832 resultados para Construction equipment industry


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT

Relevância:

40.00% 40.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis examines the ways that libraries have employed computers to assist with housekeeping operations. It considers the relevance of such applications to company libraries in the construction industry, and describes more specifically the development of an integrated cataloguing and loan system. A review of the main features in the development of computerised ordering, cataloguing and circulation control systems shows that fully integrated packages are beginning to be completed, and that some libraries are introducing second generation programs. Cataloguing is the most common activity to be computerised, both at national and company level. Results from a sample of libraries in the construction industry suggest that the only computerised housekeeping system is at Taylor Woodrow. Most of the firms have access to an in-house computer, and some of the libraries, particularly those in firms of consulting engineers, might benefit from computerisation, but there are differing attitudes amongst the librarians towards the computer. A detailed study of the library at Taylor Woodrow resulted in a feasibility report covering all the areas of its activities. One of the main suggestions was the possible use of a computerised loans and cataloguing system. An integrated system to cover these two areas was programmed in Fortran and implemented. This new system provides certain benefits and saves staff time, but at the cost of time on the computer. Some improvements could be made by reprogramming, but it provides a general system for small technical libraries. A general equation comparing costs for manual and computerised operations is progressively simplified to a form where the annual saving from the computerised system is expressed in terms of staff and computer costs and the size of the library. This equation gives any library an indication of the savings or extra cost which would result from using the computerised system.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The current economic climate and a continuing fall in output of the UK construction industry has led to falling prices and margins particularly affecting those lower down in the supply chain such as specialist subcontractors. Coen Ltd. is one such company based in the West Midlands. Faced with a need to up its game it has embarked on a business improvement programme concentrating on better operational efficiency, building stronger client relationships and delivering value added services. Lacking appropriate internal resources Coen has joined with Aston Business School in a 2 year ERDF sponsored project to fulfil the transformation programme. The paper will describe the evolution of product- service offerings in construction and link this with the work being carried out at Coen with Aston and outline the anticipated outcomes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper the behavior of economic actors shown in the uncertain quality goods markets is examined from the perspective of the sociology of markets. The analysis uses the findings of in-depth interviews conducted in 2011 and 2012 respectively amongst small and medium size entrepreneurs working in construction industry. In the Hungarian construction industry neither formal rules, nor vocational chambers, are able to create a safe environment for entrepreneurs. Nevertheless, networks created as a result of micro-selection steps might be able to enforce the quality of services, observe deadlines and what is more, ensure payment discipline. In this market, the typical high risk can be reduced by relationships. Networks reduce also the cost of transactions, since the important part of the services in this field could only be standardized at significant costs.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In the U.S., construction accidents remain a significant economic and social problem. Despite recent improvement, the Construction industry, generally, has lagged behind other industries in implementing safety as a total management process for achieving zero accidents and developing a high-performance safety culture. One aspect of this total approach to safety that has frustrated the construction industry the most has been “measurement”, which involves identifying and quantifying the factors that critically influence safe work behaviors. The basic problem attributed is the difficulty in assessing what to measure and how to measure it—particularly the intangible aspects of safety. Without measurement, the notion of continuous improvement is hard to follow. This research was undertaken to develop a strategic framework for the measurement and continuous improvement of total safety in order to achieve and sustain the goal of zero accidents, while improving the quality, productivity and the competitiveness of the construction industry as it moves forward. The research based itself on an integral model of total safety that allowed decomposition of safety into interior and exterior characteristics using a multiattribute analysis technique. Statistical relationships between total safety dimensions and safety performance (measured by safe work behavior) were revealed through a series of latent variables (factors) that describe the total safety environment of a construction organization. A structural equation model (SEM) was estimated for the latent variables to quantify relationships among them and between these total safety determinants and safety performance of a construction organization. The developed SEM constituted a strategic framework for identifying, measuring, and continuously improving safety as a total concern for achieving and sustaining the goal of zero accidents.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The UK construction industry is notorious for the sheer amount of disputes which are likely to arise on each building and engineering project. Despite numerous creative attempts at “dispute avoidance” and “dispute resolution”, this industry is still plagued with these costly disputes. Whilst both academic literature and professional practices have investigated the causes of disputes and the mechanisms for avoidance/resolution of these disputes, neither has studied in any detail the nature of the construction disputes and why they develop as they do once a construction lawyer is engaged. Accordingly, this research explores the question of what influences the outcome of a construction dispute and to what extent do construction lawyers control or direct this outcome? The research approach was ethnographic. Fieldwork took place at a leading construction law firm in London over 18 months. The primary focus was participant observation in all of the firm’s activities. In addition, a database was compiled from the firm’s files and archives, thus providing information for quantitative analysis. The basis of the theoretical framework, and indeed the research method, was the Actor‐Network Theory (ANT). As such, this research viewed a dispute as a set of associations – an entity which takes form and acquires its attributes as a result of its relations with other entities. This viewpoint is aligned with relational contract theories, which in turn provides a unified platform for exploring the disputes. The research investigated the entities and events which appeared to influence the dispute’s identity, shape and outcome. With regard to a dispute’s trajectory, the research took as its starting point that a dispute follows the transformation of “naming, blaming, claiming…”, as identified by Felstiner, Abel and Sarat in 1980. The research found that construction disputes generally materialise and develop prior to any one of the parties approaching a lawyer. Once the lawyer is engaged, we see the reverse of the trajectory “naming, blaming, claiming…” this being: “claiming, blaming, naming…” The lawyers’ role is to identify or name (or rename) the dispute in the best possible light for their client in order to achieve the desired outcome – the development of which is akin to the design process. The transformation of a dispute and the reverse trajectory is by no means linear, but rather, iterative and spatial as it requires alliances, dependencies and contingencies to assemble and take the shape it does. The research concludes that construction disputes are rarely ever completely “resolved” as such. Whilst an independent third party may hand down a judgment, or the parties may reach a settlement agreement, this state is only temporal. Some construction disputes dissipate whist others reach a state of hibernation for a period of time only to pick up momentum and energy some years later. Accordingly, this research suggests that the concept of “dispute resolution” does not exist in the UK construction industry. The ultimate goal should be for parties to reach this ultimate and perpetual state of equilibrium as quickly and as cost effectively as possible: “dispute dissolution”, the slowing down of the dispute’s momentum. Rather than focusing on the design and assemblage of the dispute, the lawyers’ role therein is, or should be, to assist with the “disassembling” of the dispute.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

