985 resultados para energy plant
Resumo:
Includes bibliographical references.
Resumo:
"Metals, Ceramics, and Materials (TID-4500, 20th Ed.)."
Resumo:
"United States Atomic Energy Commission Contract No. AT (49-6)-916."
Resumo:
"United States Atomic Energy Commission, Savannah River Operations Office, Contract AT (38-1) 213, supplements 1 & 2."
Resumo:
Hearings held in Sacramento, Feb. 15-Mar. 9, 1973
Resumo:
"Contract No. AT(49-1)-621."
Resumo:
"Contract No. AT(49-1)-621."
Resumo:
Mode of access: Internet.
Resumo:
"February 1982."
Resumo:
GPO copy lacks plate.
Resumo:
"April 1972."
Resumo:
Prepared for the Illinois Dept. of Energy and Natural Resources, Energy and Environmental Affairs Division.
Resumo:
"HWRIC project number 87-034."
Resumo:
The Illinois Environmental Protection Agency (Illinois EPA) was asked by the Illinois General Assembly to examine whether the State should address further potential restrictions on power plant pollution. This request was made under Section 9-10 of the Environmental Protection Act (Act). This is a report of the Illinois EPA's findings. The Illinois EPA has prepared this report of its findings to date based on consideration of a broad spectrum of issues including health benefits, the impact of the reliability of the power grid, the impact on consumer utility rates and the impact on jobs and Illinois' economy. It provides an overview of the principal issues, presents a review of the information we have gathered that addresses those issues, lists information gaps, and uncertainties and finally, lists the work that remains to develop a solution that does not create unintended adverse economic consequences for the people of Illinois.
Resumo:
Cover title.