310 resultados para bike lanes


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The goal of this paper is to evaluate whether the incentives incorporated in toll highway concession contracts in order to encourage private operators to adopt measures to reduce accidents are actually effective at improving safety. To this end, we implemented negative binomial regression models using information about highway characteristics and accident data from toll highway concessions in Spain from 2007 to 2009. Our results show that even though road safety is highly influenced by variables that are not managed by the contractor, such as the annual average daily traffic (AADT), the percentage of heavy vehicles on the highway, number of lanes, number of intersections and average speed; the implementation of these incentives has a positive influence on the reduction of accidents and injuries. Consequently, this measure seems to be an effective way of improving safety performance in road networks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El planteamiento tradicional de análisis de la accidentalidad en carretera pasa por la consideración de herramientas paliativas, como son la identificación y gestión de los puntos negros o tramos de concentración de accidentes, o preventivas, como las auditorías e inspecciones de seguridad vial. En esta tesis doctoral se presenta un planteamiento complementario a estas herramientas, desde una perspectiva novedosa: la consideración de los tramos donde no se producen accidentes; son los denominados Tramos Blancos. La tesis persigue demostrar que existen determinados parámetros del diseño de las carreteras y del tráfico que, bajo características generales similares de las vías, tienen influencia en el hecho de que se produzcan o no accidentes, adicionalmente a la exposición al riesgo, como factor principal, y a otros factores. La propia definición de los Tramos Blancos, entendidos como tramos de carreteras de longitud representativa donde no se han producido accidentes con víctimas mortales o heridos graves durante un periodo largo de tiempo, garantiza que esta situación no se produzca como consecuencia de la aleatoriedad de los accidentes, sino que pudiera deberse a una confluencia específica de determinados parámetros de la geometría de la vía y del tráfico total y de vehículos pesados. Para el desarrollo de esta investigación se han considerado la red de autopistas de peaje y las carreteras convencionales de la Red del Estado de España, que supone un total de 17.000 kilómetros, y los datos de accidentes con víctimas mortales y heridos graves en el periodo 2006-2010, ambos incluidos, en estas redes (un total de 10.000 accidentes). La red viaria objeto de análisis supone el 65% de la longitud de la Red de Carreteras del Estado, por la que circula el 33% de su tráfico; en ella se produjeron en el año 2013 el 47% de los accidentes con víctimas y el 60% de las víctimas mortales de la Red de Carreteras del Estado. Durante la investigación se ha desarrollado una base de datos de 250.130 registros y más de 3.5 millones de datos en el caso de las autopistas de peaje de la Red de Carreteras del Estado y de 935.402 registros y más de 14 millones de datos en el caso de la red convencional del Estado analizada. Tanto las autopistas de peaje como las carreteras convencionales han sido clasificadas según sus características de tráfico, de manera que se valoren vías con nivel de exposición al riesgo similar. Para cada tipología de vía, se ha definido como longitud de referencia para que un tramo se considere Tramo Blanco la longitud igual al percentil 95 de las longitudes de tramos sin accidentes con heridos graves o víctimas mortales durante el periodo 2006-2010. En el caso de las autopistas de peaje, en la tipología que ha sido considerada para la definición del modelo, esta longitud de referencia se estableció en 14.5 kilómetros, mientras que en el caso de las carreteras convencionales, se estableció en 7.75 kilómetros. Para cada uno de los tipos de vía considerados se han construido una base de datos en la que se han incluido las variables de existencia o no de Tramo Blanco, así como las variables de tráfico (intensidad media diaria total, intensidad de vehículos pesados y porcentaje de vehículos pesados ), la velocidad media y las variables de geometría (número de carriles, ancho de carril, ancho de arcén derecho e izquierdo, ancho de calzada y plataforma, radio, peralte, pendiente y visibilidad directa e inversa en los casos disponibles); como variables adicionales, se han incluido el número de accidentes con víctimas, los fallecidos y heridos graves, índices de peligrosidad, índices de mortalidad y exposición al riesgo. Los trabajos desarrollados para explicar la presencia de Tramos Blancos en la red de autopistas de peaje han permitido establecer las diferencias entre los valores medios de las variables de tráfico y diseño geométrico en Tramos Blancos respecto a tramos no blancos y comprobar que estas diferencias son significativas. Así mismo, se ha podido calibrar un modelo de regresión logística que explica parcialmente la