978 resultados para Operational planning
Resumo:
Executive summary Objective: The aims of this study were to identify the impact of Pandemic (H1N1) 2009 Influenza on Australian Emergency Departments (EDs) and their staff, and to inform planning, preparedness, and response management arrangements for future pandemics, as well as managing infectious patients presenting to EDs in everyday practice. Methods This study involved three elements: 1. The first element of the study was an examination of published material including published statistics. Standard literature research methods were used to identify relevant published articles. In addition, data about ED demand was obtained from Australian Government Department of Health and Ageing (DoHA) publications, with several state health departments providing more detailed data. 2. The second element of the study was a survey of Directors of Emergency Medicine identified with the assistance of the Australasian College for Emergency Medicine (ACEM). This survey retrieved data about demand for ED services and elicited qualitative comments on the impact of the pandemic on ED management. 3. The third element of the study was a survey of ED staff. A questionnaire was emailed to members of three professional colleges—the ACEM; the Australian College of Emergency Nursing (ACEN); and the College of Emergency Nursing Australasia (CENA). The overall response rate for the survey was 18.4%, with 618 usable responses from 3355 distributed questionnaires. Topics covered by the survey included ED conditions during the (H1N1) 2009 influenza pandemic; information received about Pandemic (H1N1) 2009 Influenza; pandemic plans; the impact of the pandemic on ED staff with respect to stress; illness prevention measures; support received from others in work role; staff and others’ illness during the pandemic; other factors causing ED staff to miss work during the pandemic; and vaccination against Pandemic (H1N1) 2009 Influenza. Both qualitative and quantitative data were collected and analysed. Results: The results obtained from Directors of Emergency Medicine quantifying the impact of the pandemic were too limited for interpretation. Data sourced from health departments and published sources demonstrated an increase in influenza-like illness (ILI) presentations of between one and a half and three times the normal level of presentations of ILIs. Directors of Emergency Medicine reported a reasonable level of preparation for the pandemic, with most reporting the use of pandemic plans that translated into relatively effective operational infection control responses. Directors reported a highly significant impact on EDs and their staff from the pandemic. Growth in demand and related ED congestion were highly significant factors causing distress within the departments. Most (64%) respondents established a ‘flu clinic’ either as part of Pandemic (H1N1) 2009 Influenza Outbreak in Australia: Impact on Emergency Departments. the ED operations or external to it. They did not note a significantly higher rate of sick leave than usual. Responses relating to the impact on staff were proportional to the size of the colleges. Most respondents felt strongly that Pandemic (H1N1) 2009 Influenza had a significant impact on demand in their ED, with most patients having low levels of clinical urgency. Most respondents felt that the pandemic had a negative impact on the care of other patients, and 94% revealed some increase in stress due to lack of space for patients, increased demand, and filling staff deficits. Levels of concern about themselves or their family members contracting the illness were less significant than expected. Nurses displayed significantly higher levels of stress overall, particularly in relation to skill-mix requirements, lack of supplies and equipment, and patient and patients’ family aggression. More than one-third of respondents became ill with an ILI. Whilst respondents themselves reported taking low levels of sick leave, respondents cited difficulties with replacing absent staff. Ranked from highest to lowest, respondents gained useful support from ED colleagues, ED administration, their hospital occupational health department, hospital administration, professional colleges, state health department, and their unions. Respondents were generally positive about the information they received overall; however, the volume of information was considered excessive and sometimes inconsistent. The media was criticised as scaremongering and sensationalist and as being the cause of many unnecessary presentations to EDs. Of concern to the investigators was that a large proportion (43%) of respondents did not know whether a pandemic plan existed for their department or hospital. A small number of staff reported being redeployed from their usual workplace for personal risk factors or operational reasons. As at the time of survey (29 October –18 December 2009), 26% of ED staff reported being vaccinated against Pandemic (H1N1) 2009 Influenza. Of those not vaccinated, half indicated they would ‘definitely’ or ‘probably’ not get vaccinated, with the main reasons being the vaccine was ‘rushed into production’, ‘not properly tested’, ‘came out too late’, or not needed due to prior infection or exposure, or due to the mildness of the disease. Conclusion: Pandemic (H1N1) 2009 Influenza had a significant impact on Australian Emergency Departments. The pandemic exposed problems in existing plans, particularly a lack of guidelines, general information overload, and confusion due to the lack of a single authoritative information source. Of concern was the high proportion of respondents who did not know if their hospital or department had a pandemic plan. Nationally, the pandemic communication