982 resultados para Short implants


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The large increase of distributed energy resources, including distributed generation, storage systems and demand response, especially in distribution networks, makes the management of the available resources a more complex and crucial process. With wind based generation gaining relevance, in terms of the generation mix, the fact that wind forecasting accuracy rapidly drops with the increase of the forecast anticipation time requires to undertake short-term and very short-term re-scheduling so the final implemented solution enables the lowest possible operation costs. This paper proposes a methodology for energy resource scheduling in smart grids, considering day ahead, hour ahead and five minutes ahead scheduling. The short-term scheduling, undertaken five minutes ahead, takes advantage of the high accuracy of the very-short term wind forecasting providing the user with more efficient scheduling solutions. The proposed method uses a Genetic Algorithm based approach for optimization that is able to cope with the hard execution time constraint of short-term scheduling. Realistic power system simulation, based on PSCAD , is used to validate the obtained solutions. The paper includes a case study with a 33 bus distribution network with high penetration of distributed energy resources implemented in PSCAD .

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The large increase of Distributed Generation (DG) in Power Systems (PS) and specially in distribution networks makes the management of distribution generation resources an increasingly important issue. Beyond DG, other resources such as storage systems and demand response must be managed in order to obtain more efficient and “green” operation of PS. More players, such as aggregators or Virtual Power Players (VPP), that operate these kinds of resources will be appearing. This paper proposes a new methodology to solve the distribution network short term scheduling problem in the Smart Grid context. This methodology is based on a Genetic Algorithms (GA) approach for energy resource scheduling optimization and on PSCAD software to obtain realistic results for power system simulation. The paper includes a case study with 99 distributed generators, 208 loads and 27 storage units. The GA results for the determination of the economic dispatch considering the generation forecast, storage management and load curtailment in each period (one hour) are compared with the ones obtained with a Mixed Integer Non-Linear Programming (MINLP) approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJETIVO: Traduzir e validar para a língua portuguesa o questionário de qualidade de vida condição-específico denominado International Consultation on Incontinence Questionnaire - Short Form (ICIQ-SF) em pacientes com incontinência urinária. MÉTODOS: Duas traduções independentes do ICIQ-SF foram feitas por brasileiros, fluentes na língua inglesa. Após harmonização das mesmas, a tradução resultante foi retrotraduzida independentemente por dois nativos de países de língua inglesa. As diferenças foram harmonizadas e pré-testadas em um estudo piloto. A versão final do ICIQ-SF para o português, bem como a versão em português do King's Health Questionnaire (KHQ) foram aplicadas simultaneamente em 123 pacientes consecutivos com queixa de incontinência urinária (29 homens e 94 mulheres) que procuraram o laboratório de uroginecologia e o serviço de urodinâmica de um hospital universitário, localizado em Campinas. Foram testadas as propriedades psicométricas do questionário, como confiabilidade e validade de constructo. RESULTADOS: A idade mediana foi de 53 anos (intervalo de 16 a 86 anos). O período médio de reteste para o ICIQ-SF foi de 14,37 dias (intervalo de seis a 41 dias). Nenhuma alteração do formato original do ICIQ-SF foi observada no final do processo de tradução e adaptação cultural. A consistência interna foi alta, como demonstrado pelo coeficiente alfa de Cronbach (0,88). O resultado do teste-reteste foi considerado de moderado a forte, como indicado pelo índice Kappa ponderado, cujos valores variaram de 0,72 a 0,75, e o coeficiente de correlação de Pearson que foi de 0,89. A correlação entre o ICIQ-SF e o KHQ foi considerada de moderada a boa para a maioria dos itens, variando de 0,44 a 0,77. A avaliação das validades de constructo e concorrente foi também satisfatória e estatisticamente significante. CONCLUSÕES: A versão para o português do ICIQ-SF foi traduzida e validada com sucesso para aplicação em pacientes brasileiros de ambos os sexos, com queixa de incontinência urinária, apresentando satisfatória confiabilidade e validade de constructo.