existencia de Tramos Blancos, para rangos de tráfico inferiores a 10.000 vehículos diarios y para tráficos entre 10.000 y 15.000 vehículos diarios. Para el primer grupo (menos de 10.000 vehículos al día), las variables que han demostrado tener una mayor influencia en la existencia de Tramo Blanco son la velocidad media de circulación, el ancho de carril, el ancho de arcén izquierdo y el porcentaje de vehículos pesados. Para el segundo grupo (entre 10.000 y 15.000 vehículos al día), las variables independientes más influyentes en la existencia de Tramo Blanco han sido la velocidad de circulación, el ancho de calzada y el porcentaje de vehículos pesados. En el caso de las carreteras convencionales, los diferentes análisis realizados no han permitido identificar un modelo que consiga una buena clasificación de los Tramos Blancos. Aun así, se puede afirmar que los valores medios de las variables de intensidad de tráfico, radio, visibilidad, peralte y pendiente presentan diferencias significativas en los Tramos Blancos respecto a los no blancos, que varían en función de la intensidad de tráfico. Los resultados obtenidos deben considerarse como la conclusión de un análisis preliminar, dado que existen otros parámetros, tanto de diseño de la vía como de la circulación, el entorno, el factor humano o el vehículo que podrían tener una influencia en el hecho que se analiza, y no se han considerado por no disponer de esta información. En esta misma línea, el análisis de las circunstancias que rodean al viaje que el usuario de la vía realiza, su tipología y motivación es una fuente de información de interés de la que no se tienen datos y que permitiría mejorar el análisis de accidentalidad en general, y en particular el de esta investigación. Adicionalmente, se reconocen limitaciones en el desarrollo de esta investigación, en las que sería preciso profundizar en el futuro, reconociendo así nuevas líneas de investigación de interés. The traditional approach to road accidents analysis has been based in the use of palliative tools, such as black spot (or road sections) identification and management, or preventive tools, such as road safety audits and inspections. This thesis shows a complementary approach to the existing tools, from a new perspective: the consideration of road sections where no accidents have occurred; these are the so-called White Road Sections. The aim of this thesis is to show that there are certain design parameters and traffic characteristics which, under similar circumstances for roads, have influence in the fact that accidents occur, in addition to the main factor, which is the risk exposure, and others. White Road Sections, defined as road sections of a representative length, where no fatal accidents or accidents involving serious injured have happened during a long period of time, should not be a product of randomness of accidents; on the contrary, they might be the consequence of a confluence of specific parameters of road geometry, traffic volumes and heavy vehicles traffic volumes. For this research, the toll motorway network and single-carriageway network of the Spanish National Road Network have been considered, which is a total of 17.000 kilometers; fatal accidents and those involving serious injured from the period 2006-2010 have been considered (a total number of 10.000 accidents). The road network covered means 65% of the total length of the National Road Network, which allocates 33% of traffic volume; 47% of accidents with victims and 60% of fatalities happened in these road networks during 2013. During the research, a database of 250.130 registers and more than 3.5 million data for toll motorways and 935.042 registers and more than 14 million data for single carriageways of the National Road Network was developed. Both toll motorways and single-carriageways have been classified according to their traffic characteristics, so that the analysis is performed over roads with similar risk exposure. For each road type, a reference length for White Road Section has been defined, as the 95 percentile of all road sections lengths without accidents (with fatalities or serious injured) for 2006-2010. For toll motorways, this reference length concluded to be 14.5 kilometers, while for single-carriageways, it was defined as 7.75 kilometers. A detailed database was developed for each type of road, including the variable “existence of White Road Section”, as well as variables of traffic (average daily traffic volume, heavy vehicles average daily traffic and percentage of heavy vehicles from the total traffic volume), average speed and geometry variables (number of lanes, width of lane, width of shoulders, carriageway width, platform width, radius, superelevation, slope and visibility); additional variables, such as number of accidents with victims, number of fatalities or serious injured, risk and fatality rates and risk exposure, have also been included. Research conducted for the explanation of the presence of White Road Sections in the toll motorway network have shown statistically significant differences in the average values of variables