904 resultados para load compensation
Resumo:
Load Rating: . , :Evaluation of the capacity of a bridge to carry vehicle Inventory Rating: Lbad level which can safely utilize the bridge for an indefinite period of time Operating Rating: Absolute maximum permissible load level for the bridge A load rating states the load in tons which a vehicle can impose on a bridge. Changes in guidelines, standards, and customary uses of bridges require analyses of bridges to be updated and re-evaluated. In this report, twenty-two secondary bridge standards for three types of bridges are rated for the AASHTO HS20-44 vehicle configuration and three typical Iowa legal vehicles
Resumo:
• Examine current pile design and construction procedures used by the Iowa Department of Transportation (DOT). • Recommend changes and improvements to these procedures that are consistent with available pile load test data, soils information, and bridge design practice recommended by the Load and Resistance Factor Design (LRFD) approach.
Resumo:
The 2008 general assembly acknowledged in House File 2539, Section 70 that is recognizes direct care workers play a vital role and make a valuable contribution to Iowa's Health Care Reform efforts in providing care to Iowans with a variety of needs in both institutional and home and community based settings. the legislation identified that recruiting and retaining highly competent direct care workers is a challenge across all healthcare employment settings.
Resumo:
The fate of a small oral dose of protein given to overnight-starved rats was studied. After 3 h, 62 per cent of the protein amino acids had been absorbed. Most of the absorbed N went into the bloodstream through the portal in the form of amino acids, but urea and ammonia were also present. About one-quarter of all absorbed N was carried as lymph amino acids. The liver was able to take all portal free ammonia and a large proportion of portal amino acids, releasing urea. The hepatic N balance was negative, indicating active proteolysis and net loss of liver protein.
Resumo:
Several European telecommunications regulatory agencies have recently introduced a fixed capacity charge (flat rate) to regulate access to the incumbent's network. The purpose of this paper is to show that the optimal capacity charge and the optimal access-minute charge analysed by Armstrong, Doyle, and Vickers (1996) have a similar structure and imply the same payment for the entrant. I extend the analysis tothe case where there is a competitor with market power. In this case, the optimalcapacity charge should be modified to avoid that the entrant cream-skims the market,fixing a longer or a shorter peak period than the optimal. Finally, I consider a multiproduct setting, where the effect of the product differentiation is exacerbated.
Resumo:
River regulation for the purposes of public water supply causes the flow regime downstream of a dam to change. Traditionally, in the UK, such regulation was accompanied by requirements for reservoir releases to compensate downstream water users (e.g. industry) for the loss of natural flow (compensation flows). In this article, we compare a unique pre-impoundment macroinvertebrate data set for a regulated upland river with survey data post-impoundment. This allows a longitudinal assessment of the response of the system to regulation. The Derwent River, Northumberland, was impounded in 1966. Impacts on the hydrological regime were quantified by comparing long-term hydrographs, flow duration curves, flow ranges and flashiness indices for the pre-impoundment and post-impoundment periods. The comparison of changes in macroinvertebrate richness and diversity post-impoundment showed that the change in flow regime has had limited effect on the ecological community structure. The flow regime of the Derwent River has become less flashy with fewer extreme events, and the richness and the diversity of macroinvertebrates have, in some cases, increased and at worst have not deteriorated. We suggest that this reflects the strict compensation regime, which has guaranteed minimum flows at all times. Copyright (c) 2012 John Wiley & Sons, Ltd.
Resumo:
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of performing such testing, and perform outreach to local, state, and national engineers on the topic of bridge load testing and rating. This report documents one of three bridges inspected, load tested, and load rated as part of the project, the Sioux County Bridge (FHWA #308730), including testing procedures and performance of the bridge under static loading along with the calculated load rating from the field-calibrated analytical model. Two parallel reports document the testing and load rating of the Ida County Bridge (FHWA #186070) and the Johnson County Bridge (FHWA #205750). A tech brief provides overall information about the project.
Resumo:
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of performing such testing, and perform outreach to local, state, and national engineers on the topic of bridge load testing and rating. This report documents one of three bridges inspected, load tested, and load rated as part of the project, the Ida County Bridge (FHWA #186070), including testing procedures and performance of the bridge under static loading along with the calculated load rating from the field-calibrated analytical model. Two parallel reports document the testing and load rating of the Sioux County Bridge (FHWA #308730) and the Johnson County Bridge (FHWA #205750). A tech brief provides overall information about the project.
Resumo:
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of performing such testing, and perform outreach to local, state, and national engineers on the topic of bridge load testing and rating. This report documents one of three bridges inspected, load tested, and load rated as part of the project, the Johnson County Bridge (FHWA #205750), including testing procedures and performance of the bridge under static loading along with the calculated load rating from the field-calibrated analytical model. Two parallel reports document the testing and load rating of the Sioux County Bridge (FHWA #308730) and the Ida County Bridge (FHWA #186070). A tech brief provides overall information about the project.
Resumo:
This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where bridge testing may be economically feasible given truck traffic and detour lengths.
