899 resultados para BIM, Masterseries, Navisworks, Revit, Project Management, Portal Frame, Collaboration
Resumo:
Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.
Resumo:
A high productivity rate in Engineering is related to an efficient management of the flow of the large quantities of information and associated decision making activities that are consubstantial to the Engineering processes both in design and production contexts. Dealing with such problems from an integrated point of view and mimicking real scenarios is not given much attention in Engineering degrees. In the context of Engineering Education, there are a number of courses designed for developing specific competencies, as required by the academic curricula, but not that many in which integration competencies are the main target. In this paper, a course devoted to that aim is discussed. The course is taught in a Marine Engineering degree but the philosophy could be used in any Engineering field. All the lessons are given in a computer room in which every student can use each all the treated software applications. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using Ms-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity, ending up with the case of vessel construction. The second part of the course is dedicated to the use of a database manager, Ms-ACCESS, for managing production related information. A series of increasing complexity examples is treated ending up with the management of the pipe database of a real vessel. This database consists of a few thousand of pipes, for which a production timing frame is defined, which connects this part of the course with the first one. Finally, the third part of the course is devoted to the work with FORAN, an Engineering Production package of widespread use in the shipbuilding industry. With this package, the frames and plates where all the outfitting will be carried out are defined through cooperative work by the studens, working simultaneously in the same 3D model. In the paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feed-back from their experience as well as to assess their satisfaction with the learning process. Results from these surveys are discussed in the paper
Resumo:
La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
Acourse focused on the acquisition of integration competencies in ship production engineering, organized in collaboration with selected industry partners, is presented in this paper. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using MS-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity with the final one being the construction planning of a vessel. The second part of the course is dedicated to the use of a database manager, MS-ACCESS, in managing production related information.Aseries of increasing complexity examples is treated, the final one being the management of the piping database of a real vessel. This database consists of several thousand pipes, for which a production timing frame is defined connecting this part of the course with the first one. Finally, the third part of the course is devoted to working withFORAN,an Engineering Production application developed bySENERand widely used in the shipbuilding industry. With this application, the structural elements where all the outfittings will be located are defined through cooperative work by the students, working simultaneously in the same 3D model. In this paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feedback from their experience as well as to assess their satisfaction with the learning process, compared to more traditional ones. Results from these surveys are discussed in the paper.
Resumo:
Nowadays, it has become evident the need to seek sustainable development models that address challenges arising in a variety of contexts. The resilience concept appears connected to the ability of people to cope with adversities that inevitably arise due to context dynamics, at different spatial and temporal scales. This concept is related to the model known as Working With People (WWP), focused on rural development projects planning, management and evaluation, from the integration of three dimensions: technical-entrepreneurial, ethical-social and political-contextual. The research reported is part of the RETHINK European Project, whose overall aim is farm modernization and rural resilience. The resilience concept has been analyzed, in the scope of rural development projects management, and a relationship with the WWP model has been established. To this end, a thorough review of the scientific literature concerning this topic has been addressed, in order to develop the state of the art of the different concepts and models involved. A conceptual proposal for the integration of resilience in rural development projects sustainable management, through the three-dimensional WWP model is presented.
Communication Project for development: 25 years of experience in andean rural communities in Ecuador
Resumo:
IThis paper analyses communication for development from a new perspective: the project in its broader and most genuine sense, as an instrument for changing current reality. This is examined from both its theoretical and practical implementation side. Knowledge/action binomial as a two-way relationship is one of the basis of the project cycle. It allows for better knowing the reality that the project itself (what constitutes the action) is intended to improve. Besides that, this knowledge/action binomial also offers new knowledge that nourishes future actions (projects). From a project based communication perspective, the project nourishes the knowledge, which leads to a transformative action. Reflecting about the action is a new knowledge source whose adoption by the community is eased by the communication process. Radio Mensaje project among the indigenous Andean communities in Cayambe (Ecuador) was born and also developed within this approach, supporting the collaborative participation in project management. This leads to the development process which is described in this case study.
