936 resultados para construction techniques
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.
Resumo:
Determining an appropriate research methodology is considered as an important element in a research study; especially in a doctoral research study. It involves approach to the entire process of a research study, starting from theoretical underpinnings and spanning to data collection and analysis, and extending to developing the solutions for the problems investigated. Research methodology in essence is focused around the problems to be investigated in a research study and therefore varies according to the problems investigated. Thus, identifying the research methodology that best suits a research in hand is important, not only as it will benefit achieving the set objectives of a research, but also as it will serve establishing the credibility of the work. Research philosophy, approach, strategy, choice, and techniques are inherent components of the methodology. Research strategy provides the overall direction of the research including the process by which the research is conducted. Case study, experiment, survey, action research, grounded theory and ethnography are examples for such research strategies. Case study is documented as an empirical inquiry that investigates a contemporary phenomenon within its real-life context, especially when the boundaries between phenomenon and context are not clearly evident. Case study was adopted as the overarching research strategy, in a doctoral study developed to investigate the resilience of construction Small and Medium-sized Enterprises (SMEs) in the UK to extreme weather events. The research sought to investigate how construction SMEs are affected by EWEs, respond to the risk of EWEs, and means of enhancing their resilience to future EWEs. It is argued that utilising case study strategy will benefit the research study, in achieving the set objectives of the research and answering the research questions raised, by comparing and contrasting with the alternative strategies available. It is also claimed that the selected strategy will contribute towards addressing the call for improved methodological pluralism in construction management research, enhancing the understanding of complex network of relationships pertinent to the industry and the phenomenon being studied.
Resumo:
Lineup procedures have recently garnered extensive empirical attention, in an effort to reduce the number of mistaken identifications that plague the criminal justice system. Relatively little attention, however, has been paid to the influence of the lineup constructor or the lineup construction technique on the quality of the lineup. This study examined whether the cross-race effect has an influence on the quality of lineups constructed using a match-to-suspect or match-to-description technique in a series of three phases. Participants generated descriptions of same- and other-race targets in Phase 1, which were used in Phase 2. In Phase 2, participants were asked to create lineups for own-race targets and other-race targets using one of two techniques. The lineups created in this phase were examined for lineup quality in Phase 3 by calculating lineup fairness assessments through the use of a mock witness paradigm. ^ Overall, the results of these experiment phases suggest that the race of those involved in the lineup construction process influences lineups. There was no difference in witness description accuracy in Phase 1, which ran counter to predictions based on the cross-race effect. The cross-race effect was observed, however, in Phases 2 and 3. The lineup construction technique used also influenced several of the process measures, selection estimates, and fairness judgments in Phase 2. Interestingly, the presence of the cross-race effect was in the opposite direction as predicted for some measures in both phases. In Phase 2, the cross-race effect was as predicted for number of foils viewed, but in the opposite direction for average time spent viewing each foil. In Phase 3, the cross-race effect was in the opposite direction than predicted, with higher levels of lineup fairness in other-race lineups. The practical implications of these findings are discussed in relation to lineup fairness within the legal system. ^
Resumo:
Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, non-integrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. ^ A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. ^ One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects. ^
Resumo:
Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, nonintegrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects.
Resumo:
Many buildings constructed during the middle of the 20th century were constructed with criteria that fall short of current requirements. Although shortcomings are possible in all aspects of the design, the inadequacies in terms of seismic design present a more pressing issue to human life. This risk has been seen in various earthquakes that have struck Italy recently, and subsequently, the codes have been altered to account for this underestimated danger. Structures built after these changes remain at risk and must be retrofitted depending on their use. This report centers around the Giovanni Michelucci Institute of Mathematics at the University of Bologna and the work required to modify the building so that it can withstand 60% of the current design requirements. The goal of this particular report is to verify the previous reports written in Italian and present an accurate analysis along with intervention suggestions for this particular building. The work began with an investigation into the previous sources and work to find out how the structure had been interpreted. After understanding the building, corrections were made where required, and the failing elements were organized graphically to more easily show where the building needed the most work. Once the critical zones were mapped, remediation techniques were tested on the top floor, and the modeling techniques and effects of the interventions were presented to assist in further work on the structure.