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Novel (E)-3-aryl-4-benzylidene-8-hydroxy-3,4-dihydro-1 H-xanthene-1,9(2H)-diones are prepared by the cyclization of (E,E)-3-cinnamoyl-5-hydroxy-2-styrylchromones efficiently catalyzed with boron tribromide. The (E,E)-3-cinnamoyl-5-hydroxy-2-styrylchromones are obtained from the Baker–Venkataraman rearrangement of (E,E)-2-acetyl-1,3-phenylene bis(3-phenylacrylate), which is greatly improved under microwave irradiation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Six time-depth recorders attached with suction-cups were deployed in resident and transient adult short-finned pilot whales to evaluate their daytime diving characteristics in their preferred habitat area off Madeira Island. Here, data on the proportion of time spent at the surface and at different dive phases (descent, bottom and ascent), dive depths and dive rates are presented. With mean attachment durations of 2 h 31 min (SD=2 h), the whales spent a considerable amount of time at the surface (mean=76.3%, SD=18.6) and presented a low diving rate (mean=6.8 dives h‾¹, SD=6.1; considering dive as submergence deeper than 10 m). The maximum dive depth recorded in this study was 988 m, and dives deeper than 500 m, which were recorded from resident and transient whales, suggest foraging activity along their preferred habitat area. The analysis of dives deeper than 100 m shows that the percentage of time spent on descent, bottom or ascent varied between dives, with means of ~40, 30 and 30%, respectively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: The purpose of this study was to investigate effects of different manual techniques on cervical ranges of 17 motion and pressure pain sensitivity in subjects with latent trigger point of the upper trapezius muscle. 18 Methods: One hundred seventeen volunteers, with a unilateral latent trigger point on upper trapezius due to computer 19 work, were randomly divided into 5 groups: ischemic compression (IC) group (n = 24); passive stretching group (n = 20 23); muscle energy technique group (n = 23); and 2 control groups, wait-and-see group (n = 25) and placebo group 21 (n = 22). Cervical spine range of movement was measured using a cervical range of motion instrument as well as 22 pressure pain sensitivity by means of an algometer and a visual analog scale. Outcomes were assessed pretreatment, 23 immediately, and 24 hours after the intervention and 1 week later by a blind researcher. A 4 × 5 mixed repeated- 24 measures analysis of variance was used to examine the effects of the intervention and Cohen d coefficient was used. 25 Results: A group-by-time interaction was detected in all variables (P b .01), except contralateral rotation. The 26 immediate effect sizes of the contralateral flexion, ipsilateral rotation, and pressure pain threshold were large for 3 27 experimental groups. Nevertheless, after 24 hours and 1 week, only IC group maintained the effect size. 28 Conclusions: Manual techniques on upper trapezius with latent trigger point seemed to improve the cervical range of 29 motion and the pressure pain sensitivity. These effects persist after 1 week in the IC group. (J Manipulative Physiol 301 Ther 2013;xx:1-10)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To develop and validate a short health literacy assessment tool for Portuguese-speaking adults. METHODS: The Short Assessment of Health Literacy for Portuguese-speaking Adults is an assessment tool which consists of 50 items that assess an individual's ability to correctly pronounce and understand common medical terms. We evaluated the instrument's psychometric properties in a convenience sample of 226 Brazilian older adults. Construct validity was assessed by correlating the tool scores with years of schooling, self-reported literacy, and global cognitive functioning. Discrimination validity was assessed by testing the tool's accuracy in detecting inadequate health literacy, defined as failure to fully understand standard medical prescriptions. RESULTS: Moderate to high correlations were found in the assessment of construct validity (Spearman's coefficients ranging from 0.63 to 0.76). The instrument showed adequate internal consistency (Cronbach's alpha=0.93) and adequate test-retest reliability (intraclass correlation coefficient=0.95). The area under the receiver operating characteristic curve for detection of inadequate health literacy was 0.82. A version consisting of 18 items was tested and showed similar psychometric properties. CONCLUSIONS: The instrument developed showed good validity and reliability in a sample of Brazilian older adults. It can be used in research and clinical settings for screening inadequate health literacy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aim - To use Monte Carlo (MC) together with voxel phantoms to analyze the tissue heterogeneity effect in the dose distributions and equivalent uniform dose (EUD) for (125)I prostate implants. Background - Dose distribution calculations in low dose-rate brachytherapy are based on the dose deposition around a single source in a water phantom. This formalism does not take into account tissue heterogeneities, interseed attenuation, or finite patient dimensions effects. Tissue composition is especially important due to the photoelectric effect. Materials and Methods - The computed tomographies (CT) of two patients with prostate cancer were used to create voxel phantoms for the MC simulations. An elemental composition and density were assigned to each structure. Densities of the prostate, vesicles, rectum and bladder were determined through the CT electronic densities of 100 patients. The same