000 yr BP in the ice core samples. Before 15 000 yr BP, the dust composition is very uniform and its provenance was most certainly dominated by a South American source. After 15 000 yr BP, multiple sources such as Australia and New Zealand become relatively more important, although South America remains the major dust source. A similar change in the dust characteristics was observed in the EPICA Dome C ice core at around ~15 000 yr BP, accompanied by a shift in the REE composition, thus suggesting a change of atmospheric circulation in the Southern Hemisphere.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project-based education and portfolio assessments are at the forefront of educational research. This research follows the implementation of a project-based unit in a high school physics class. Students played the role of an engineering firm who designed, built and tested file folder bridges. The purpose was to determine if projectbased learning could improve student attitude toward science and related careers like engineering. Teams of students presented their work in a portfolio for a final assessment of the process of designing, building and testing their bridges.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When project managers determine schedules for resource-constrained projects, they commonly use commercial project management software packages. Which resource-allocation methods are implemented in these packages is proprietary information. The resource-allocation problem is in general computationally difficult to solve to optimality. Hence, the question arises if and how various project management software packages differ in quality with respect to their resource-allocation capabilities. None of the few existing papers on this subject uses a sizeable data set and recent versions of common software packages. We experimentally analyze the resource-allocation capabilities of Acos Plus.1, AdeptTracker Professional, CS Project Professional, Microsoft Office Project 2007, Primavera P6, Sciforma PS8, and Turbo Project Professional. Our analysis is based on 1560 instances of the precedence- and resource-constrained project scheduling problem RCPSP. The experiment shows that using the resource-allocation feature of these packages may lead to a project duration increase of almost 115% above the best known feasible schedule. The increase gets larger with increasing resource scarcity and with increasing number of activities. We investigate the impact of different complexity scenarios and priority rules on the project duration obtained by the software packages. We provide a decision table to support managers in selecting a software package and a priority rule.