928 resultados para Power Reactor Development Co.
Resumo:
Problems faced by the fishery sector in Nigeria are examined and the role that agricultural cooperatives play in fishery development considered. The importance of improving the marketing and distribution system through fishermen cooperatives is stressed. It is concluded that for the successful implementation of fishery products, there is need for regular communication, cooperation and collaboration among relative agencies
Resumo:
A compact 10-TW/100-fs level ultrashort-pulse and ultra-intense laser system at 1064 nm based on optical parametric chirped pulse amplification (OPCPA) scheme is described, at which the pump and seed for the optical parametric amplification (OPA) process is optically synchronized. We investigated the output stability and the conversion efficiency of the system. Moreover, a design toward higher peak power output is given and an optically synchronized amplifier based on the concept of OPCPA at 800 nm is preliminarily explored.
Resumo:
There has been a recent surge of enthusiasm icithin tlie automotive industry to build closer supplier relationships idthin the area of product development. One concept deemed central to these relationships is the alignment of development processes between the collaborating organizations, an area that is expanded upon idthin this paper. We suggest that synchronization can be achieved through the four key steps of process standardization, knowledge sliaring, alignment of existing practices, and continuous elimination oftcaste idthin the joint development cycles. A methodology for implementing these stages is presented along idth the underlying prindples on which it is based - the importance of joint teamworking and multi-company involvement idthin the alignment process is higlilighted. © MCB University Press.
Resumo:
We study three contractual arrangements—co-development, licensing, and co-development with opt-out options—for the joint development of new products between a small and financially constrained innovator firm and a large technology company, as in the case of a biotech innovator and a major pharma company. We formulate our arguments in the context of a two-stage model, characterized by technical risk and stochastically changing cost and revenue projections. The model captures the main disadvantages of traditional co-development and licensing arrangements: in co-development the small firm runs a risk of running out of capital as future costs rise, while licensing for milestone and royalty (M&R) payments, which eliminates the latter risk, introduces inefficiency, as profitable projects might be abandoned. Counter to intuition we show that the biotech's payoff in a licensing contract is not monotonically increasing in the M&R terms. We also show that an option clause in a co-development contract that gives the small firm the right but not the obligation to opt out of co-development and into a pre-agreed licensing arrangement avoids the problems associated with fully committed co-development or licensing: the probability that the small firm will run out of capital is greatly reduced or completely eliminated and profitable projects are never abandoned.
Resumo:
This paper presents the steps and the challenges for implementing analytical, physics-based models for the insulated gate bipolar transistor (IGBT) and the PIN diode in hardware and more specifically in field programmable gate arrays (FPGAs). The models can be utilised in hardware co-simulation of complex power electronic converters and entire power systems in order to reduce the simulation time without compromising the accuracy of results. Such a co-simulation allows reliable prediction of the system's performance as well as accurate investigation of the power devices' behaviour during operation. Ultimately, this will allow application-specific optimisation of the devices' structure, circuit topologies as well as enhancement of the control and/or protection schemes.
Resumo:
Over 100 suppliers have now taken part in an initiative built to improve joint design and development performance of tier one suppliers and one vehicle manufacturer. Significant targets were set - 30 % cost down and 30% faster design time with 40% less development budget - and achieved An analysis of the initiative was used to determine the critical success factors. These include significant detail findings in the areas of performance measurement and alignment of development processes. Equal attention is given to understanding how co-development can be implemented and the paper will present findings related to objectivity, perception of partners and partnerships. Copyright © 2002 Society of Automotive Engineers, Inc.
Cobalt loss from Co-ZrO2 catalyst for fischer-tropsch synthesis in continuously stirred tank reactor
Resumo:
研制了兰州重离子加速器冷却储存环(HIRFL-CSR)二极磁铁电源,提出了一种基于晶闸管相控整流技术和IGBT脉宽调制(PWM)变换技术的同步加速器二极磁铁电源的设计方案,分析、仿真了其工作原理,并设计、生产了1套完整的电源样机。经现场试验、长期运行及测试,电流稳定度<±5×10-5/8h,跟踪精度<±2×10-4,电流纹波<1×10-5。该方案满足HIRFL-CSR二极磁铁对电源技术指标的要求。
Resumo:
Three Polypropylene/Poly(ethylene-co-propylene) (PP/EPR) in-reactor alloys produced by a two-stage slurry/gas polymerization had different ethylene contents and mechanical properties, which were achieved by controlling the copolymerization time. The three alloys were fractionated into five fractions via temperature rising dissolution fractionation (TRDF), respectively. The chain structures of the whole samples and their fractions were analyzed using high-temperature gel permeation chromatography (GPC), Fourier transform infrared (FT-IR), C-13 nuclear magnetic resonance (C-13 NMR), and differential scanning calorimetry (DSC) techniques. These three in-reactor alloys mainly contained four portions: ethylenepropylene random copolymer (EPR), ethylene-propylene (EP) segmented and block copolymers, and propylene homopolymer. The increased copolymerization time caused the increased ethylene content of the sample. The weight percent of EPR, EP segmented and block copolymer also became higher.