strategy needs a detailed review, with more engagement with media networks to encourage responsible and consistent reporting. Also of concern was the low level of immunisation, and the low level of intention to accept vaccination. This is a problem seen in many previous studies relating to seasonal influenza and health care workers. The design of EDs needs to be addressed to better manage infectious patients. Significant workforce issues were confronted in this pandemic, including maintaining appropriate staffing levels; staff exposure to illness; access to, and appropriate use of, personal protective equipment (PPE); and the difficulties associated with working in PPE for prolonged periods. An administrative issue of note was the reporting requirement, which created considerable additional stress for staff within EDs. Peer and local support strategies helped ensure staff felt their needs were provided for, creating resilience, dependability, and stability in the ED workforce. Policies regarding the establishment of flu clinics need to be reviewed. The ability to create surge capacity within EDs by considering staffing, equipment, physical space, and stores is of primary importance for future pandemics.
Resumo:
Predicting safety on roadways is standard practice for road safety professionals and has a corresponding extensive literature. The majority of safety prediction models are estimated using roadway segment and intersection (microscale) data, while more recently efforts have been undertaken to predict safety at the planning level (macroscale). Safety prediction models typically include roadway, operations, and exposure variables—factors known to affect safety in fundamental ways. Environmental variables, in particular variables attempting to capture the effect of rain on road safety, are difficult to obtain and have rarely been considered. In the few cases weather variables have been included, historical averages rather than actual weather conditions during which crashes are observed have been used. Without the inclusion of weather related variables researchers have had difficulty explaining regional differences in the safety performance of various entities (e.g. intersections, road segments, highways, etc.) As part of the NCHRP 8-44 research effort, researchers developed PLANSAFE, or planning level safety prediction models. These models make use of socio-economic, demographic, and roadway variables for predicting planning level safety. Accounting for regional differences - similar to the experience for microscale safety models - has been problematic during the development of planning level safety prediction models. More specifically, without weather related variables there is an insufficient set of variables for explaining safety differences across regions and states. Furthermore, omitted variable bias resulting from excluding these important variables may adversely impact the coefficients of included variables, thus contributing to difficulty in model interpretation and accuracy. This paper summarizes the results of an effort to include weather related variables, particularly various measures of rainfall, into accident frequency prediction and the prediction of the frequency of fatal and/or injury degree of severity crash models. The purpose of the study was to determine whether these variables do in fact improve overall goodness of fit of the models, whether these variables may explain some or all of observed regional differences, and identifying the estimated effects of rainfall on safety. The models are based on Traffic Analysis Zone level datasets from Michigan, and Pima and Maricopa Counties in Arizona. Numerous rain-related variables were found to be statistically significant, selected rain related variables improved the overall goodness of fit, and inclusion of these variables reduced the portion of the model explained by the constant in the base models without weather variables. Rain tends to diminish safety, as expected, in fairly complex ways, depending on rain frequency and intensity.
Resumo:
At least two important transportation planning activities rely on planning-level crash prediction models. One is motivated by the Transportation Equity Act for the 21st Century, which requires departments of transportation and metropolitan planning organizations to consider safety explicitly in the transportation planning process. The second could arise from a need for state agencies to establish incentive programs to reduce injuries and save lives. Both applications require a forecast of safety for a future period. Planning-level crash prediction models for the Tucson, Arizona, metropolitan region are presented to demonstrate the feasibility of such models. Data were separated into fatal, injury, and property-damage crashes. To accommodate overdispersion in the data, negative binomial regression models were applied. To accommodate the simultaneity of fatality and injury crash outcomes, simultaneous estimation of the models was conducted. All models produce crash forecasts at the traffic analysis zone level. Statistically significant (p-values < 0.05) and theoretically meaningful variables for the fatal crash model included population density, persons 17 years old or younger as a percentage of the total population, and intersection density. Significant variables for the injury and property-damage crash models were population density, number of employees, intersections density, percentage of miles of principal arterial, percentage of miles of minor arterials, and percentage of miles of urban collectors. Among several conclusions it is suggested that planning-level safety models are feasible and may play a role in future planning activities. However, caution must be exercised with such models.
