867 resultados para value-mapping, corporate responsibility, urban infrastructure, construction innovation, corporate reporting
Resumo:
This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.
Resumo:
This report reviews the selection, design, and installation of fiber reinforced polymer systems for strengthening of reinforced concrete or pre-stressed concrete bridges and other structures. The report is prepared based on the knowledge gained from worldwide experimental research, analytical work, and field applications of FRP systems used to strengthen concrete structures. Information on material properties, design and installation methods of FRP systems used as external reinforcement are presented. This information can be used to select an FRP system for increasing the strength and stiffness of reinforced concrete beams or the ductility of columns, and other applications. Based on the available research, the design considerations and concepts are covered in this report. In the next stage of the project, these will be further developed as design tools. It is important to note, however, that the design concepts proposed in literature have not in many cases been thoroughly developed and proven. Therefore, a considerable amount of research work will be required prior to development of the design concepts into practical design tools, which is a major goal of the current research project. The durability and long-term performance of FRP materials has been the subject of much research, which still are on going. Long-term field data are not currently available, and it is still difficult to accurately predict the life of FRP strengthening systems. The report briefly addresses environmental degradation and long-term durability issues as well. A general overview of using FRP bars as primary reinforcement of concrete structures is presented in Chapter 8. In Chapter 9, a summary of strengthening techniques identified as part of this initial stage of the research project and the issues which require careful consideration prior to practical implementation of these identified techniques are presented.
Resumo:
The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.
Resumo:
A worldwide interest is being generated in the use of fibre reinforced polymer composites (FRP) in rehabilitation of reinforced concrete structures. As a replacement for the traditional steel plates or external post-tensioning in strengthening applications, various types of FRP plates, with their high strength to weight ratio and good resistance to corrosion, represent a class of ideal material in external retrofitting. Within the last ten years, many design guidelines have been published to provide guidance for the selection, design and installation of FRP systems for external strengthening of concrete structures. Use of these guidelines requires understanding of a number of issues pertaining to different properties and structural failure modes specific to these materials. A research initiative funded by the CRC for Construction Innovation was undertaken (primarily at RMIT) to develop a decision support tool and a user friendly guide for use of fibre reinforced polymer composites in rehabilitation of concrete structures. The user guidelines presented in this report were developed after industry consultation and a comprehensive review of the state of the art technology. The scope of the guide was mainly developed based on outcomes of two workshops with Queensland Department of Main Roads (QDMR). The document covers material properties, recommended construction requirements, design philosophy, flexural, shear and torsional strengthening of beams and strengthening of columns. In developing this document, the guidelines published on FIB Bulletin 14 (2002), Task group 9.3, International Federation of Structural Concrete (FIB) and American Concrete Institute Committee 440 report (2002) were consulted in conjunction with provisions of the Austroads Bridge design code (1992) and Australian Concrete Structures code AS3600 (2002). In conclusion, the user guide presents design examples covering typical strengthening scenarios.
Resumo:
This report is an attempt to present the current state of product and process modelling in the building industry in general, and in construction planning and scheduling in particular. This report endeavours to describe what has been achieved by the Construction Planning Workbench (CPW) project.
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
This is an internal report of the BRITE Project’s activities for 2003. The goal of the Project is to improve the incidence and quality of innovation in the Australian building and construction industry. The primary aim of the year’s work was to complete six case studies of innovation in the Australian building and construction industry. A secondary aim was to prepare for the Project’s innovation survey to be conducted in 2004. The case study program was undertaken to demonstrate the benefits of innovation and show how businesses successfully implement their innovations. The innovation survey is intended to run every 2nd year over the life of the CRC in order to benchmark innovation performance as a tool for public sector policy development and business strategy development. Appendix A contains a list of papers produced by the BRITE Project in 2003. The remainder of this report focuses on the case study program, which was successfully completed during 2003, with six booklets being produced.
Resumo:
This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
The BRITE Project undertook six innovation case studies of building and construction projects in 2005. The purpose of the program was to demonstrate the benefits of innovation and highlight the nature of successful implementation strategies. The cases were selected following a public call in industry magazines across Australia, which resulted in approximately 50 nominations. The six selected case studies resulted in three prominent contributions to knowledge
Resumo:
This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
There can be many interpretations of relationship management. In this short report, we are concerned with relationships arising under an alliance project and in managing stakeholders under a more traditional approach to procurement. Each aspect is supported by an example project.