Resumo:
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of performing such testing, and perform outreach to local, state, and national engineers on the topic of bridge load testing and rating. The three final reports document one each of three bridges inspected, load tested, and load rated as part of the project. The bridges include the Sioux County Bridge (FHWA #308730), the Ida County Bridge (FHWA #186070), and the Johnson County Bridge (FHWA #205750). Actions included testing procedures and performance of the bridge under static loading along with the calculated load rating from the field-calibrated analytical model. A Tech Transfer Summary provides overall information about the project.
Resumo:
OBJECTIVES: An article by the Swiss AIDS Commission states that patients with stably suppressed viraemia [i.e. several successive HIV-1 RNA plasma concentrations (viral loads, VL) below the limits of detection during 6 months or more of highly active antiretroviral therapy (HAART)] are unlikely to be infectious. Questions then arise: how reliable is the undetectability of the VL, given the history of measures? What factors determine reliability? METHODS: We assessed the probability (henceforth termed reliability) that the n+1 VL would exceed 50 or 1000 HIV-1 RNA copies/mL when the nth one had been <50 copies/mL in 6168 patients of the Swiss HIV Cohort Study who were continuing to take HAART between 2003 and 2007. General estimating equations were used to analyse potential factors of reliability. RESULTS: With a cut-off at 50 copies/mL, reliability was 84.5% (n=1), increasing to 94.5% (n=5). Compliance, the current type of HAART and the first antiretroviral therapy (ART) received (HAART or not) were predictive factors of reliability. With a cut-off at 1000 copies/mL, reliability was 97.5% (n=1), increasing to 99.1% (n=4). Chart review revealed that patients had stopped their treatment, admitted to major problems with compliance or were taking non-HAART ART in 72.2% of these cases. Viral escape caused by resistance was found in 5.6%. No explanation was found in the charts of 22.2% of cases. CONCLUSIONS: After several successive VLs at <50 copies/mL, reliability reaches approximately 94% with a cut-off of 50 copies/mL and approximately 99% with a cut-off at 1000 copies/mL. Compliance is the most important factor predicting reliability.
Resumo:
OBJECTIVES: Toll-like receptors (TLRs) are innate immune sensors that are integral to resisting chronic and opportunistic infections. Mounting evidence implicates TLR polymorphisms in susceptibilities to various infectious diseases, including HIV-1. We investigated the impact of TLR single nucleotide polymorphisms (SNPs) on clinical outcome in a seroincident cohort of HIV-1-infected volunteers. DESIGN: We analyzed TLR SNPs in 201 antiretroviral treatment-naive HIV-1-infected volunteers from a longitudinal seroincident cohort with regular follow-up intervals (median follow-up 4.2 years, interquartile range 4.4). Participants were stratified into two groups according to either disease progression, defined as peripheral blood CD4(+) T-cell decline over time, or peak and setpoint viral load. METHODS: Haplotype tagging SNPs from TLR2, TLR3, TLR4, and TLR9 were detected by mass array genotyping, and CD4(+) T-cell counts and viral load measurements were determined prior to antiretroviral therapy initiation. The association of TLR haplotypes with viral load and rapid progression was assessed by multivariate regression models using age and sex as covariates. RESULTS: Two TLR4 SNPs in strong linkage disequilibrium [1063 A/G (D299G) and 1363 C/T (T399I)] were more frequent among individuals with high peak viral load compared with low/moderate peak viral load (odds ratio 6.65, 95% confidence interval 2.19-20.46, P < 0.001; adjusted P = 0.002 for 1063 A/G). In addition, a TLR9 SNP previously associated with slow progression was found less frequently among individuals with high viral setpoint compared with low/moderate setpoint (odds ratio 0.29, 95% confidence interval 0.13-0.65, P = 0.003, adjusted P = 0.04). CONCLUSION: This study suggests a potentially new role for TLR4 polymorphisms in HIV-1 peak viral load and confirms a role for TLR9 polymorphisms in disease progression.
Resumo:
Human-induced habitat fragmentation constitutes a major threat to biodiversity. Both genetic and demographic factors combine to drive small and isolated populations into extinction vortices. Nevertheless, the deleterious effects of inbreeding and drift load may depend on population structure, migration patterns, and mating systems and are difficult to predict in the absence of crossing experiments. We performed stochastic individual-based simulations aimed at predicting the effects of deleterious mutations on population fitness (offspring viability and median time to extinction) under a variety of settings (landscape configurations, migration models, and mating systems) on the basis of easy-to-collect demographic and genetic information. Pooling all simulations, a large part (70%) of variance in offspring viability was explained by a combination of genetic structure (F(ST)) and within-deme heterozygosity (H(S)). A similar part of variance in median time to extinction was explained by a combination of local population size (N) and heterozygosity (H(S)). In both cases the predictive power increased above 80% when information on mating systems was available. These results provide robust predictive models to evaluate the viability prospects of fragmented populations.
Resumo:
In this report, sixteen secondary and primary bridge standards for two types of bridges are rated for AASHTO HS20-44 vehicle configuration utilizing Load Factor methodology. The ratings apply only to those bridges which: (1) are built according to the applicable bridge standard plans, (2) have no structural deterioration or damage, and (3) have no added wearing surface in excess of one-half inch integral wearing surface.