234 resultados para CAD3D-BIM


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The research activities involved the application of the Geomatic techniques in the Cultural Heritage field, following the development of two themes: Firstly, the application of high precision surveying techniques for the restoration and interpretation of relevant monuments and archaeological finds. The main case regards the activities for the generation of a high-fidelity 3D model of the Fountain of Neptune in Bologna. In this work, aimed to the restoration of the manufacture, both the geometrical and radiometrical aspects were crucial. The final product was the base of a 3D information system representing a shared tool where the different figures involved in the restoration activities shared their contribution in a multidisciplinary approach. Secondly, the arrangement of 3D databases for a Building Information Modeling (BIM) approach, in a process which involves the generation and management of digital representations of physical and functional characteristics of historical buildings, towards a so-called Historical Building Information Model (HBIM). A first application was conducted for the San Michele in Acerboli’s church in Santarcangelo di Romagna. The survey was performed by the integration of the classical and modern Geomatic techniques and the point cloud representing the church was used for the development of a HBIM model, where the relevant information connected to the building could be stored and georeferenced. A second application regards the domus of Obellio Firmo in Pompeii, surveyed by the integration of the classical and modern Geomatic techniques. An historical analysis permitted the definitions of phases and the organization of a database of materials and constructive elements. The goal is the obtaining of a federate model able to manage the different aspects: documental, analytic and reconstructive ones.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

(ITA) L’industria mondiale odierna nel campo dell’architettura e dell’ingegneria si esprime quasi esclusivamente mediante l’approccio BIM, Building Information Modeling. Anche se sviluppato pensando alle nuove costruzioni ed ancora in via di perfezionamento, è entrato prepotentemente nei capitoli normativi di molti stati all’urlo dell“interoperability”. Su questo tema è recente l’interesse e la possibilità di adozione per l’intervento sul costruito, ovvero di Existing Building Information Modelling, eBIM. Gli studi applicativi-sperimentali in questo ambito sono sempre più numerosi e convergono, purtroppo, sulla delicata correlazione tra la gestione del contenuto semantico e la perdita di interoperabilità. Questa tesi si incentra sull’analisi di tale correlazione valutando in particolare l’aspetto metodologico-applicativo dell’arricchimento semantico adottando come caso studio la Torre Nord della Rocca Estense di San Felice sul Panaro. (ENG)Today's global industry in architecture and engineering fields, expresses itself almost entirely focusing on BIM, Building Information Modeling. Even though it was developed taking in consideration new buildings and the ones that are in the process of improvement, it has entered the regulatory chapters of many states in the hymn of "interoperability". Concerning this topic is recent the interest and possibility of adopting a process to intervene on the already built constructions, Existing Building Information Modeling, eBIM. Application-experimental studies in this area are increasingly numerous and unfortunately converge, on the delicate correlation between the management of the semantic content and the loss of interoperability. This thesis focuses on the analysis of this correlation by evaluating in particular the methodological-applicative aspect of semantic enrichment by adopting the North Tower of the Rocca Estense in San Felice sul Panaro as a case study.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building Information Modelling is changing the design and construction field ever since it entered the market. It took just some time to show its capabilities, it takes some time to be mastered before it could be used expressing all its best features. Since it was conceived to be adopted from the earliest stage of design to get the maximum from the decisional project, it still struggles to adapt to existing buildings. In fact, there is a branch of this methodology that is dedicated to what has been already made that is called Historic BIM or HBIM. This study aims to make clear what are BIM and HBIM, both from a theoretical point of view and in practice, applying from scratch the state of the art to a case study. It had been chosen the fortress of San Felice sul Panaro, a marvellous building with a thousand years of history in its bricks, that suffered violent earthquakes, but it is still standing. By means of this example, it will be shown which are the limits that could be encountered when applying BIM methodology to existing heritage, moreover will be pointed out all the new features that a simple 2D design could not achieve.