952 resultados para Cleaning procedures


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on applying agreed-upon procedures to the Fayette County Engineer’s Office for the period July 1, 2012 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Intraarterial procedures such as chemoembolization and radioembolization aim for the palliative treatment of advanced hepatocellular carcinoma (stage BCLC B and C with tumoral portal thrombosis). The combination of hepatic intraarterial chemotherapy and systemic chemotherapy can increase the probability of curing colorectal cancer with hepatic metastases not immediately accessible to surgical treatment or percutaneous ablation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the Iowa Sheep and Wool Promotion Board for the period July 1, 2011 through June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A research project involving 2, 3, 4, and 5 in. (5.1, 7.6, 10.2, and 12.7 cm) of bonded portland cement concrete (PCC) overlay on a 1.3 mile (2.1 km) PCC pavement was conducted in Clayton County, Iowa, during September 1977, centering on the following objectives: (1) Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense PCC mixture using standard mixes with super water reducing admixtures; (2) Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced PCC resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super water reducing admixtures; and (3) Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced PCC can be obtained with only special surface cleaning and no surface removal or grinding. The conclusions are as follows: (1) Normal mixing equipment and proportioning procedures could be used using a conventional central-mix proportioning plant. This was successful when used with super water reducing admixtures. Only minor changes need be made in procedures and timing. (2) The time has been too short since the completion of the project to determine how the new pavement will perform, however, initially it appears that the method is economical and no reason is seen at this time why the life of the pavement should not be comparable to an all new pavement. (3) The initial test results show that bond strength, regardless of which method of cleaning is used, scarifying, sand blasting or water blasting, far exceed what is considered the minimum bond strength of 200 psi (1379 kPa) except where the paint stripes were intentionally left, thus showing that the paint must be removed. (4) It appears that either cement and water grout or sand, cement and water grout may be used and still obtain the required bond.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Research Project involving two, three, four and five inches of bonded Portland Cement Concrete Overlay on a 1.3 mile Portland Cement Concrete pavement was conducted in Clayton County, Iowa, during September, 1977, centering on the following objectives: 1. Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense Portland Cement Concrete mixture using standard mixes with super-water reducing admixtures; 2. Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced Portland Cement Concrete resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super-water reducing admixtures; 3. Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced Portland Cement Concrete can be obtained with only special surface cleaning and no surface removal or grinding.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Urbana, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Pomeroy, Iowa for the period August 1, 2013 through July 31, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Antibiotic prophylaxis is commonly prescribed to patients with total arthroplasties before a dental intervention. This attitude is not evidence-based for several reasons: 1) the usual pathogens of prosthetic joint infections are not of oral origin; 2) even if given, systemic antibiotic do not completely suppress the occult bacteraemia occurring during dental intervention and 3) humans may have up to twelve episodes of occult bacteraemia of dental origin per day. Routine antibiotic prophylaxis should be clearly distinguished from the antibiotic treatment required in case of established oral cavity infection. A constant optimal oral and dental hygiene is more important in terms of prevention and should be routinely recommended to every patient carrying a joint arthroplasty.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Vincent, Iowa for the period August 1, 2013 through July 31, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Walcott, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Methamphetamine (meth) drug labs are not a new hazard to Iowa. In 2004, federal, state and local authorities seized more than 1,400 Iowa labs. These labs are discovered in houses, apartments, motel rooms, motor vehicles, and even an occasional combine. A dramatic decrease in the number of meth labs occurred in 2005 when a law restricting the purchase of pseudo-ephedrine was implemented. Although the number of meth labs has decreased, they continue to exist. Since there is currently no official federal guidance or regulations on how to clean up a former meth lab, the Iowa Department of Public Health, Division of Environmental Health, has created these basic guidelines to assist public health officials, property owners and the general public in cleaning up former meth lab properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Kimballton, Iowa for the period July 1, 2013 through June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the City of Glidden, Iowa for the period July 1, 2013 through June 30, 2014