Resumo:
In recent years the development and use of crash prediction models for roadway safety analyses have received substantial attention. These models, also known as safety performance functions (SPFs), relate the expected crash frequency of roadway elements (intersections, road segments, on-ramps) to traffic volumes and other geometric and operational characteristics. A commonly practiced approach for applying intersection SPFs is to assume that crash types occur in fixed proportions (e.g., rear-end crashes make up 20% of crashes, angle crashes 35%, and so forth) and then apply these fixed proportions to crash totals to estimate crash frequencies by type. As demonstrated in this paper, such a practice makes questionable assumptions and results in considerable error in estimating crash proportions. Through the use of rudimentary SPFs based solely on the annual average daily traffic (AADT) of major and minor roads, the homogeneity-in-proportions assumption is shown not to hold across AADT, because crash proportions vary as a function of both major and minor road AADT. For example, with minor road AADT of 400 vehicles per day, the proportion of intersecting-direction crashes decreases from about 50% with 2,000 major road AADT to about 15% with 82,000 AADT. Same-direction crashes increase from about 15% to 55% for the same comparison. The homogeneity-in-proportions assumption should be abandoned, and crash type models should be used to predict crash frequency by crash type. SPFs that use additional geometric variables would only exacerbate the problem quantified here. Comparison of models for different crash types using additional geometric variables remains the subject of future research.
Resumo:
Understanding the expected safety performance of rural signalized intersections is critical for (a) identifying high-risk sites where the observed safety performance is substantially worse than the expected safety performance, (b) understanding influential factors associated with crashes, and (c) predicting the future performance of sites and helping plan safety-enhancing activities. These three critical activities are routinely conducted for safety management and planning purposes in jurisdictions throughout the United States and around the world. This paper aims to develop baseline expected safety performance functions of rural signalized intersections in South Korea, which to date have not yet been established or reported in the literature. Data are examined from numerous locations within South Korea for both three-legged and four-legged configurations. The safety effects of a host of operational and geometric variables on the safety performance of these sites are also examined. In addition, supplementary tables and graphs are developed for comparing the baseline safety performance of sites with various geometric and operational features. These graphs identify how various factors are associated with safety. The expected safety prediction tables offer advantages over regression prediction equations by allowing the safety manager to isolate specific features of the intersections and examine their impact on expected safety. The examination of the expected safety performance tables through illustrated examples highlights the need to correct for regression-to-the-mean effects, emphasizes the negative impacts of multicollinearity, shows why multivariate models do not translate well to accident modification factors, and illuminates the need to examine road safety carefully and methodically. Caveats are provided on the use of the safety performance prediction graphs developed in this paper.
Resumo:
The Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 mandated the consideration of safety in the regional transportation planning process. As part of National Cooperative Highway Research Program Project 8-44, "Incorporating Safety into the Transportation Planning Process," we conducted a telephone survey to assess safety-related activities and expertise at Governors Highway Safety Associations (GHSAs), and GHSA relationships with metropolitan planning organizations (MPOs) and state departments of transportation (DOTs). The survey results were combined with statewide crash data to enable exploratory modeling of the relationship between GHSA policies and programs and statewide safety. The modeling objective was to illuminate current hurdles to ISTEA implementation, so that appropriate institutional, analytical, and personnel improvements can be made. The study revealed that coordination of transportation safety across DOTs, MPOs, GHSAs, and departments of public safety is generally beneficial to the implementation of safety. In addition, better coordination is characterized by more positive and constructive attitudes toward incorporating safety into planning.