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La tesi ha come obiettivo quello di analizzare l’evoluzione del settore della manutenzione edilizia e del cambiamento della politica manutentiva in relazione ai progressi portati dai nuovi strumenti informatici: facendo quindi riferimento ad uno specifico caso di studio e integrando l’utilizzo di software BIM, lo scopo è stato quello di programmare un life cycle adeguato. La prima parte della tesi delinea il cambiamento del quadro normativo dell’ambito della manutenzione e definisce lo stato dell’arte della pratica manutentiva, sia dal punto di vista tecnico e applicativo, ma anche da quello gestionale ed economico, con particolare riferimento al Maintenance Management. Nella seconda parte viene invece approfondito il caso studio di uno studentato di Atene facente parte del programma ProGETonE, definendo gli elementi che possono portare ad una corretta gestione del ciclo di vita di questo fabbricato: l’analisi parte da un approccio tradizionale, basato sul computo metrico e sulla PBS, ma si sviluppa e completa attraverso l’utilizzo di Revit e Mantus-P, con la relativa stesura finale di un piano di manutenzione. Questo processo ha portato ad evidenziare le differenze e i vantaggi che si possono trarre dal cambio di prospettiva e di strumenti nell’ambito della manutenzione edilizia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Questa tesi di laurea si pone l’obiettivo di investigare alcune delle nuove frontiere offerte dalla crescita sincretica e multidisciplinare dei linguaggi digitali applicati all’architettura e ai beni culturali. Si approfondiranno i concetti teorici fondamentali dell’informazione digitale: il web semantico come ambiente di scambio, i metadata come informazioni sui dati, i LOD (Link Open Data) come standard e fine. Per l’ambito dei beni culturali verranno presentati i temi di ricerca e sviluppo nel campo della catalogazione e fruizione digitali: ontologie, dizionari normalizzati aperti, database (Catalogo Digitale), etc. Per l’ambito edilizio-architettonico verrà introdotto l’Heritage Building Information Modeling (HBIM) semantico come metodologia multidisciplinare focalizzata su rilievo geometrico, modellazione, archiviazione e scambio di tutte le informazioni utili alla conoscenza e conservazione dei beni storici. Il punto d’incontro tra i due mondi è individuato nella possibilità di arricchire le geometrie attraverso la definizione di una semantica (parametri-metadati) relazionata alle informazioni (valori-dati) presenti nei cataloghi digitali, creando di fatto un modello 3D per architetture storiche con funzione di database multidisciplinare. Sarà presentata la piattaforma web-based Inception, sviluppata dall’omonima startup incubata come spinoff dall’Università di Ferrara, che, tra le diverse applicazioni e potenzialità, verrà utilizzata come strumento per la condivisione e fruizione, garantendo la possibilità di interrogare geometrie e metadati in continuità con i principi LOD. Verrà definito un workflow generale (procedure Scan2BIM, modellazione geometrica, definizione script per l’estrazione automatica dei dati dal Catalogo Digitale, associazione dati-geometrie e caricamento in piattaforma) successivamente applicato e adattato alle precise necessità del caso studio: la Chiesa di S. Maria delle Vergini (MC), su commissione dell’ICCD referente al MiBACT.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The dissertation addresses the still not solved challenges concerned with the source-based digital 3D reconstruction, visualisation and documentation in the domain of archaeology, art and architecture history. The emerging BIM methodology and the exchange data format IFC are changing the way of collaboration, visualisation and documentation in the planning, construction and facility management process. The introduction and development of the Semantic Web (Web 3.0), spreading the idea of structured, formalised and linked data, offers semantically enriched human- and machine-readable data. In contrast to civil engineering and cultural heritage, academic object-oriented disciplines, like archaeology, art and architecture history, are acting as outside spectators. Since the 1990s, it has been argued that a 3D model is not likely to be considered a scientific reconstruction unless it is grounded on accurate documentation and visualisation. However, these standards are still missing and the validation of the outcomes is not fulfilled. Meanwhile, the digital research data remain ephemeral and continue to fill the growing digital cemeteries. This study focuses, therefore, on the evaluation of the source-based digital 3D reconstructions and, especially, on uncertainty assessment in the case of hypothetical reconstructions of destroyed or never built artefacts according to scientific principles, making the models shareable and reusable by a potentially wide audience. The work initially focuses on terminology and on the definition of a workflow especially related to the classification and visualisation of uncertainty. The workflow is then applied to specific cases of 3D models uploaded to the DFG repository of the AI Mainz. In this way, the available methods of documenting, visualising and communicating uncertainty are analysed. In the end, this process will lead to a validation or a correction of the workflow and the initial assumptions, but also (dealing with different hypotheses) to a better definition of the levels of uncertainty.