of traffic and geometric design in White Road Sections compared with other road sections. In addition, a binary logistic model for the partial explanation of the presence of White Road Sections was developed, for traffic volumes lower than 10.000 daily vehicles and for those running from 10.000 to 15.000 daily vehicles. For the first group, the most influent variables for the presence of White Road Sections were the average speed, width of lane, width of left shoulder and percentage of heavy vehicles. For the second group, the most influent variables were found to be average speed, carriageway width and percentage of heavy vehicles. For single-carriageways, the different analysis developed did not reach a proper model for the explanation of White Road Sections. However, it can be assumed that the average values of the variables of traffic volume, radius, visibility, superelevation and slope show significant differences in White Road Sections if compared with others, which also vary with traffic volumes. Results obtained should be considered as a conclusion of a preliminary analysis, as there are other parameters, not only design-related, but also regarding traffic, environment, human factor and vehicle which could have an influence in the fact under research, but this information has not been considered in the analysis, as it was not available. In parallel, the analysis of the circumstances around the trip, including its typology and motivation is an interesting source of information, from which data are not available; the availability of this information would be useful for the improvement of accident analysis, in general, and for this research work, in particular. In addition, there are some limitations in the development of the research work; it would be necessary to develop an in-depth analysis in the future, thus assuming new research lines of interest.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La competitividad del transporte de mercancías depende del estado y funcionamiento de las redes existentes y de sus infraestructuras, no del modo de transporte. En concreto, la rentabilidad o la reducción de los costes de producción del transporte marítimo se vería incrementado con el uso de buques de mayor capacidad y con el desarrollo de plataformas portuarias de distribución o puertos secos, ya que el 90% del comercio entre la Unión Europea y terceros países se realiza a través de sus puertos a un promedio de 3,2 billones de toneladas de mercancías manipuladas cada año y el 40% del tráfico intraeuropeo utiliza el transporte marítimo de corta distancia. A pesar de que los puertos europeos acogen anualmente a más de 400 millones de pasajeros, los grandes desarrollos se han producido en los puertos del norte de Europa (Róterdam, Amberes, Ámsterdam). Los países del Sur de Europa deben buscar nuevas fórmulas para ser más competitivos, ya sea mediante creación de nuevas infraestructuras o mediante refuerzo de las existentes, ofreciendo los costes de los puertos del Norte. El fomento del transporte marítimo y fluvial como alternativa al transporte por carretera, especialmente el transporte marítimo de corta distancia, ha sido impulsado por la Comisión Europea (CE) desde 2003 a través de programas de apoyo comunitario de aplicación directa a las Autopistas del Mar, a modo de ejemplo, cabría citar los programas Marco Polo I y II, los cuales contaron con una dotación presupuestaria total de 855 millones de euros para el período 2003 – 2013; en ese período de tiempo se establecieron objetivos de reducción de congestión vial y mejora del comportamiento medio ambiental del sistema de transporte de mercancías dentro de la comunidad y la potenciación de la intermodalidad. El concepto de Autopista del Mar surge en el Libro Blanco de Transportes de la Comisión Europea “La política europea de transportes de cara al 2010: La hora de la verdad” del 12 de diciembre de 2001, en el marco de una política europea para fomento y desarrollo de sistemas de transportes sostenibles. Las Autopistas del Mar consisten en rutas marítimas de corta distancia entre dos puntos, de menor distancia que por vía terrestre, en las que a través del transporte intermodal mejoran significativamente los tiempos y costes de la cadena logística, contribuyen a la reducción de accidentes, ruidos y emisiones de CO2 a la atmósfera, permite que los conductores pierdan horas de trabajo al volante y evita el deterioro de las infraestructuras terrestres, con el consiguiente ahorro en mantenimiento. La viabilidad de una Autopista del Mar depende tanto de factores de ubicación geográficos, como de características propias del puerto, pasando por los diferentes requerimientos del mercado en cada momento (energéticos, medio ambientales y tecnológicos). Existe un elemento nuevo creado por la Comisión Europea: la red transeuropea de transportes (RTE-T). En el caso de España, con sus dos accesos por los Pirineos (La Junquera e Irún) como únicos pasos terrestres de comunicación con el continente y con importantes limitaciones ferroviarias debido a los tres anchos de vía distintos, le resta competitividad