765 resultados para water shortages, risk management, business
Resumo:
Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.
Resumo:
Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.
Resumo:
Construction projects are risky. A build-operate-transfer (BOT) project is recognised as one of the most risky project schemes. This scheme has been employed rather frequently in the past few decades, in both developed and developing countries. However, because of its risky nature, there have been failures as well as successes. Risk analysis in an appropriate way is desirable in implementing BOT projects. There are various tools and techniques applicable to risk analysis. The application of these risk analysis tools and techniques (RATTs) to BOT projects depends on an understanding of the contents and contexts of BOT projects, together with a thorough understanding of RATTs. This paper studies key points in their applications through reviews of relevant literatures and discusses the application of RATTs to BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants, i.e. government, lenders and project companies. Discussion is also made with regard to political risks, which are very important in BOT projects. A flow chart has been introduced to select an appropriate tool for risk management in BOT projects. This study contributes to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
This study demonstrates a quantitative approach to construction risk management through analytic hierarchy process and decision tree analysis. All the risk factors are identified, their effects are quantified by determining probability and severity, and various alternative responses are generated with cost implication for mitigating the quantified risks. The expected monetary values are then derived for each alternative in a decision tree framework and subsequent probability analysis aids the decision process in managing risks. The entire methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.
Resumo:
The behaviour of control functions in safety critical software systems is typically bounded to prevent the occurrence of known system level hazards. These bounds are typically derived through safety analyses and can be implemented through the use of necessary design features. However, the unpredictability of real world problems can result in changes in the operating context that may invalidate the behavioural bounds themselves, for example, unexpected hazardous operating contexts as a result of failures or degradation. For highly complex problems it may be infeasible to determine the precise desired behavioural bounds of a function that addresses or minimises risk for hazardous operation cases prior to deployment. This paper presents an overview of the safety challenges associated with such a problem and how such problems might be addressed. A self-management framework is proposed that performs on-line risk management. The features of the framework are shown in context of employing intelligent adaptive controllers operating within complex and highly dynamic problem domains such as Gas-Turbine Aero Engine control. Safety assurance arguments enabled by the framework necessary for certification are also outlined.
River basin surveillance using remotely sensed data: a water resources information management system
Resumo:
This thesis describes the development of an operational river basin water resources information management system. The river or drainage basin is the fundamental unit of the system; in both the modelling and prediction of hydrological processes, and in the monitoring of the effect of catchment management policies. A primary concern of the study is the collection of sufficient and sufficiently accurate information to model hydrological processes. Remote sensing, in combination with conventional point source measurement, can be a valuable source of information, but is often overlooked by hydrologists, due to the cost of acquisition and processing. This thesis describes a number of cost effective methods of acquiring remotely sensed imagery, from airborne video survey to real time ingestion of meteorological satellite data. Inexpensive micro-computer systems and peripherals are used throughout to process and manipulate the data. Spatial information systems provide a means of integrating these data with topographic and thematic cartographic data, and historical records. For the system to have any real potential the data must be stored in a readily accessible format and be easily manipulated within the database. The design of efficient man-machine interfaces and the use of software enginering methodologies are therefore included in this thesis as a major part of the design of the system. The use of low cost technologies, from micro-computers to video cameras, enables the introduction of water resources information management systems into developing countries where the potential benefits are greatest.