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Modern society is now facing significant difficulties in attempting to preserve its architectural heritage. Numerous challenges arise consequently when it comes to documentation, preservation and restoration. Fortunately, new perspectives on architectural heritage are emerging owing to the rapid development of digitalization. Therefore, this presents new challenges for architects, restorers and specialists. Additionally, this has changed the way they approach the study of existing heritage, changing from conventional 2D drawings in response to the increasing requirement for 3D representations. Recently, Building Information Modelling for historic buildings (HBIM) has escalated as an emerging trend to interconnect geometrical and informational data. Currently, the latest 3D geomatics techniques based on 3D laser scanners with enhanced photogrammetry along with the continuous improvement in the BIM industry allow for an enhanced 3D digital reconstruction of historical and existing buildings. This research study aimed to develop an integrated workflow for the 3D digital reconstruction of heritage buildings starting from a point cloud. The Pieve of San Michele in Acerboli’s Church in Santarcangelo Di Romagna (6th century) served as the test bed. The point cloud was utilized as an essential referential to model the BIM geometry using Autodesk Revit® 2022. To validate the accuracy of the model, Deviation Analysis Method was employed using CloudCompare software to determine the degree of deviation between the HBIM model and the point cloud. The acquired findings showed a very promising outcome in the average distance between the HBIM model and the point cloud. The conducted approach in this study demonstrated the viability of producing a precise BIM geometry from point clouds.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The newly inaugurated Navile District of the University of Bologna is a complex created along the Navile canal, that now houses various teaching and research activities for the disciplines of Chemistry, Industrial Chemistry, Pharmacy, Biotechnology and Astronomy. A Building Information Modeling system (BIM) gives staff of the Navile campus several ways to monitor buildings in the complex throughout their life cycle, one of which is the ability to access real-time environmental data such as room temperature, humidity, air composition, and more, thereby simplifying operations like finding faults and optimizing environmental resource usage. But smart features at Navile are not only available to the staff: AlmaMap Navile is a web application, whose development is documented in this thesis, that powers the public touch kiosks available throughout the campus, offering maps of the district and indications on how to reach buildings and spaces. Even if these two systems, BIM and AlmaMap, don't seem to have many similarities, they share the common intent of promoting awareness for informed decision making in the campus, and they do it while relying on web standards for communication. This opens up interesting possibilities, and is the idea behind AlmaMap Navile 2.0, an app that interfaces with the BIM system and combines real-time sensor data with a comfort calculation algorithm, giving users the ability not just to ask for directions to a space, but also to see its comfort level in advance and, should they want to, check environmental measurements coming from each sensor in a granular manner. The end result is a first step towards building a smart campus Digital Twin, that can support all the people who are part of the campus life in their daily activities, improving their efficiency and satisfaction, giving them the ability to make informed decisions, and promoting awareness and sustainability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As a witness on the industrialization in Bologna, since its first generation was born in the late 1760, the Battiferro lock has been coping with the innovation that the city experienced throughout the centuries, until it has lost its functionality due to the technological development for which Bologna’s canals were gradually covered starting from the 1950s under Giuseppe Dozza ’s administration, as part of the reconstruction, reclamation and urban requalification that was carried out in the aftermath the World War II and which involved the whole city. The interest of the research carried out on this case study was primarily to reintroduce the landmark that is still intact, to what is considered to be the fourth generation of the industrial revolution, namely in the construction field, which is recognized as Construction 4.0, by means of the Historic (or Heritage) Information Modeling HBIM and Virtual Reality (VR) application. A scan-to-BIM approach was followed to create 3D as-built BIM model, as a first step towards the storytelling of the abandoned industrial built asset in VR environment, or as a seed for future applications such as Digital Twins (DT), heritage digital learning, sustainable impact studies, and/or interface with other interfaces such as GIS. Based on the HBIM product, examples of the primary BIM deliverables such as 2D layouts is given, then a workflow to VR is proposed and investigated the reliability of data and the type of users that may benefit of the VR experience, then the potential future development of the model is investigated, with comparison of a relatively similar experience in the UK.