995 resultados para River Terminal Railway Company
Resumo:
Memorandum of expenses for work done and materials provided by Messrs. Brown and McDonell, contractors for the Port Dalhousie and Thorold Railway to Sept. 1, 1854, signed by S.D. Woodruff, Sept. 2, 1854.
Resumo:
Letter which gives an addition to the estimate for work done by John Brown for Dec. 1855. This is made out to S.D. Woodruff from Francis Lalor. The request is for money for extra ties, fence posts, stone and labour. The letter is slightly singed at the bottom. This does not affect the text, Jan. 3, 1856.
Resumo:
Letter to S.D. Woodruff from F. Lalor, assistant engineer. This is an estimate of work done by John Brown between Grantham and Thorold, Mar. 4, 1856.
Resumo:
Chart of the estimated cost of Line no. 1, n.d.
Resumo:
Letter from William Hamilton Merritt to S.D. Woodruff asking to see the report, n.d.
Resumo:
Letter regarding an estimate of lowering the grade as suggested by William Hamilton Merritt. This was sent to S.D. Woodruff from F. Shanly, May 22, 1857.
Resumo:
Memorandum respecting differences between the approximate and the final estimate (3 ¼ pages, handwritten), n.d.
Resumo:
Memorandum of fencing done signed by F. Lalor, n.d.
Resumo:
Note to S.D. Woodruff regarding the plan of operation. First, “draw up a report showing the cost of work”. This note is unsigned, n.d.
Resumo:
Receipt for payment from S.D. Woodruff from Hiram Slate, Jan. 1859
Resumo:
Cross sections of excavation required to make a ditch on the earth side of the railroad near Port Dalhousie. This is a 12 page booklet of hand- drawn charts and diagrams which is slightly stained. Text is not affected, Mar. 1860.
Resumo:
Letter to S.D. Woodruff from Fred Holmes regarding the work done on the east side of the rail track. He gives the measurement of work done by W. Robinson, May 18, 1860.
Resumo:
Letter to S.D. Woodruff from Fred Holmes noting how many days work were done by him, William Stoker and Thomas Secord, Aug. 27, 1860.
Resumo:
Voucher #22 to James McCoppen (copy) which includes a letter from James McCoppen regarding a claim for having water backed up into his grain and grass by the embankment of the railroad. The letter is dated June 24, 1857 and the voucher is dated Jul. 1, 1857.
Resumo:
Durante cinco anos, foi intervencionada e estudada, a sinistralidade laboral numa transportadora ferroviária. O controlo de riscos nela experimentado explorou o potencial preventivo de medidas de controlo do comportamento dos colaboradores, tais como: Formação para promover comportamentos preventivos; Intensificação da prevenção, controlo e recuperação do abuso de álcool e drogas; Informação motivadora para as boas práticas. Consequentemente: Inverteu-se rapidamente a tendência crescente da sinistralidade, sem aumentar custos; Mantiveram-se, durante um período de continuada redução do efectivo laboral, níveis de sinistralidade laboral inferiores aos verificados no início da pesquisa; Demonstrou-se a sustentabilidade financeira do investimento em Segurança e Saúde do Trabalho. During five years, an intervention, over the occupational accidents of a railway company, was studied. The control of risks that has been tested, explored the preventive potential of control measures towards employees’ behaviour, such as: Training to promote preventive behaviours; Stepping up prevention, control and recovery of alcohol and drugs abuse; Motivating information to good practices. Consequently: It quickly reversed the trend of accidents, without increasing the costs; During a period of continued reduction of employees, levels of occupational accidents remained below those recorded at the beginning of research; Financial sustainability of investment in Occupational Health and Safety was demonstrated.