Resumo:
In Chile, during the last three decades there has been a strong decentralization process whose main objective has been to improve the management of schools through the transfer of responsibilities and resources of education and thus improve the outcome of learning, reducing equity gaps between schools and territories. This is how, there has been an evolution of school principals¿ professional profile from an administrative to a management approach, in which principals have become project managers of educational projects. From a competence model for school leaders, based on IPMA guidelines, the present article presents an analysis of best practices for school management, allowing to generate a link between competencies and school management, from the perspective of project management. Results showed that the different competence elements, have relative weights according to the different practice fields, and that this analysis can be considered as a strategic element in educational project planning and development.
Resumo:
In Chile, during the last three decades there has been a strong decentralization process whose main objective has been to improve the management of schools through the transfer of responsibilities and resources of education and thus improve the outcome of learning, reducing equity gaps between schools and territories. This is how, there has been an evolution of school principals¿ professional profile from an administrative to a management approach, in which principals have become project managers of educational projects. From a competence model for school leaders, based on IPMA guidelines, the present article presents an analysis of best practices for school management, allowing to generate a link between competencies and school management, from the perspective of project management. Results showed that the different competence elements, have relative weights according to the different practice fields, and that this analysis can be considered as a strategic element in educational project planning and development.
Resumo:
En la actualidad no se concibe una empresa, por pequeña que esta sea, sin algún tipo de servicio TI. Se presenta para cada empresa el reto de emprender proyectos para desarrollar o contratar servicios de TI que soporten los diferentes procesos de negocio de la empresa. Por otro lado, a menos que los servicios de TI estén aislados de toda red, lo cual es prácticamente imposible en la actualidad, no existe un servicio o un proyecto que lo desarrolle garantizando el 100% de seguridad. Así la empresa maneja una dualidad entre desarrollar productos/servicios de TI seguros y el mantenimiento constante de sus servicios TI en estado seguro. La gestión de los proyectos para el desarrollo de los servicios de TI se aborda, en la mayoría de las empresas, aplicando distintas prácticas, utilizadas en otros proyectos y recomendadas, a tal efecto, por marcos y estándares con mayor reconocimiento. Por lo general, estos marcos incluyen, entre sus procesos, la gestión de los riesgos orientada al cumplimiento de plazos, de costes y, a veces, de la funcionalidad del producto o servicio. Sin embargo, en estas prácticas se obvian los aspectos de seguridad (confidencialidad, integridad y disponibilidad) del producto/servicio, necesarios durante el desarrollo del proyecto. Además, una vez entregado el servicio, a nivel operativo, cuando surge algún fallo relativo a estos aspectos de seguridad, se aplican soluciones ad-hoc. Esto provoca grandes pérdidas y, en ocasiones, pone en peligro la continuidad de la propia empresa. Este problema, se va acrecentando cada día más, en cualquier tipo de empresa y, son las PYMEs, por su la falta de conocimiento del problema en sí y la escasez de recursos metodológicos y técnicos, las empresas más vulnerables. Por todo lo anterior, esta tesis doctoral tiene un doble objetivo. En primer lugar, demostrar la necesidad de contar con un marco de trabajo que, integrado con otros posibles marcos y estándares, sea sencillo de aplicar en distintos tipos y envergaduras de proyectos, y que guíe a las PYMEs en la gestión de proyectos para el desarrollo seguro y posterior mantenimiento de la seguridad de sus servicios de TI. En segundo lugar, cubrir esta necesidad desarrollando un marco de trabajo que ofrezca un modelo de proceso genérico aplicable sobre distintos patrones de proyecto y una librería de activos de seguridad que sirva a las PYMEs de guía durante el proceso de gestión del proyecto para el desarrollo seguro. El modelo de proceso del marco propuesto describe actividades en los tres niveles organizativos de la empresa (estratégico, táctico y operativo). Está basado en el ciclo de mejora continua (PDCA) y en la filosofía Seguridad por Diseño, propuesta por Siemens. Se detallan las prácticas específicas de cada actividad, las entradas, salidas, acciones, roles, KPIs y técnicas aplicables para cada actividad. Estas prácticas específicas pueden aplicarse o no, a criterio del jefe de proyecto y de acuerdo al estado de la empresa y proyecto que se quiera desarrollar, estableciendo así distintos patrones de proceso. Para la validación del marco se han elegido dos PYMEs. La primera del sector servicios y la segunda del sector TIC. El modelo de proceso ha sido aplicado sobre un mismo patrón de proyecto que responde a necesidades comunes a ambas empresas. El patrón de proceso ha sido valorado en