frente al conjunto europeo; por el contrario, España es el país europeo con más kilómetros de costa (con más de 8.000 km) y con un emplazamiento geográfico estratégico, lo que le convierte en una plataforma logística para todo el sur de Europa, por lo que las Autopistas del Mar tendrán un papel importante y casi obligado para el desarrollo de los grandes corredores marítimos que promueve Europa. De hecho, Gijón y Vigo lo han hecho muy bien con sus respectivas líneas definidas como Autopistas del Mar y que conectan con el puerto francés de Nantes-Saint Nazaire, ya que desde ahí los camiones pueden coger rutas hacia el Norte. Paralelamente, la Unión Europea ha iniciado los pasos para el impulso de la primera Autopista del Mar que conectará España con el mercado de Reino Unido, concretamente los Puertos de Bilbao y Tilbury. Además, España e Italia sellaron un acuerdo internacional para desarrollar Autopistas del Mar entre ambos países, comprometiéndose a impulsar una docena de rutas entre puertos del litoral mediterráneo español y el italiano. Actualmente, están en funcionando los trayectos como Barcelona-Génova, Valencia-Civitavecchia y Alicante- Nápoles, notablemente más cortos por mar que por carretera. Bruselas identificó cuatro grandes corredores marítimos que podrían concentrar una alta densidad de tráfico de buques, y en dos de ellos España ya tenía desde un principio un papel crucial. La Comisión diseñó el 14 de abril de 2004, a través del proyecto West-Mos, una red de tráfico marítimo que tiene como vías fundamentales la denominada Autopista del Báltico (que enlaza Europa central y occidental con los países bálticos), la Autopista de Europa suroriental (que une el Adriático con el Jónico y el Mediterráneo más oriental) y también la Autopista de Europa occidental y la Autopista de Europa suroccidental (que enlazan España con Reino Unido y la Francia atlántica y con la Francia mediterránea e Italia, respectivamente). Para poder establecer Autopistas del Mar entre la Península Ibérica y el Norte de Europa primará especialmente la retirada de camiones en la frontera pirenaica, donde el tráfico pesado tiene actualmente una intensidad media diaria de 8.000 unidades, actuando sobre los puntos de mayor congestión, como por ejemplo los Alpes, los Pirineos, el Canal de la Mancha, las carreteras fronterizas de Francia y Euskadi, y proponiendo el traslado de las mercancías en barcos o en trenes. Por su parte, para contar con los subsidios y apoyos europeos las rutas seleccionadas como Autopistas del Mar deben mantener una serie de criterios de calidad relacionados con la frecuencia, coste “plataforma logística a plataforma logística”, simplicidad en procedimientos administrativos y participación de varios países, entre otros. Los estudios consideran inicialmente viables los tramos marítimos superiores a 450 millas, con un volumen de unas 15.000 plataformas al año y que dispongan de eficientes comunicaciones desde el puerto a las redes transeuropeas de autopistas y ferrocarril. Otro objetivo de las Autopistas del Mar es desarrollar las capacidades portuarias de forma que se puedan conectar mejor las regiones periféricas a escala del continente europeo. En lo que a Puertos se refiere, las terminales en los muelles deben contar con una línea de atraque de 250 m., un calado superior a 8 m., una rampa “ro-ro” de doble calzada, grúas portainer, y garantizar operatividad para un mínimo de dos frecuencias de carga semanales. El 28 de marzo de 2011 se publicó el segundo Libro Blanco sobre el futuro del transporte en Europa “Hoja de ruta hacia un espacio único europeo de transporte: por una política de transportes competitiva y sostenible”, donde se definió el marco general de las acciones a emprender en los próximos diez años en el ámbito de las infraestructuras de transporte, la legislación del mercado interior, la reducción de la dependencia del carbono, la tecnología para la gestión del tráfico y los vehículos limpios, así como la estandarización de los distintos mercados. Entre los principales desafíos se encuentran la eliminación de los cuellos de botella y obstáculos diversos de nuestra red europea de transporte, minimizar la dependencia del petróleo, reducir las emisiones de GEI en un 60% para 2050 con respecto a los niveles de 1990 y la inversión en nuevas tecnologías e infraestructuras que reduzcan estas emisiones de transporte en la UE. La conexión entre la UE y el norte de África provoca elevados niveles de congestión en los puntos más críticos del trayecto: frontera hispano-francesa, corredor del Mediterráneo y el paso del estrecho. A esto se le añade el hecho de que el sector del transporte por carretera está sujeto a una creciente competencia de mercado motivada por la eliminación de las barreras europeas, mayores exigencias de los cargadores, mayores restricciones a los conductores y aumento del precio del gasóleo. Por otro lado, el mercado potencial de pasajeros tiene una clara diferenciación en tipos de flujos: los flujos en el período extraordinario de la Operación Paso del Estrecho (OPE), enfocado principalmente a marroquíes que vuelven a su