Resumo:
The aim of this research is to investigate how risk management in a healthcare organisation can be supported by knowledge management. The subject of research is the development and management of existing logs called "risk registers", through specific risk management processes employed in a N.H.S. (Foundation) Trust in England, in the U.K. Existing literature on organisational risk management stresses the importance of knowledge for the effective implementation of risk management programmes, claiming that knowledge used to perceive risk is biased by the beliefs of individuals and groups involved in risk management and therefore is considered incomplete. Further, literature on organisational knowledge management presents several definitions and categorisations of knowledge and approaches for knowledge manipulation in the organisational context as a whole. However, there is no specific approach regarding "how to deal" with knowledge in the course of organisational risk management. The research is based on a single case study, on a N.H.S. (Foundation) Trust, is influenced by principles of interpretivism and the frame of mind of Soft Systems Methodology (S.S.M.) to investigate the management of risk registers, from the viewpoint of people involved in the situation. Data revealed that knowledge about risks and about the existing risk management policy and procedures is situated in several locations in the Trust and is neither consolidated nor present where and when required. This study proposes a framework that identifies required knowledge for each of the risk management processes and outlines methods for conversion of this knowledge, based on the SECI knowledge conversion model, and activities to facilitate knowledge conversion so that knowledge is effectively used for the development of risk registers and the monitoring of risks throughout the whole Trust under study. This study has theoretical impact in the management science literature as it addresses the issue of incomplete knowledge raised in the risk management literature using concepts of the knowledge management literature, such as the knowledge conversion model. In essence, the combination of required risk and risk management related knowledge with the required type of communication for risk management creates the proposed methods for the support of each risk management process for the risk registers. Further, the indication of the importance of knowledge in risk management and the presentation of a framework that consolidates knowledge required for the risk management processes and proposes way(s) for the communication of this knowledge within a healthcare organisation have practical impact in the management of healthcare organisations.
Resumo:
This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.
Resumo:
In recent years the topic of risk management has moved up the agenda of both government and industry, and private sector initiatives to improve risk and internal control systems have been mirrored by similar promptings for change in the public sector. Both regulators and practitioners now view risk management as an integral part of the process of corporate governance, and an aid to the achievement of strategic objectives. The paper uses case study material on the risk management control system at Birmingham City Council to extend existing theory by developing a contingency theory for the public sector. The case demonstrates that whilst the structure of the control system fits a generic model, the operational details indicate that controls are contingent upon three core variables—central government policies, information and communication technology and organisational size. All three contingent variables are suitable for testing the theory across the broader public sector arena.
Resumo:
This article takes the perspective that risk knowledge and the activities related to RM practice can benefit from the implementation of KM processes and systems, to produce a better enterprise wide implementation of risk management. Both in the information systems discipline and elsewhere, there has been a trend towards greater integration and consolidation in the management of organizations. Some examples of this are: Enterprise Resource Planning (Stevens, 2003), Enterprise Architecture (Zachmann, 1996) and Enterprise Content Management (Smith & McKeen, 2003). Similarly, risk management is evolving into Enterprise Risk Management. KM’s importance in breaking down silos within an organization can help it to do so.
Resumo:
This paper starts from the viewpoint that enterprise risk management is a specific application of knowledge in order to control deviations from strategic objectives, shareholders’ values and stakeholders’ relationships. This study is looking for insights into how the application of knowledge management processes can improve the implementation of enterprise risk management. This article presents the preliminary results of a survey on this topic carried out in the financial services sector, extending a previous pilot study that was in retail banking only. Five hypotheses about the relationship of knowledge management variables to the perceived value of ERM implementation were considered. The survey results show that the two people-related variables, perceived quality of communication among groups and perceived quality of knowledge sharing were positively associated with the perceived value of ERM implementation. However, the results did not support a positive association for the three variables more related to technology, namely network capacity for connecting people (which was marginally significant), risk management information system functionality and perceived integration of the information systems. Perceived quality of communication among groups appeared to be clearly the most significant of these five factors in affecting the perceived value of ERM implementation.
Resumo:
Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs related to knowledge sharing, and two risk management concepts: perceived quality of risk control and perceived value of enterprise risk management. From a literature review, relationships with eight knowledge management variables covering people, process and technology aspects were hypothesised. A survey was administered to risk management employees in financial institutions. The results showed that the perceived quality of risk control is significantly associated with four knowledge management variables: perceived quality of risk knowledge sharing, perceived quality of communication among people, web channel functionality, and risk management information system functionality. However, the relationships of the knowledge management variables to the perceived value of enterprise risk management are not significant. We conclude that better knowledge management is associated with better risk control, but that more effort needs to be made to break down organizational silos in order to support true Enterprise Risk Management.