Resumo:
Open access reforms to railway regulations allow multiple train operators to provide rail services on a common infrastructure. As railway operations are now independently managed by different stakeholders, conflicts in operations may arise, and there have been attempts to derive an effective access charge regime so that these conflicts may be resolved. One approach is by direct negotiation between the infrastructure manager and the train service providers. Despite the substantial literature on the topic, few consider the benefits of employing computer simulation as an evaluation tool for railway operational activities such as access pricing. This article proposes a multi-agent system (MAS) framework for the railway open market and demonstrates its feasibility by modelling the negotiation between an infrastructure provider and a train service operator. Empirical results show that the model is capable of resolving operational conflicts according to market demand.
Resumo:
The track allocation problem (TAP) at a multi-track, multi-platform mainline railway station is defined by the station track layout and service timetable, which implies combinations of spatial and temporal conflicts. Feasible solutions are available from either traditional planning or advanced intelligent searching methods and their evaluations with respect to operational requirements are essential for the operators. To facilitate thorough analysis, a timed Coloured Petri Nets (CPN) model is presented here to encapsulate the inter-relationships of the spatial and temporal constraints in the TAP.
Resumo:
The field of collaborative health planning faces significant challenges due to the lack of effective information, systems and the absence of a framework to make informed decisions. These challenges have been magnified by the rise of the healthy cities movement, consequently, there have been more frequent calls for localised, collaborative and evidence-driven decision-making. Some studies in the past have reported that the use of decision support systems (DSS) for planning healthy cities may lead to: increase collaboration between stakeholders and the general public, improve the accuracy and quality of the decision-making processes and improve the availability of data and information for health decision-makers. These links have not yet been fully tested and only a handful of studies have evaluated the impact of DSS on stakeholders, policy-makers and health planners. This study suggests a framework for developing healthy cities and introduces an online Geographic Information Systems (GIS)-based DSS for improving the collaborative health planning. It also presents preliminary findings of an ongoing case study conducted in the Logan-Beaudesert region of Queensland, Australia. These findings highlight the perceptions of decision-making prior to the implementation of the DSS intervention. Further, the findings help us to understand the potential role of the DSS to improve collaborative health planning practice.
Resumo:
The field of collaborative health planning faces significant challenges posed by the lack of effective information, systems and a framework to organise that information. Such a framework is critical in order to make accessible and informed decisions for planning healthy cities. The challenges have been exaggerated by the rise of the healthy cities movement, as a result of which, there have been more frequent calls for localised, collaborative and evidence-based decision-making. Some studies suggest that the use of ICT-based tools in health planning may lead to: increased collaboration between stakeholder sand the community; improve the accuracy and quality of the decision making process; and, improve the availability of data and information for health decision-makers as well as health service planners. Research has justified the use of decision support systems (DSS) in planning for healthy cities as these systems have been found to improve the planning process. DSS are information communication technology (ICT) tools including geographic information systems (GIS) that provide the mechanisms to help decision-makers and related stake holders assess complex problems and solve these in a meaningful way. Consequently, it is now more possible than ever before to make use of ICT-based tools in health planning. However, knowledge about the nature and use of DSS within collaborative health planning is relatively limited. In particular, little research has been conducted in terms of evaluating the impact of adopting these tools upon stakeholders, policy-makers and decision-makers within the health planning field. This paper presents an integrated method that has been developed to facilitate an informed decision-making process to assist in the health planning process. Specifically, the paper describes the participatory process that has been adopted to develop an online GIS-based DSS for health planners. The literature states that the overall aim of DSS is to improve the efficiency of the decisions made by stakeholders, optimising their overall performance and minimizing judgmental biases. For this reason, the paper examines the effectiveness and impact of an innovative online GIS-based DSS on health planners. The case study of the online DSS is set within a unique settings-based initiative designed to plan for and improve the health capacity of Logan-Beaudesert area, Australia. This unique setting-based initiative is named the Logan-Beaudesert Health Coalition (LBHC).The paper outlines the impact occurred by implementing the ICT-based DSS. In conclusion, the paper emphasizes upon the need for the proposed tool for enhancing health planning.