Resumo:
The importance of non-destructive techniques (NDT) in structural health monitoring programmes is being critically felt in the recent times. The quality of the measured data, often affected by various environmental conditions can be a guiding factor in terms usefulness and prediction efficiencies of the various detection and monitoring methods used in this regard. Often, a preprocessing of the acquired data in relation to the affecting environmental parameters can improve the information quality and lead towards a significantly more efficient and correct prediction process. The improvement can be directly related to the final decision making policy about a structure or a network of structures and is compatible with general probabilistic frameworks of such assessment and decision making programmes. This paper considers a preprocessing technique employed for an image analysis based structural health monitoring methodology to identify sub-marine pitting corrosion in the presence of variable luminosity, contrast and noise affecting the quality of images. A preprocessing of the gray-level threshold of the various images is observed to bring about a significant improvement in terms of damage detection as compared to an automatically computed gray-level threshold. The case dependent adjustments of the threshold enable to obtain the best possible information from an existing image. The corresponding improvements are observed in a qualitative manner in the present study.
Resumo:
Le présent mémoire entend analyser la pratique de l’auto-filmage dans deux films : La Pudeur ou l’impudeur (Hervé Guibert) et Tarnation (Jonathan Caouette). Nous regroupons ces long-métrages sous l’étiquette « auto-filmage pathographique ». Le malade, s’émancipant de l’imagerie médicale et des pratiques cinématographiques institutionnelles, reprend l’image filmique à son compte, aidé en cela par une technologie toujours plus ergonomique. Cette résurgence de l’image du corps malade dans le champ social ne se fait pas sans heurt ; l’exposition de corps décharnés et agoniques convoque un imaginaire catastrophiste et contredit les rituels d’effacement du corps auxquels procède la société occidentale. La forme que prend le récit de soi dans l’auto-filmage pathographique dépend de la maladie qui affecte chaque créateur. Nous observons une redéfinition de la sincérité, en lien avec l’exercice autobiographique. Il s’agit d’utiliser, dans l’auto-filmage pathographique, certains procédés fictionnels pour créer un discours sur soi-même dont la véracité repose sur d’autres critères que ceux communément admis. L’auto-filmage pathographique suppose en ce sens un véritable changement d’attitude et la mise en place de techniques de soi. Il induit une forme de réconciliation avec sa propre identité physique et psychique. En cela, l’écriture filmique de soi est un agent transformateur de la vie et un exercice spirituel. Les réalisateurs ne sont cependant pas uniquement tournés vers eux-mêmes. Chacun inclut quelques privilégiés au coeur de sa démarche. Le soin de soi, dans l’auto-filmage pathographique, ne se désolidarise pas du soin des autres. Auto-filmage et caméra subjective entretiennent un lien dialectique qui donne son sens à l’auto-filmage pathographique et voit leur antagonisme éclater. L’individu s’auto-filmant n’est pas seul ; sa démarche n’est pas qu’un solipsisme. Elle se voit dépassée par l’émergence de l’autre dans le champ ou parfois même, sa prise en main de la caméra.
Resumo:
This research recognizes the cognitive contributions to the students participating in the Third Costa Rican Biological Sciences Olympics that will define the advancement and strengthening in the construction of its conceptual dimension in the scientific literacy. This paper is based, mainly, on qualitative approach techniques (ethnographic design: case study); however, some data are interpreted through quantitative methodologies (descriptive design with an explanatory and exploratory touch) for the analysis of a sample of 54 high school students, finalists in the category A of the Olympics, through the use of tools such as a documentary study and a survey, in July 2009. The information generated was analyzed using elements of inferential and descriptive statistics, figures and histograms. It was proved that there is a better cognitive management in the topics assessed, an increase in the students’ academic performance as the tests are applied, a commitment for the academic update supported by the development of several tasks for previous preparation, curriculum contributions unprecedented based on our sample, a consent to optimize student’s knowledge about Biology, which will allow the application of scientific notions to diversify and renew the knowledge, according to what is established in the principles of scientific literacy.