país de vacaciones; y los flujos en el período ordinario, enfocado a la movilidad global de la población. Por tanto, lo que se pretende conseguir con este estudio es analizar la situación actual del tráfico de mercancías y pasajeros con origen o destino la península ibérica y sus causas, así como la investigación de las ventajas de la creación de una conexión marítima (Autopista del Mar) con el Norte de África, basándose en los condicionantes técnicos, administrativos, económicos, políticos, sociales y medio ambientales. The competitiveness of freight transport depends on the condition and operation of existing networks and infrastructure, not the mode of transport. In particular, profitability could be increased or production costs of maritime transport could be reduced by using vessels with greater capacity and developing port distribution platforms or dry ports, seeing as 90% of trade between the European Union and third countries happens through its ports. On average 3,2 billion tonnes of freight are handled annualy and 40% of intra-European traffic uses Short Sea Shipping. In spite of European ports annually hosting more than 400 million passengers, there have been major developments in the northern European ports (Rotterdam, Antwerp, Amsterdam). Southern European countries need to find new ways to be more competitive, either by building new infrastructure or by strengthening existing infrastructure, offering costs northern ports. The use of maritime and river transport as an alternative to road transport, especially Short Sea Shipping, has been driven by the European Commission (EC) from 2003 through community support programs for the Motorways of the Sea. These programs include, for example, the Marco Polo I and II programs, which had a total budget of 855 million euros for the period 2003-2013. During this time objectives were set for reducing road congestion, improving the environmental performance of the freight transport system within the community and enhancing intermodal transport. The “Motorway of the Sea” concept arises in the European Commission’s Transport White Paper "European transport policy for 2010: time to decide" on 12 December 2001, as part of a European policy for the development and promotion of sustainable transport systems. A Motorway of the Sea is defined as a short sea route between two points, covering less distance than by road, which provides a significant improvement in intermodal transport times and to the cost supply chain. It contributes to reducing accidents, noise and CO2 emissions, allows drivers to shorten their driving time and prevents the deterioration of land infrastructure thereby saving on maintenance costs. The viability of a Motorway of the Sea depends as much on geographical location factors as on characteristics of the port, taking into account the different market requirements at all times (energy, environmental and technological). There is a new element created by the European Commission: the trans-European transport network (TEN-T). In the case of Spain, with its two access points in the Pyrenees (La Junquera and Irun) as the only land crossings connected to the mainland and major railway limitations due to the three different gauges, it appears less competitive compared to Europe as a whole. However, Spain is the European country with the most kilometers of coastline (over 8,000 km) and a strategic geographical location, which makes it a logistics platform for the all of Southern Europe. This is why the Motorways of the Sea will have an important role, and an almost necessary one to develop major maritime corridors that Europe supports. In fact, Gijon and Vigo have done very well with their respective sea lanes defined as Motorways of the Sea and which connect with the French port of Nantes-Saint Nazaire, as from there trucks can use nort-heading routes. In parallel, the European Union has taken the first steps to boost the first Motorway of the Sea linking Spain to the UK market, specifically the ports of Bilbao and Tilbury. Furthermore, Spain and Italy sealed an international agreement to develop Motorways of the Sea between both countries, pledging to develop a dozen routes between ports on the Spanish and Italian Mediterranean coasts. Currently, there are sea lanes already in use such as Barcelona-Genova, Valencia-Civitavecchia and Alicante-Naples, these are significantly shorter routes by sea than by road. Brussels identified four major maritime corridors that could hold heavy concentrate shipping traffic, and Spain had a crucial role in two of these from the beginning. On 14 April 2004 the Commission planned through the West-Mos project, a network of maritime traffic which includes the essential sea passages the so-called Baltic Motorway (linking Central and Western Europe with the Baltic countries), the southeast Europe Motorway (linking the Adriatic to the Ionian and eastern Mediterranean Sea), the Western Europe Motorway and southwestern Europe Motorway (that links Spain with Britain and the Atlantic coast of France and with the French Mediterranean coast and Italy, respectively). In