simulations were performed considering the same phantom as pure water. Results were compared via dose-volume histograms and EUD for the prostate and rectum. Results - The mean absorbed doses presented deviations of 3.3-4.0% for the prostate and of 2.3-4.9% for the rectum, when comparing calculations in water with calculations in the heterogeneous phantom. In the calculations in water, the prostate D 90 was overestimated by 2.8-3.9% and the rectum D 0.1cc resulted in dose differences of 6-8%. The EUD resulted in an overestimation of 3.5-3.7% for the prostate and of 7.7-8.3% for the rectum. Conclusions - The deposited dose was consistently overestimated for the simulation in water. In order to increase the accuracy in the determination of dose distributions, especially around the rectum, the introduction of the model-based algorithms is recommended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The MCNPX code was used to calculate the TG-43U1 recommended parameters in water and prostate tissue in order to quantify the dosimetric impact in 30 patients treated with (125)I prostate implants when replacing the TG-43U1 formalism parameters calculated in water by a prostate-like medium in the planning system (PS) and to evaluate the uncertainties associated with Monte Carlo (MC) calculations. The prostate density was obtained from the CT of 100 patients with prostate cancer. The deviations between our results for water and the TG-43U1 consensus dataset values were -2.6% for prostate V100, -13.0% for V150, and -5.8% for D90; -2.0% for rectum V100, and -5.1% for D0.1; -5.0% for urethra D10, and -5.1% for D30. The same differences between our water and prostate results were all under 0.3%. Uncertainties estimations were up to 2.9% for the gL(r) function, 13.4% for the F(r,θ) function and 7.0% for Λ, mainly due to seed geometry uncertainties. Uncertainties in extracting the TG-43U1 parameters in the MC simulations as well as in the literature comparison are of the same order of magnitude as the differences between dose distributions computed for water and prostate-like medium. The selection of the parameters for the PS should be done carefully, as it may considerably affect the dose distributions. The seeds internal geometry uncertainties are a major limiting factor in the MC parameters deduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is on the maximization of total profit in a day-ahead market for a price-taker producer needing a short-term scheduling for wind power plants coordination with concentrated solar power plants, having thermal energy storage systems. The optimization approach proposed for the maximization of profit is a mixed-integer linear programming problem. The approach considers not only transmission grid constraints, but also technical operating constraints on both wind and concentrated solar power plants. Then, an improved short-term scheduling coordination is provided due to the more accurate modelling presented in this paper. Computer simulation results based on data for the Iberian wind and concentrated solar power plants illustrate the coordination benefits and show the effectiveness of the approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As it is well known, competitive electricity markets require new computing tools for generation companies to enhance the management of its resources. The economic value of the water stored in a power system reservoir is crucial information for enhancing the management of the reservoirs. This paper proposes a practical deterministic approach for computing the short-term economic value of the water stored in a power system reservoir, emphasizing the need to considerer water stored as a scarce resource with a short-term economic value. The paper addresses a problem concerning reservoirs with small storage capacities, i.e., the reservoirs considered as head-sensitivity. More precisely, the respective hydro plant is head-dependent and a pure linear approach is unable to capture such consideration. The paper presents a case study supported by the proposed practical deterministic approach and applied on a real multi-reservoir power system with three cascaded reservoirs, considering as input data forecasts for the electric energy price and for the natural inflow into the reservoirs over the schedule time horizon. The paper presents various water schedules due to different final stored water volume conditions on the reservoirs. Also, it presents the respective economic value of the water for the reservoirs at different stored water volume conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electricity short-term load forecast is very important for the operation of power systems. In this work a classical exponential smoothing model, the Holt-Winters with double seasonality was used to test for accurate predictions applied to the Portuguese demand time series. Some metaheuristic algorithms for the optimal selection of the smoothing parameters of the Holt-Winters forecast function were used and the results after testing in the time series showed little differences among methods, so the use of the simple local search algorithms is recommended as they are easier to implement.