During the next two decades global construction investment will top $100 trillion (US). New directions in construction innovation will be driven by industry to address challenges in skills, environmental regulations and maximise the benefits of low carbon building systems. Growth productivity catalysts such as offsite construction, higher BIM levels and multi-skill operatives will be instrumental contributors in achieving some of these aims. The increasing use of timber architecture across domestic, public and commercial buildings also opens new pathways. This event will discuss some of the key changes taking place in the UK and parallels with Hong Kong’s ambitions towards delivering a sustainable legacy in this sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction and Demolition Waste (CDW) represents. about 50% of the total Brazilian municipal solid waste: thus, recycling represents huge benefits both in environmental and economic perspectives. Herein, the chemical characterization results of three samples from two different recycling plants from the State of Sao Paulo is prevented. The results demonstrated that the visual classification into grey and red is not related to the chemical composition but mostly to the grain size fraction. The chemical composition of the CDW varies according to the content of cement paste, natural aggregates (quartz sand or granite), red ceramic and clay. Furthermore, the production of recycled concrete aggregates requires two crushing stages to meet the technical standards. The sand fraction (below 4.8 mm) presents high grades of SiO(2), which indicates the liberation of cement paste to fines (< 0.15 mm). The fines have a great potential to be used in the cement industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reconciliation can be divided into stages, each stage representing the performance of a mining operation, such as: long-term estimation, short-term estimation, planning, mining and mineral processing. The gold industry includes another stage which is the budget, when the company informs the financial market of its annual production forecast. The division of reconciliation into stages increases the reliability of the annual budget informed by the mining companies, while also detecting and correcting the critical steps responsible for the overall estimation error by the optimization of sampling protocols and equipment. This paper develops and validates a new reconciliation model for the gold industry, which is based on correct sampling practices and the subdivision of reconciliation into stages, aiming for better grade estimates and more efficient control of the mining industry`s processes, from resource estimation to final production.