los proyectos elegidos en ambas empresas, antes y después de su aplicación. Los resultados del estudio, después de su aplicación en ambas empresas, han permitido la validación del patrón de proceso, en la mejora de la gestión de proyecto para el desarrollo seguro de TI en las PYMEs. ABSTRACT Today a company without any IT service is not conceived, even if it is small either. It presents the challenge for each company to undertake projects to develop or contract IT services that support the different business processes of the company. On the other hand, unless IT services are isolated from whole network, which is virtually impossible at present, there is no service or project, which develops guaranteeing 100% security. So the company handles a duality, develop products / insurance IT services and constant maintenance of their IT services in a safe state. The project management for the development of IT services is addressed, in most companies, using different practices used in other projects and recommended for this purpose by frameworks and standards with greater recognition. Generally, these frameworks include, among its processes, risk management aimed at meeting deadlines, costs and, sometimes, the functionality of the product or service. However, safety issues such as confidentiality, integrity and availability of the product / service, necessary for the project, they are ignored in these practices. Moreover, once the service delivered at the operational level, when a fault on these safety issues arise, ad-hoc solutions are applied. This causes great losses and sometimes threatens the continuity of the company. This problem is adding more every day, in any kind of business and SMEs are, by their lack of knowledge of the problem itself and the lack of methodological and technical resources, the most vulnerable companies. For all these reasons, this thesis has two objectives. Firstly demonstrate the need for a framework that integrated with other possible frameworks and standards, it is simple to apply in different types and wingspans of projects, and to guide SMEs in the management of development projects safely, and subsequent maintenance of the security of their IT services. Secondly meet this need by developing a framework that provides a generic process model applicable to project different patterns and a library of security assets, which serve to guide SMEs in the process of project management for development safe. The process model describes the proposed activities under the three organizational levels of the company (strategic, tactical and operational). It is based on the continuous improvement cycle (PDCA) and Security Design philosophy proposed by Siemens. The specific practices, inputs, outputs, actions, roles, KPIs and techniques applicable to each activity are detailed. These specific practices can be applied or not, at the discretion of the project manager and according to the state of the company and project that the company wants to develop, establishing different patterns of process. Two SMEs have been chosen to validate the frame work. The first of the services sector and the second in the ICT sector. The process model has been applied on the same pattern project that responds to needs common to both companies. The process pattern has been valued at the selected projects in both companies before and after application. The results of the study, after application in both companies have enabled pattern validation process, improving project management for the safe development of IT in SMEs.
Resumo:
"IEPA/WPC/82-001".
Resumo:
Because organizations are making large investments in Information systems (IS), efficient IS project management has been found critical to success. This study examines how the use of incentives can improve the project success. Agency theory is used to: identify motivational factors of project success, help the IS owners to understand to what extent management incentives can improve IS development and implementation (ISD/I). The outcomes will help practitioners and researchers to build on theoretical model of project management elements which lead to project success. Given the principal-agent nature of most significant scale of IS development, insights that will allow for greater alignment of the agent’s goals with those of the principal through incentive contracts, will serve to make ISD/I both more efficient and more effective, leading to more successful IS projects.
Resumo:
This paper describes and analyses an innovative engineering management course that applies a project management framework in the context of a feasibility study for a prospective research project. The aim is to have students learn aspects of management that will be relevant from the outset of their professional career while simultaneously having immediate value in helping them to manage a research project and capstone design project in their senior year. An integral part of this innovation was the development of a web-based project management tool. While the main objectives of the new course design were achieved, a number of important lessons were learned that would guide the further development and continuous improvement of this course. The most critical of these is the need to achieve the optimum balance in the mind of the students between doing the project and critically analyzing the processes used to accomplish the work.