985 resultados para pool boiling
Resumo:
"January 28, 1960."
Resumo:
"Prepared under contract with the United States Atomic Energy Commission, GNEC/AEC contract AT-(40-I)-2674 and PRWRA/AEC contract AT-(40-I)-2672."
Resumo:
Shamsuddin al-Hasani Abu Zayd; 1 29/64 in.x 1 ft. 1 55/64 in.x 9 59/64 in.; stone-paste painted over glaze with luster
Resumo:
Thebes (deserted settlement), Egypt; H: 2 ft. 1 13/64 in.; W: 2 ft. 4 47/64 in. (painting); painted plaster
Resumo:
"Nuclear Power Group."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"Prepared under Contract AT(04-3)-165 with the United States Atomic Energy Commission."
Resumo:
"Series No. 163, Issue No. 2"--Cover.
Resumo:
"Contract AT(30-1)-2789."
Resumo:
Work performed at CANEL.
Resumo:
"Report title: Theoretical investigations of the transition from bubble boiling to film boiling at forced convection"--p. v.
Resumo:
Mode of access: Internet.
Resumo:
"February 27, 1981."
Resumo:
"Prepared for the Metropolitan Water Reclamation District of Greater Chicago."--Cover.