order to establish Motorways of the Sea between the Iberian Peninsula and Northern Europe especially, it is necessary to remove trucks from the Pyrenean border, where sees heavy traffic (on average 8000 trucks per day) and addressing the points of greatest congestion, such as the Alps, the Pyrenees, the English Channel, the border roads of France and Euskadi, and proposing the transfer of freight on ships or trains. For its part, in order to receive subsidies and support from the European Commission, the routes selected as Motorways of the Sea should maintain a series of quality criteria related to frequency, costs "from logistics platform to logistics platform," simplicity in administrative procedures and participation of several countries, among others. To begin with, studies consider viable a maritime stretch of at least 450 miles with a volume of about 15,000 platforms per year and that have efficient connections from port to trans-European motorways and rail networks. Another objective of the Motorways of the Sea is to develop port capacity so that they can better connect peripheral regions across the European continent. Referring ports, the terminals at the docks must have a berthing line of 250 m., a draft greater than 8 m, a dual carriageway "ro-ro" ramp, portainer cranes, and ensure operability for a minimum of two loads per week. On 28 March 2011 the second White Paper about the future of transport in Europe "Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system" was published. In this Paper the general framework of actions to be undertaken in the next ten years in the field of transport infrastructure was defined, including internal market legislation, reduction of carbon dependency, traffic management technology and clean vehicles, as well as the standardization of different markets. The main challenges are how to eliminate bottlenecks and various obstacles in our European transport network, minimize dependence on oil, reduce GHG emissions by 60% by 2050 compared to 1990 levels and encourage investment in new technologies and infrastructure that reduce EU transport emissions. The connection between the EU and North Africa causes high levels of congestion on the most critical points of the journey: the Spanish-French border, the Mediterranean corridor and Gibraltar Strait. In addition to this, the road transport sector is subject to increased market competition motivated by the elimination of European barriers, greater demands of shippers, greater restrictions on drivers and an increase in the price of diesel. On the other hand, the potential passenger market has a clear differentiation in type of flows: flows in the special period of the Crossing the Straits Operation (CSO), mainly focused on Moroccans who return home on vacation; and flows in the regular session, focused on the global mobile population. Therefore, what I want to achieve with this study is present an analysis of the current situation of freight and passengers to or from the Iberian Peninsula and their causes, as well as present research on the advantages of creating a maritime connection (Motorways of the Sea) with North Africa, based on the technical, administrative, economic, political, social and environmental conditions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Focally evoked calcium waves in astrocyte cultures have been thought to propagate by gap-junction-mediated intercellular passage of chemical signal(s). In contrast to this mechanism we observed isolated astrocytes, which had no physical contact with other astrocytes in the culture, participating in a calcium wave. This observation requires an extracellular route of astrocyte signaling. To directly test for extracellular signaling we made cell-free lanes 10–300 μm wide in confluent cultures by deleting astrocytes with a glass pipette. After 4–8 hr of recovery, regions of confluent astrocytes separated by lanes devoid of cells were easily located. Electrical stimulation was used to initiate calcium waves. Waves crossed narrow (<120 μm) cell-free lanes in 15 of 36 cases, but failed to cross lanes wider than 120 μm in eight of eight cases. The probability of crossing narrow lanes was not correlated with the distance from the stimulation site, suggesting that cells along the path of the calcium wave release the extracellular messenger(s). Calculated velocity across the acellular lanes was not significantly different from velocity through regions of confluent astrocytes. Focal superfusion altered both the extent and the direction of calcium waves in confluent regions. These data indicate that extracellular signals may play a role in astrocyte–astrocyte communication in situ.