Resumo:
Purpose – The purpose of this paper is to examine the role of three strategies - organisational, business and information system – in post implementation of technological innovations. The findings reported in the paper are that improvements in operational performance can only be achieved by aligning technological innovation effectiveness with operational effectiveness. Design/methodology/approach – A combination of qualitative and quantitative methods was used to apply a two-stage methodological approach. Unstructured and semi structured interviews, based on the findings of the literature, were used to identify key factors used in the survey instrument design. Confirmatory factor analysis (CFA) was used to examine structural relationships between the set of observed variables and the set of continuous latent variables. Findings – Initial findings suggest that organisations looking for improvements in operational performance through adoption of technological innovations need to align with operational strategies of the firm. Impact of operational effectiveness and technological innovation effectiveness are related directly and significantly to improved operational performance. Perception of increase of operational effectiveness is positively and significantly correlated with improved operational performance. The findings suggest that technological innovation effectiveness is also positively correlated with improved operational performance. However, the study found that there is no direct influence of strategiesorganisational, business and information systems (IS) - on improvement of operational performance. Improved operational performance is the result of interactions between the implementation of strategies and related outcomes of both technological innovation and operational effectiveness. Practical implications – Some organisations are using technological innovations such as enterprise information systems to innovate through improvements in operational performance. However, they often focus strategically only on effectiveness of technological innovation or on operational effectiveness. Such a focus will be detrimental in the long-term of the enterprise. This research demonstrated that it is not possible to achieve maximum returns through technological innovations as dimensions of operational effectiveness need to be aligned with technological innovations to improve their operational performance. Originality/value – No single technological innovation implementation can deliver a sustained competitive advantage; rather, an advantage is obtained through the capacity of an organisation to exploit technological innovations’ functionality on a continuous basis. To achieve sustainable results, technology strategy must be aligned with organisational and operational strategies. This research proposes the key performance objectives and dimensions that organisations should focus to achieve a strategic alignment. Research limitations/implications – The principal limitation of this study is that the findings are based on investigation of small sample size. There is a need to explore the appropriateness of influence of scale prior to generalizing the results of this study.
Resumo:
Groundwater is increasingly recognised as an important yet vulnerable natural resource, and a key consideration in water cycle management. However, communication of sub-surface water system behaviour, as an important part of encouraging better water management, is visually difficult. Modern 3D visualisation techniques can be used to effectively communicate these complex behaviours to engage and inform community stakeholders. Most software developed for this purpose is expensive and requires specialist skills. The Groundwater Visualisation System (GVS) developed by QUT integrates a wide range of surface and sub-surface data, to produce a 3D visualisation of the behaviour, structure and connectivity of groundwater/surface water systems. Surface data (elevation, surface water, land use, vegetation and geology) and data collected from boreholes (bore locations and subsurface geology) are combined to visualise the nature, structure and connectivity of groundwater/surface water systems. Time-series data (water levels, groundwater quality, rainfall, stream flow and groundwater abstraction) is displayed as an animation within the 3D framework, or graphically, to show water system condition changes over time. GVS delivers an interactive, stand-alone 3D Visualisation product that can be used in a standard PC environment. No specialised training or modelling skills are required. The software has been used extensively in the SEQ region to inform and engage both water managers and the community alike. Examples will be given of GVS visualisations developed in areas where there have been community concerns around groundwater over-use and contamination.
Resumo:
The development of locally-based healthcare initiatives, such as community health coalitions that focus on capacity building programs and multi-faceted responses to long-term health problems, have become an increasingly important part of the public health landscape. As a result of their complexity and the level of investment, it has become necessary to develop innovative ways to help manage these new healthcare approaches. Geographical Information Systems (GIS) have been suggested as one of the innovative approaches that will allow community health coalitions to better manage and plan their activities. The focus of this paper is to provide a commentary on the use of GIS as a tool for community coalitions and discuss some of the potential benefits and issues surrounding the development of these tools.
Resumo:
The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.
Resumo:
The widespread use of business planning in combination with the mixed theoretical and empirical support for its effect suggest research is needed that takes a deeper into the quality of plans and how they are used. In this study we longitudinally examine use vs. non-use; degree of formalizations; revision of plans, and moderation of planning effects by product novelty,among nascent firms. We relate these to attainment of profitability after 12 months. We find that business planning is negatively related to profitability, but that revising plans is positively related to profitability. Both these effects are stronger under conditions of high product novelty.