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Esta pesquisa interdisciplinar centrada no segmento da fotografia de acervo de intelectual apresenta o estudo de caso de 84 imagens feitas pelo fotógrafo amador Ulysses Freyre de alguns prédios e ruas das cidades de Olinda e do Recife entre 1923 e 1925. Ulysses fotografou durante passeios de bicicleta aos domingos ao lado do irmão, o sociólogo Gilberto Freyre. Objetiva-se traçar os dois usos dados por Gilberto às fotos de Ulysses: de base aos desenhos de Manoel Bandeira para o \"Livro do Nordeste\", organizado pelo sociólogo em 1925 para o centenário do Diário de Pernambuco; e como parte da concepção de inventário de edificações da arquitetura civil que serviu à Inspetoria de Monumentos Estaduais em 1928 em Pernambuco. Vale-se do campo acerca do circuito fotográfico nestas cidades, que estavam sob reformas urbanas no início do século XX, a fim de situar e revelar a fotografia de Ulysses como artefato de memória propulsor do embrionário projeto político-intelectual de Gilberto neste período. As fotos estão no acervo da Fundação Gilberto Freyre, em Recife, Pernambuco.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: An accurate plan of the town of Boston and its vicinity : exhibiting a ground plan of all the streets, lanes, alleys, wharves, and public buildings in Boston, with the names and description thereof, likewise all the flats and channels between Boston and Charlestown, Cambridge, Roxbury & Dorchester with the two bridges and causeway, and the boundary lines beween Boston and the above mentioned towns from ... by Osgood Carleton ; I. Norman, sc. It was published and sold by Osgood Carleton in 1797. Scale [ca. 1:4,170]. This layer is image 4 of 4 total images, representing the southeast portion of the four sheet source map. The image inside the map neatline is georeferenced to the surface of the earth and fit to the Massachusetts State Plane Coordinate System, Mainland Zone (in Feet) (Fipszone 2001). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, selected public buildings, city ward boundaries, wharves, and more. Relief shown by hachures.This layer is part of a selection of digitally scanned and georeferenced historic maps of Massachusetts from the Harvard Map Collection. These maps typically portray both natural and manmade features. The selection represents a range of regions, originators, ground condition dates (1755-1922), scales, and purposes. The digitized selection includes maps of: the state, Massachusetts counties, town surveys, coastal features, real property, parks, cemeteries, railroads, roads, public works projects, etc.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: An accurate plan of the town of Boston and its vicinity : exhibiting a ground plan of all the streets, lanes, alleys, wharves, and public buildings in Boston, with the names and description thereof, likewise all the flats and channels between Boston and Charlestown, Cambridge, Roxbury & Dorchester with the two bridges and causeway, and the boundary lines beween Boston and the above mentioned towns from ... by Osgood Carleton ; I. Norman, sc. It was published and sold by Osgood Carleton in 1797. Scale [ca. 1:4,170]. This layer is image 3 of 4 total images, representing the southwest portion of the four sheet source map. The image inside the map neatline is georeferenced to the surface of the earth and fit to the Massachusetts State Plane Coordinate System, Mainland Zone (in Feet) (Fipszone 2001). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, selected public buildings, city ward boundaries, wharves, and more. Relief shown by hachures.This layer is part of a selection of digitally scanned and georeferenced historic maps of Massachusetts from the Harvard Map Collection. These maps typically portray both natural and manmade features. The selection represents a range of regions, originators, ground condition dates (1755-1922), scales, and purposes. The digitized selection includes maps of: the state, Massachusetts counties, town surveys, coastal features, real property, parks, cemeteries, railroads, roads, public works projects, etc.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: An accurate plan of the town of Boston and its vicinity : exhibiting a ground plan of all the streets, lanes, alleys, wharves, and public buildings in Boston, with the names and description thereof, likewise all the flats and channels between Boston and Charlestown, Cambridge, Roxbury & Dorchester with the two bridges and causeway, and the boundary lines beween Boston and the above mentioned towns from ... by Osgood Carleton ; I. Norman, sc. It was published and sold by Osgood Carleton in 1797. Scale [ca. 1:4,170]. This layer is image 1 of 4 total images, representing the northwest portion of the four sheet source map. The image inside the map neatline is georeferenced to the surface of the earth and fit to the Massachusetts State Plane Coordinate System, Mainland Zone (in Feet) (Fipszone 2001). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, selected public buildings, city ward boundaries, wharves, and more. Relief shown by hachures.This layer is part of a selection of digitally scanned and georeferenced historic maps of Massachusetts from the Harvard Map Collection. These maps typically portray both natural and manmade features. The selection represents a range of regions, originators, ground condition dates (1755-1922), scales, and purposes. The digitized selection includes maps of: the state, Massachusetts counties, town surveys, coastal features, real property, parks, cemeteries, railroads, roads, public works projects, etc.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: Englands glory, or, the glory of England being a new mapp of the city of London : shewing the remarkable streets, lanes, alleyes, churches, halls courts, and other places as they are now rebuilt, the which will therefore be a guide to strangers, and such as are not well acquainted herein to direct them from place to place : diverse faults y[t] are in y[e] former are in this amended, allsoe the severall figures y[t] stand up and downe in the mapp are explained in y[e] 2 tables at y[e] upper corners hereof. It was published by Robert Walton ca. 1676. Scale [ca. 1:60,000]. The image inside the map neatline is georeferenced to the surface of the earth and fit to British National Grid coordinate system (British National Grid, Airy Spheroid OSGB (1936) Datum). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, built-up areas, selected buildings pictorially, fortification, docks, parks, ground cover, and more. Includes also indexes. This layer is part of a selection of digitally scanned and georeferenced historic maps from The Harvard Map Collection as part of the Imaging the Urban Environment project. Maps selected for this project represent major urban areas and cities of the world, at various time periods. These maps typically portray both natural and manmade features at a large scale. The selection represents a range of regions, originators, ground condition dates, scales, and purposes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: An accurate plan of the town of Boston and its vicinity : exhibiting a ground plan of all the streets, lanes, alleys, wharves, and public buildings in Boston, with the names and description thereof, likewise all the flats and channels between Boston and Charlestown, Cambridge, Roxbury & Dorchester with the two bridges and causeway, and the boundary lines beween Boston and the above mentioned towns from ... by Osgood Carleton ; I. Norman, sc. It was published and sold by Osgood Carleton in 1797. Scale [ca. 1:4,170]. This layer is image 2 of 4 total images, representing the northeast portion of the four sheet source map. The image inside the map neatline is georeferenced to the surface of the earth and fit to the Massachusetts State Plane Coordinate System, Mainland Zone (in Feet) (Fipszone 2001). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, selected public buildings, city ward boundaries, wharves, and more. Relief shown by hachures.This layer is part of a selection of digitally scanned and georeferenced historic maps of Massachusetts from the Harvard Map Collection. These maps typically portray both natural and manmade features. The selection represents a range of regions, originators, ground condition dates (1755-1922), scales, and purposes. The digitized selection includes maps of: the state, Massachusetts counties, town surveys, coastal features, real property, parks, cemeteries, railroads, roads, public works projects, etc.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This layer is a georeferenced raster image of the historic paper map entitled: London surveyed, or, a new map of the cities of London and Westminster and the borough of Southwark : shewing the several streets and lanes with the most of the alleys & thorough fairs with the additional new buildings to this present year 1742. It was printed for John Bowles at the Black Horse in Cornhill in 1742. Scale [ca. 1:5,280]. The image inside the map neatline is georeferenced to the surface of the earth and fit to the British National Grid coordinate system (British National Grid, Airy Spheroid OSGB (1936) Datum). All map collar and inset information is also available as part of the raster image, including any inset maps, profiles, statistical tables, directories, text, illustrations, index maps, legends, or other information associated with the principal map. This map shows features such as roads, drainage, selected buildings (some shown pictorially), built-up areas, docks, city district boundaries, and more. Relief is shown pictorially. Includes illustrations, tables of fares, and views: South prospect of London -- North prospect of St. Paul's Cathedral -- Bank of England -- Front of the Royal Exchange -- Banqueting House -- Treasury. This layer is part of a selection of digitally scanned and georeferenced historic maps from The Harvard Map Collection as part of the Imaging the Urban Environment project. Maps selected for this project represent major urban areas and cities of the world, at various time periods. These maps typically portray both natural and manmade features at a large scale. The selection represents a range of regions, originators, ground condition dates, scales, and purposes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Federal Highway Administration, Washington, D.C.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

North Carolina Department of Transportation, Raleigh

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Program and Policy Planning, Washington, D.C.